09.08.2015 Views

Embley

References (PDF 232 KB) - Rio Tinto Alcan

References (PDF 232 KB) - Rio Tinto Alcan

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Rio Tinto AlcanEnvironmental Impact StatementSouth of <strong>Embley</strong> ProjectCotterell E (1998): Fish Passage in Streams. Fisheries Guidelines for Design of Stream Crossings.Fisheries Group, Queensland Department of Primary Industries, Brisbane, 37p.Cox and Barron (1998). Great Artesian Basin Resource Study, November 1998. Great Artesian BasinConsultative Council.CRC for Catchment Hydrology (undated). Rainfall Runoff Library, v1.0.5. www.toolkit.net.au/rrlCrowley, G. (1995). Fire on Cape York Peninsula. CYPLUS. Queensland Government, Department ofPrimary Industries, Brisbane.CSIRO (2007). Climate Change in Australia Technical Report 2007. Australian CommonwealthScientific and Industrial Research Organisation and Australian Government Bureau of Meteorology.CSIRO (2009). Water in the Western Cape region, pp 417-479 in CSIRO (2009). Water in the Gulf ofCarpentaria Drainage Division. A report to the Australian Government from the CSIRO NorthernAustralia Sustainable Yields Project. CSIRO Water for a Healthy Country Flagship, Australia.CYPDA (2009). The Cape York Fire Management Project. Cape York Peninsula DevelopmentAssociation Inc. Available online at: http://www.cypda.com.au/node/40CYWAFAP (2009). Cape York Weeds and Feral Animals Project Website,http://www.cywafap.org.au/NPA_Project.htmlCzechura, G. and Hobson, R. (2000). The Red Goshawk Erythrotriorchis radiatus in northernQueensland: status and distribution. Report to Queensland Parks and Wildlife Service.DAFF (2008). Australian Ballast Water Management Requirements. Department of Agriculture,Fisheries and Forestry. Australian Government.Dailey, C. (2010). Archaeological Assessment of Proposed Mine Infrastructure Areas within ML 7024,South of the <strong>Embley</strong> River, Western Cape York. Report 3 of the SoE EIS background heritage studiesincorporating Dam C Extension and Water Pipeline. Internal unpublished report prepared for Rio TintoAlcan.Dames and Moore. (1996). Draft Environmental Impact Assessment Studyto Alcan South Pacific.Ely Mining Lease, ReportDavid, B. and Lourandos, H. (1977). 37,000 Years and more in tropical Australia: Investigating longtermArchaeological trends in Cape York Peninsula. Proceedings of the Prehistoric Society (63) pp1-23.DCC (2010a). National Greenhouse Accounts (NGA) Factors. Department of Climate Change andEnergy Efficiency. Australian Government.DCC (2010b). National Greenhouse Gas Inventory. Department of Climate Change and EnergyEfficiency. Australian Government.De'ath, G. and Fabricius ,K.E. (2008). Water quality of the Great Barrier Reef: distributions, effects onreef biota and trigger values for the protection of ecosystem health. Final Report to the Great BarrierReef Marine Park Authority. Australian Institute of Marine Science, Townsville.Debus, S.J.S. and Czechura, G.V. (1988). The red goshawk Erythrotriorchis radiatus: a review, Aust.Bird Watcher 12:175-99.DEEDI (2009). Dwarf Sawfish. Photo Guide to Sharks. Queensland Department of Employment,Economic Development and Innovation. Available online at: http://www.dpi.q1d.gov.au/28_12495.htm(accessed 25/8/2010).References Page R-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!