16.07.2015 Views

38254-04-ind-iee-01 Haveri.pdf - kuidfc

38254-04-ind-iee-01 Haveri.pdf - kuidfc

38254-04-ind-iee-01 Haveri.pdf - kuidfc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in <strong>Haveri</strong> CMCInitial Environmental Examinationcontamination; (vi) reduced health risk of agricultural laborers due to usage ofraw sewage for irrigation; (vii) reduced risk of contamination of agriculturalfields; and (viii) availability of treated effluent for agricultural purposes.Investment Program beneficiaries will be households getting new connectionsthrough proposed sewer lines under this Investment Program. Householdswho are getting new connections will gain from improved environmentalsanitation conditions through properly functioning sewerage system. Theproposed system will benefit for 82% of total households in the ultimate year,2<strong>04</strong>1. The growing peripheral area of city will be served with sewage networkin the subsequent years and the complete system will be operational withcapacity of 2<strong>04</strong>1 demand for the city.2. Water Supply System Improvements50. Benefits arising from improved water supply comprise (i) reduced risk ofwater-borne diseases due to access to potable and adequate water supply; (ii)reduced ground water exploitation; and (iii) reduced time and costs inaccessing alternative sources of water.Investment Program beneficiaries willcomprise households with existing connections and households with newconnections who previously obtained municipal water from standposts. Benefitof the project is presented in Table 9.Table 9. Investment Program Benefits – Water Supply System ImprovementsPre investment scenarioTotal Network Length in km 63Number of House Connections 6649Population covered 39894Population covered per m 0.6318% coverage (base 2<strong>01</strong>1 population ) 59Post investment ScenarioTotal network length after investment in km 75Population covered per m 0.75Additional connection expected in existing network due to 1244improved reliabilityExtension of distribution proposed in km 11.5Additional number of house connection 1200Total new connections 2444Total house connection after investment 9090Total population covered 54540% coverage (base 2<strong>01</strong>1 population) 803. Urban Drainage System ImprovementsKUIDFC23WSAPL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!