- Page 1: 7PROTEUS DESIGN INC.THE PROTEUSFRAM
- Page 5: I would like to thank the following
- Page 9: Painting''Metal Preparation 77Apply
- Page 12 and 13: Just get ones with metric, or Engli
- Page 14 and 15: ,It is not necessary to use differe
- Page 16 and 17: .frame more responsive and less ene
- Page 18 and 19: The other consideration, clearance,
- Page 20 and 21: Thisthe axle center to the ground.
- Page 22 and 23: connecting the center of the bottom
- Page 24 and 25: Roadgauge of tubing. Most sets avai
- Page 26 and 27: efore any damage will occur. So eve
- Page 28: The first miter you will work on is
- Page 31 and 32: the bottom bracket shell and hold t
- Page 33: Preparing the LugsThe next step is
- Page 36 and 37: CenterlineFig. 3If possible, use so
- Page 38 and 39: area where the clamp was. Turn the
- Page 40 and 41: .8the frame will have cooled enough
- Page 42 and 43: .touch anything. You don't have to
- Page 44 and 45: kept in mind. First, the style of j
- Page 46 and 47: The dropout may be able to swing a
- Page 48 and 49: Using the scribe marks as a guide,
- Page 50 and 51: Gently remove the wheel. Don't worr
- Page 52 and 53:
and bend the dropout to correct the
- Page 54:
that you are ruining your frame. Th
- Page 58:
.Use a small round file for this. T
- Page 61 and 62:
crushed. At this point the end shou
- Page 63 and 64:
especially true with silver, which
- Page 65 and 66:
emain in the right place and you ca
- Page 68 and 69:
.is much easier to work on them whe
- Page 71 and 72:
the board. (See Fig. 5B.)Lay the st
- Page 73 and 74:
Fixing the 2" x 4" axle assembly to
- Page 75 and 76:
Correct blade angle ,. WrongangleFi
- Page 77 and 78:
the right and left measurements are
- Page 79 and 80:
ItLots of points, you may want to s
- Page 81 and 82:
the lugs and fork crown. For final
- Page 83 and 84:
PointsNext, using a curved or large
- Page 85 and 86:
frame. Two popular styles are domed
- Page 87 and 88:
IPaintingrub your fingers over all
- Page 90 and 91:
.necessary to use small pieces of s
- Page 92 and 93:
Fig 2
- Page 94 and 95:
.wascomplete.Applying the PrimerA p
- Page 96 and 97:
.ofthink it'd be clean. Chances are
- Page 98 and 99:
a similar method. At- this point it
- Page 100 and 101:
To..only exposed a few tiny spots o
- Page 102 and 103:
Peoplepaint to give a bright, shiny
- Page 104 and 105:
OneAcrylic.and the frame can be bui
- Page 106 and 107:
the frame members apart. The diffic
- Page 108 and 109:
\bottom bracket or the seat tube ou
- Page 110 and 111:
Seat & Chain Stays 4 piecesFork Col
- Page 112:
Proteus Design framebuilders are pr