13.07.2015 Views

Statement of Work Sub-Task: Tracking Data Reader/Writer

Statement of Work Sub-Task: Tracking Data Reader/Writer

Statement of Work Sub-Task: Tracking Data Reader/Writer

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

formats for specific data types are not fully specified, the contractor shall extend theformats using established CCSDS and FDF standards.<strong>Sub</strong>-<strong>Task</strong>: Navigation Component Development<strong>Task</strong> Scope: The contractor shall resume development <strong>of</strong> GMAT navigation components bydocumenting, refactoring, and testing selected navigation components developed, but notcompleted, under previous development efforts. The contractor shall also implement newfunctionality identified below. Upon completion <strong>of</strong> this effort, the selected navigationcomponents will be fully documented, tested, and free <strong>of</strong> critical bugs.The primary activities are:(1) Review and document the status <strong>of</strong> the estimation subsystem and providerecommendations for refactoring and modularization to support extensibility for newestimators, data types, and solve-for parameters.(2) Perform selected, high priority re-factorizations <strong>of</strong> GMAT navigation components. . Thecontractor shall prioritize re-factorizations to support extensibility in the areas <strong>of</strong> newmeasurement data types, , new solve-for parameters.(3) Perform V&V, update documentation, test, and resolve critical defects for selected,existing navigation subsystem components.Batch least squares estimatorMeasurement simulatorSensorso Transmittero Transpondero Antennao Receiver<strong>Tracking</strong> Systems/Measurement Modelso USN• Two-way rangeo TDRSS• 4-way range(4) Implement at minimum one <strong>of</strong> the following new tracking data models by direction <strong>of</strong>the task monitorTDRSS differenced one-way DopplerTDRSS five-leg, two-way DopplerTDRSS two-leg two-way tone range measurements from the TT&C linkProcess Requirements: The contractor shall use standard GMAT processes fordocumentation, test procedures, issue tracking, and regression testing.Staffing Requirements: This task shall be staffed with a team composed <strong>of</strong> senior s<strong>of</strong>twareengineers trained in C++ and s<strong>of</strong>tware engineering practices, advanced working knowledgein GMAT’s design and implementation, s<strong>of</strong>tware testers, and technical writers for end-userdocumentation.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!