Document No. <strong>ORAU</strong>T-TKBS-0041 Revision No. 01 Effective Date: 06/02/2009 Page 26 of 89<br />

Building or area location Operations Radionuclides<br />

Building B–Metals Plant First floor: small-scale<br />

metals production, fuel<br />

pellet production,<br />

materials testing<br />

Second floor: Pu-238<br />

pacemakers<br />

Building B–Machine Shop Occasional machining of<br />

clad or unclad uranium,<br />

and clad plutonium and<br />

U-233; fabrication and<br />

repair of new and<br />

contaminated equipment<br />

from Parks Township and<br />

Building C, Type II Facility<br />

or T-2 Plant<br />

Apollo; machining of DU<br />

HEU processing to <strong>for</strong>m<br />

sintered product<br />

First floor: DU, UO2, U3O8,<br />

UF4, fully clad U-233, U-235,<br />

and Pu-239<br />

Second floor: Pu-238powered<br />

heart pacemakers<br />

Fully clad U-233 and Pu-239<br />

and clad or unclad U-235<br />

(any enrichment), primarily<br />

DU contamination and could<br />

include HEU, Pu, Th, and<br />

mixed FPs<br />

HEU (1973–1978), soluble<br />

chloride/oxide complexes,<br />

SNM oxides (UO3, UO2 and<br />

U3O8)<br />

Period of<br />

operation<br />

1963–1974<br />

1963–1964<br />

1964–1980<br />

1969–1980<br />

Outdoor Scrap Storage<br />

Area<br />

Storage UF6 cylinders 1971–1980<br />

a. Sources: Author unknown (2004), Author unknown (undated a), and NUMEC (1963)<br />

Figure 2-5. Parks Township site layout. Plutonium Plant (Building A), Metals Complex<br />

(Building B), and T-2 Facility (Building C) (Austin 1979).<br />

Building B<br />

This complex was a uranium processing facility with the primary radioactive material being DU,<br />

although smaller quantities of NU, thorium, and plutonium were also processed in the building. The<br />

main facilities in Building B were the Hafnium Facility, the Metals Facility, and the Machine Shop.