Water from Small Dams
Water from Small Dams - SamSamWater
Water from Small Dams - SamSamWater
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
For manual excavation, divide the area to be excavated into “plots”, each plot beingexactly 1 cubic metre as shown above. Each plot is numbered and given to an “owner”.Plots are being marked out with wooden pegs.Excavation work is halfway completedAn ox-scoop with two men and oxen can excavate and move more soil than 12 men.27