16.07.2015 Views

38254-04-ind-iee-01 Haveri.pdf - kuidfc

38254-04-ind-iee-01 Haveri.pdf - kuidfc

38254-04-ind-iee-01 Haveri.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in <strong>Haveri</strong> CMCInitial Environmental Examinationbeen selected sufficiently away from the habitation and along with provisionfor development of a buffer zone along the site boundary which is not expectedto have any impact on existing environment or surroundings. In the proposedwater supply scheme laying of new raw water pipe line has been suggestedfrom River Varada to Heggere Kere. The proposed pipeline is not passingthrough any environmentally sensitive areas.Table 15. Screening of ImpactsDuration of ImpactMagnitude (Degree of Impact)Negligible(N) Moderate(M) Severe(S)Temporary(T) N/T M/T S/TPermanent (P) N/P M/P S/P85. The following tables provide the potential environmental impacts andmitigation measures of all components proposed under NKUSIP in <strong>Haveri</strong>.Table 16. Environmental Impacts and Mitigation Measures of Sewerage SystemImpact Description Significanceof the ImpactMitigation Measures ImplementationResponsibilityPreliminaryCostingLocation impactsContamination ofgroundwaterresources due toleaching of wastestabilization ponds.Loss of amenity andodor nuisance toneighbors.N/PThis may notbe significantas thegroundwatertable is deep ataround 40 to50 ftM/PNewlydevelopingresidentialareas arelocated at 1000m. Futureexpansion oftown may beconsideredN/a. N/a N/aDevelopment ofphysical separationand visual screenaround the facilitywill address thisimpact. A bufferzone in the form oflandscaping andearthwork shall becreated around theSTP.CMC <strong>Haveri</strong>Part of DesigncostsDesign ImpactsDischarge ofpartially treatedsewage will havepotential to pollutethe agriculturalfields.N/PThe treatedsewage may beused forirrigation.However, thismay not besignificant astreatment willbe designed toThe sewage retentionperiod shall be fixedconsidering seasonalclimatic variations.The effluent from theSTP shall beconfirmed to thefollowing standardsof discharge forinland surface waterdisposal:CMC <strong>Haveri</strong>Part of DesigncostsKUIDFC37WSAPL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!