09.08.2015 Views

Embley

References (PDF 232 KB) - Rio Tinto Alcan

References (PDF 232 KB) - Rio Tinto Alcan

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rio Tinto AlcanEnvironmental Impact StatementSouth of <strong>Embley</strong> ProjectSalini, J.P., Blaber, S.J.M. and Brewer, D.T. (1992). Diets of sharks from estuaries and adjacent watersof north-eastern Gulf of Carpentaria, Australia. In Sharks: Biology and Fisheries, 43, eds J.G.Pepperell, Australian Journal of Marine and Freshwater Research, 87-96pp.Sattler, P. and Williams, R. (1999). The Conservation Status of Queensland's Bioregional Ecosystems.Queensland EPA, Brisbane.Schulz, M. and B. Thomson (2007). Recovery plan for the Bare-rumped Sheathtail Bat Saccolaimussaccolaimus nudicluniatus 2007-2011. Report to Department of the Environment and Heritage,Canberra. Queensland Parks and Wildlife Service, Brisbane.Sea Turtle Conservancy (2010a). Species Fact Sheet: Flatback Sea Turtle. Available online at: SeaTurtle Conservancy http://www.conserveturtles.org/seaturtleinformation.php?page=flatback.Accessed: 06/12/2010.Sea Turtle Conservancy (2010b). Species Fact Sheet: Green Sea Turtle. Available online at: Sea TurtleConservancy http://www.conserveturtles.org/seaturtleinformation.php?page=green. Accessed:06/12/2010.SGS (2008). Weipa Community Baseline Survey. Report for RTA Weipa by SGS Economics andPlanning, April 2008.Shiner, J., and Morrison M.J. (2009). The contribution of heritage surveys towards understanding thecultural landscape of the Weipa bauxite plateau. Australian Archaeology 68:52-55.Shultz T.J., Townsend S.A. and Edwards C.A. (2002). Water Quality of the Rivers and Streams of theMary River Catchment (N.T.). Technical Report 41/2002. Northern Territory Department ofInfrastructure, Planning and Environment.Simpson, K. and Day, N. (2004). Field Guide to the Birds of Australia. Penguin Group Australia,Camberwell.SKM (2004). Lorim Point Wharf, Second Shiploader Project: Sediment Sampling and Analysis PlanImplementation. Prepared by Sinclair Knight Merz for Comalco Aluminium Limited, December 2004.SKM (2005a). Port of Weipa Maintenance Dredging (2005): Sediment Sampling and Analysis PlanImplementation. Report prepared by Sinclair Knight Merz for Ports Corporation Queensland. 20 June2005.SKM (2005b). Lorim Point Wharf Second Shiploader Project: Sediment Sampling and Analysis PlanImplementation Small Channel Widening Area. Report prepared by Sinclair Knight Merz for Comalco.1 June 2005SKM (2009a). Port of Weipa Long Term Environment Management Plan for Dredging and DumpingActivities. Report prepared by Sinclair Knight Merz for North Queensland Bulk Ports. 31 August 2009.SKM (2009b). Port of Weipa Long Term Management Plan: Sediment Quality Assessment. Reportprepared by Sinclair Knight Merz for North Queensland Bulk Ports. 20 July 2009.SKM (2010). Cape Lambert Port B Development Cetacean Management Plan, Version 4. Prepared bySinclair, Knight Merz for Pilbara Iron Pty Ltd, 3 November 2010.Smart, J. (1976). The nature and origin of beach ridges, western Cape York Peninsula, Queensland.Bureau of Mineral Resources Journal of Australian Geology and Geophysics 1(3): 211-218.Smith, T.K. (1985). Analysis of major and minor constituents of Andoom and Weipa bauxite fractions.BTD Report 3/85. Internal report to Comalco.References Page R-21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!