13.07.2015 Views

Friatec Electrofusion Assembly Instructions

Friatec Electrofusion Assembly Instructions

Friatec Electrofusion Assembly Instructions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

and which contains information about the sense of rotation as well as the torquesfor opening and closing of the valve.A bottom plate can be used to increase the support area of the FRIALOC PEshut-off valve in the ditch bottom. The bottom plate made of PE is installed atthe four supports of the FRIALOC PE shut-off valve by using suitable screws.The valve may not be designed as fixed point of the piping to absorb forcessuch as e.g. flow impulses because of change of direction of the flowing materialor because of thermal elongation of the pipes.The valve must be sufficiently covered before working with the usual groundcompacting devices.10.5 TestPressure testThe piping is subjected to a pressure test according to W400-2, which mayonly be performed with fully opened valve (as delivered).FlushingThe piping is flushed according to W400-2 with opened valve.10.6 OperationThe FRIALOC PE shut-off valve is closed clockwise (closing to the right) andopened anti-clockwise.The sense of rotation and the number of torques for actuation may be readfrom the identification disk in the surface box (see 10.4).The FRIALOC PE shut-off valves are not designed for continuous controllingof the flow.The final “open” and “closed” position of the FRIALOC PE shut-off valve isclearly signalled to the user by metallic stops.The desired coverage height can be freely adjusted telescopically with theFRIALEN ® actuation rods FBS and overstressing of the valve drive is thusprevented. FRIALOC and FBS are ideally matched.When installing in systems, the FRIALOC PE shut-off valve is operated viathe hand wheel FHR. The hand wheel is directly installed on the spindlesquare.10.7 MaintenanceFRIALOC PE shut-off valves are maintenance-free. The inspection intervalsaccording to DVGW-leaflet W392 are to be observed.25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!