16.07.2015 Views

38254-04-ind-iee-01 Haveri.pdf - kuidfc

38254-04-ind-iee-01 Haveri.pdf - kuidfc

38254-04-ind-iee-01 Haveri.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in <strong>Haveri</strong> CMCInitial Environmental Examinationrequire consent from ASI.75. STP Site: The location of the sewage treatment plant is selected based on thetopography to provide for gravity flow till the disposal point. The townpredominantly slopes towards south and south eastern side and therefore theSTP site selected in the southeastern side of the town. Two alternative siteswere selected for STP on topographical considerations. Site 1, located near theYattinahalli village at about 4 km from the town was rejected considering that(i) the site is not easily accessible; (ii) the trunk sewer has to cross two streamsto reach the plant; and (iii) requires land acquisition for approach road and forlaying of trunk sewer. The Site 2, which is finally selected for STP, hasaccessibility and ideally located at about 2 km from the town and away fromhabitation areas. The STP location is shown in Map 7.NMap 7. Proposed STP Site and Surroundingi) The peak flow for ulimate year is estimated to be 9.43 MLD. It has beenestimated that the land requirement per MLD of the sewage to be treatedwith Facultative Aerated Lagoon is 0.84 acre. So the total landrequirement for the STP Site for the peak flow of 9.43 MLD for theultimate year, shall be 9.43 x 0.84 acre.ii) Approximately 19 acres of land is available with the Ministry of Health,which has been handed over to the ULB for the purpose of establishingSTP in this location.KUIDFC33WSAPL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!