24.08.2015 Views

CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN

Construction Environmental Management Plan pt1 - Newcastle Coal ...

Construction Environmental Management Plan pt1 - Newcastle Coal ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Construction Environmental Management Plan(f)Table 1 (Continued)Condition 7.2, Schedule 2 of Project Approval (06_0009)Project Approval (06_0009) Conditiona traffic control plan to detail the various traffic control measures to be used forconstruction traffic access connection to the classified road network; andSection Addressed in thisDocumentSection 4.2.12 andAppendix D(g) complaints handling procedures during construction. Section 4.4This CEMP has been prepared generally in accordance with the Guideline for the Preparation of EnvironmentalManagement Plans (Department of Infrastructure, Planning and Natural Resources [DIPNR], 2004).This CEMP has been prepared to assist NCIG in the implementation of appropriate environmental managementmeasures during the construction of Stage 2F of the Project. Where there is any conflict between the provisionsof this CEMP and any Contractors’ obligations under their respective Contracts, including the various statutoryrequirements (i.e. licences, permits, Project Approval conditions and relevant laws), the Contract and statutoryrequirements are to take precedence. In the case of any real or perceived ambiguity between elements of thisCEMP and the above statutory requirements the Contractor shall first gain clarification from NCIG prior toimplementing that element of this CEMP over which the ambiguity is identified.The remainder of this CEMP is structured as follows:Section 2Section 3Section 4Section 5Section 6Provides a project summary, detailing 2F Construction components, consultation undergoneduring the preparation of this CEMP and its objective.Details roles, responsibilities and training requirements for all personnel involved in theproject, approval and licensing requirements, as well as emergency contacts andresponsive actions.Details the management plans and mitigation measures regarding potential environmentalimpacts during the project life.The reporting and review procedures undertaken in the event of potential significantenvironmental impacts.List cited references in this CEMP.Supporting attachments and appendices to the CEMP are as follows:Attachment 1 Project Approval (06_0009) and Modification of Minister’s Approval (MP06_0009 MOD 2)Attachment 2 EPBC Act Particular Manner Decision 2006/2987Appendix AAppendix BAppendix CAppendix DAppendix EDrawingsConstruction Noise Management PlanAcid Sulfate Soil Management PlanConstruction Surface Water Management PlanConstruction Traffic Management ProtocolConstruction Aboriginal Heritage Management PlanHW03-03-C-21212 and HW03-04-C22102:22103HW0303-01-R-82001:82044 Stage 2F Flyover001-003 Rail Flyover Modification – Layout Plans004 Spares Storage FacilityHW03-05-C-22803 Spares Storage Facility – Sewage and Stormwater Drainage LayoutHW03-05-C-22805:22808 Spares Storage Facility5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!