300 LOOSE CUSHION ARCHmini-<strong>span</strong> bridgesINSTALLATION (CONTINUED)5. Backfilling & CompactingIVE LOAD AS PROVIDED BY ENGINEEROTINGAreas close to the sides of the structure shall be compacted using vibrating ortamping equipment running parallel with the length of structure at all times.Granular fill material shall be at optimum moisture content during compaction.Each fill layer shall be compacted to at least 95% standard proctor density.PLACE AND COMPACT GRANULAR BACKFILLIN 200MM LIFTS TO 95% STANDARD PROCTORDENSITY (MIN)When the backfill reaches 3/4 of the rise, spreading and compaction over thetop STREAM arc must BED be made in a direction perpendicular to the length of the300 LOOSE CUSHION ARCHstructure (parallel to corrugations) until the finished height of the criticalSTIFFENING RIBbackfill zone is reached.300 MINRIP RAPA minimum of 300mm of backfill must exist at all times between the spreadingequipment and the structure. This layer of backfill must be built up evenly fromboth sides. The equipment used shall not be heavier than a D-4 Caterpillardozer (7,250kg) for spreading material and not heavier than a Buffalo-BomagBW-755 for compaction.If the backfill is not to be placed immediately EQUIPMENT BUT to the NOT finished elevation, aLESS THAN 600 (TYP)wearing and traveling surface is to be built over the critical backfill zone inorder to maintain a minimum allowable cover.INSIDE SPAN2 X INSIDE SPANTypical Backfill EnvelopeSTREAM BED300 MINRIP RAPSTIFFENING RIBTO SUIT COMPACTION½ SPAN MINLIVE LOAD AS PROVIDED BY ENGINEERBACKFILLING PERPENDICULARTO LENGTH OF STRUCTURE¾ RISE BACKFILLINGPARALLEL TO LENGTHOF STRUCTUREBACKFILLING PERPENDICULARTO LENGTH OF STRUCTUREARMTEC 200NON-WOVENGEOTEXTILE¾ RISE BACKFILLINGPARALLEL TO LENGTHOF STRUCTURE_NOTEAll dimensions are in millimetresunless otherwise notedBackfill and compaction parallelto arch up to 3/4 rise above topof footingBackfill and compaction perpendicularto arch from 3/4 rise above top offooting to finished gradePLACE AND COMPACT GRANULAR BACKFILLIN 200MM LIFTS TO 95% STANDARD PROCTORDENSITY (MIN)TINGINSIDE RISE COVERINSIDE SPAN2 X INSIDE SPAN300TO SUIT COMPACTIONEQUIPMENT BUT NOTLESS THAN 600 (TYP)½ SPAN MINSTREAM BED300 MINRIP RAPARMTEC 200NON-WOVENGEOTEXTILE300 LOOSE CUSHION ARCHSTIFFENING RIBBACKFILLING PERPENDICULARTO LENGTH OF STRUCTURE¾ RISE BACKFILLINGPARALLEL TO LENGTHOF STRUCTUREANCHOR BOLTS(12.5mmø x 100mm LONG)AT 1m O/CCONCRETE FOOTING(BY OTHERS)TO SUIT COMPACTIONEQUIPMENT BUT NOTLESS THAN 600 (TYP)ARMTEC 200NON-WOVENGEOTEXTILE½ SPAN MININSIDE SPAN½ SPAN MIN2 X INSIDE SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!