20.08.2015 Views

Table of Contents

Long Term Council Community Plan 2006-2016 - Waikato District ...

Long Term Council Community Plan 2006-2016 - Waikato District ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SUMMARY OF SPECIFIC CONSULTATION ISSUES ADDRESSED IN THE LTCCPSpecific Consultation Issues addressed in the LTCCPThis section outlines the key issuescontained within the LTCCP, onwhich Council sought feedbackfrom the community.District-wide communityfacility rateCouncil proposed to increasethe Uniform Annual GeneralCharge by $10 for capital projectsto be undertaken on districtwide community facilities. Thiswill enable work to proceedon projects for public toilets,community properties, parks andreserves, swimming pools, librariesand community halls. Council willconsider a range <strong>of</strong> projects forfunding on an annual basis throughthe budgeting process.Decision: Council agreed toproceed with the rate.Increase in levels <strong>of</strong>service for kerbsiderecyclingCouncil proposed that the weeklycollection <strong>of</strong> steel cans andplastic bottles be progressivelyintroduced within the existingrecycling collection area overa two-year period. This is inaddition to existing materialcollected. Plastic recyclingcrates would be provided toall residential properties withinthe collection area. Kerbsiderecycling is funded from the refusecollection targeted rate. Therecycling <strong>of</strong> steel cans and plasticbottles will add approximately$20 to the targeted rate in allareas except Raglan where thisservice is already being provided.Minor extensions to the recyclingcollection area will be consideredwhere suffi cient demand exists andthe service can be economicallyprovided.Decision: Council agreed toproceed with the increase inkerbside recycling.4 THE ROAD AHEAD - LONG-TERM COUNCIL COMMUNITY PLAN 2006-2016DevelopmentContributions PolicyCouncil has decided to applydevelopment contributions forTamahere and Lorenzen Bay areasunder the Local Government Act2002. These contributions willbe levied on developers to assistin funding the bulk construction<strong>of</strong> the infrastructure as detailedin the Structure Plan. Councilconsulted on these developmentcontributions as part <strong>of</strong> theLTCCP process. This is in additionto the fi nancial contributions,which Council levies throughthe District Plan. Please referto Volume Two – Key Policiesfor more detail on financialcontributions.Decision: Council resolved toproceed with the DevelopmentContributions Policy subjectto some minor workingchanges that resulted from thesubmission process.Huntly Pools - newtargeted rateCouncil proposed to separate theHuntly Pool Targeted Rate fromthe Huntly Community FacilitiesTargeted Rate and to charge thesetargeted rates to different ratingareas. The Huntly CommunityFacilities rate was increased by$15 for 5 years (ending 2007/08)to assist with the initial increase incosts for the pool heating project.The proposed $30 in 2008/09was to cover additional costs thatwould be incurred should theproposed project for coveringthe pool proceed. The $30 chargeassumed that the pool would beopen for the full 12 months <strong>of</strong> theyear.Decision: Council resolvedto introduce a Huntly PoolTargeted Rate <strong>of</strong> $15 for a newrating area on the outskirts<strong>of</strong> Huntly. The landownersaffected were consulted on theproposed rate.Council resolved to retain theexisting Huntly CommunityFacilities rate <strong>of</strong> $40 for Huntlyratepayers and not to charge aseparate targeted rate for theHuntly Swimming Pool.Council had also considered anincreased charge in 2008/09. Atthis stage, it is not proposed toincrease the rate at that time.Te Kauwhata - newtargeted rateA new targeted rate was proposedfor Te Kauwhata in the 2006/07rating year. These funds were tobe utilised for community facilitiesin the area. For the 2006/07rating year, it was proposed toutilise these funds towards the TeKauwhata Health Awareness grant.Decision:Following community feedbackand some misunderstandingabout the proposed targetedrate, Council resolved not toproceed with a separate TeKauwhata Community FacilityTargeted Rate.Council will reconsider thematter and consult with thecommunity next year about themerits <strong>of</strong> such a proposal.Taupiri WastewaterSchemeCouncil plans to install areticulated wastewater collectionand disposal system at Taupiriduring 2006/07. The estimatedcost <strong>of</strong> this project is $4,200,000.The Ministry <strong>of</strong> Health hasapproved a subsidy <strong>of</strong> 79.5% <strong>of</strong> thetotal cost <strong>of</strong> the project. Councilhas already consulted widely withaffected property owners and adetailed design has been agreed.If the Ministry <strong>of</strong> Health subsidyis confi rmed, Council will consultwith affected property ownersregarding the targeted rate fundingoptions at that time.Decision: Since the draft LTCCPwas prepared, the Ministry<strong>of</strong> Health has confirmed the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!