09.08.2015 Views

Embley

References (PDF 232 KB) - Rio Tinto Alcan

References (PDF 232 KB) - Rio Tinto Alcan

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Rio Tinto AlcanEnvironmental Impact StatementSouth of <strong>Embley</strong> ProjectWitherington, B.E. and Martin, R.E. (1996). Understanding, Assessing, and Resolving Light-PollutionProblems on Sea Turtle Nesting Beaches. Florida Department of Environmental Protection FMRITechnical Report TR-2.Woinarski, J. (2004). National Multi-species Recovery plan for the Partridge Pigeon (easternsubspecies) Geophaps smithll smithii, Crested Shrike-tit (northern (sub)species) Fa /cuncu /us(frontatus) whitei, Masked Owl (north Australian mainland subspecies) Tyto novaehollancllae kimberli;and Masked Owl (Tiwi Islands subspecies) Tyto novaeho / /andiae me /vi / /ensis, 2004 2008. A RecoveryPlan prepared under the Commonwealth EPBC Act, 1999.Woinarski, J., Mackey, B., Nix, H. and Trail!, B. (2007). The Nature of Northern Australiavalues, ecological processes and future prospects. ANU E Press.NaturalWoolfe, R. (2007). An Archaeological Survey of Norman Creek and Boyd Bay Drill Lines South <strong>Embley</strong>Drilling Programme 2006. Internal report prepared for Rio Tinto Aluminium.Woolfe, R. (2009a). Archaeological Survey of Part of Rio Tinto Alcan South of the <strong>Embley</strong> MineralLease ML 7024, Boyd Bay, Western Cape York. Internal report prepared for Chalco and GHD.Woolfe, R. (2009b). Archaeological Survey of Part of Rio Tinto Alcan South of the <strong>Embley</strong> MineralLease ML 7024, Boyd Bay, Western Cape York, Conveyor Belt Route, August 2009. Internal reportprepared for Chalco and GHD.Woolfe, R., and Guse, D. (2006). An Archaeological Survey of Norman Creek and Boyd Bay Drill LinesSouth <strong>Embley</strong> Drilling Programme 2006. Internal unpublished report prepared for Rio TintoAluminium.Worley Parsons (2007). South of the <strong>Embley</strong> River Project: Sediment Sampling and Analysis Plan(Draft). Report prepared for Rio Tinto Aluminium and Matrix+ Consulting. 19 September 2007.Worley Parsons (2008). Fishway Effectiveness for High Dams, Consultant Report prepared forQueensland Water Infrastructure June 2008.Worley Parsons (2009). South of the <strong>Embley</strong> Ferry/Barge Terminals Capital Dredging: SedimentSampling and Analysis Plan. Report prepared for Rio Tinto Alcan. 27 January 2009.WTA (2008). Rio Tinto Aluminium and the Weipa Town AuthorityVersion 2.0, 24 January 2008. Weipa Town Authority.Management Protocol for Weipa.Zaar, U., Prowse, G. and Matthews, I. (1999). Water Resources of East Arnhem Land Technical Data.Report Number 03/1999D Department of Lands, Planning and Environment Natural ResourcesDivision, Northern Territory Government.References Page R-25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!