04.09.2015 Views

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RESUME<br />

MICHAEL BEATTIE, P.E. – CONTINUED<br />

Governors Island EIS, Manhattan and Brooklyn, NY<br />

AKRF is preparing an Environmental Impact Statement (EIS) to assess possible impacts from the proposed improvements<br />

to Governors Island. Mr. Beattie performed traffic volume network setup and balancing for existing, future no build, and<br />

future build traffic conditions, prepare traffic volume figures for the EIS, develop trip generation estimates for the proposed<br />

project, and perform capacity analysis utilizing HCS2000 software to determine significant adverse traffic impacts.<br />

French American School of New York, White Plains, NY<br />

AKRF is preparing an Environmental Impact Statement (EIS) to assess possible impacts from the proposed French American<br />

School of New York campus in White Plains, NY. Mr. Beattie is leading the technical analysis which involves preparing a<br />

detailed traffic volume network for existing and future conditions with and without the project, developing trip generation<br />

estimates for the proposed project, and performing capacity analysis. Mr. Beattie is utilizing Synchro and SimTraffic software<br />

to determine significant adverse traffic impacts. In addition, he is also analyzing the site access and on-site circulation using<br />

the VISSIM simulation software to determine the most viable option for school drop-off and pick-up locations.<br />

Victoria Theater EIS, Manhattan, NY<br />

AKRF is preparing an Environmental Impact Statement (EIS) to assess possible impacts from the proposed project in<br />

Manhattan. Mr. Beattie is overseeing the traffic volume network setup and balancing for existing, future no build, and<br />

future build traffic conditions, develop trip generation estimates for the proposed project, and oversee the capacity analysis<br />

utilizing HCS2000 software to determine significant adverse traffic impacts.<br />

Stone Court Strategy Planning and Traffic Support, Staten Island, NY<br />

AKRF is providing strategy planning and traffic support services for the proposed redevelopment of the Flagg estate,<br />

Stone Court, into approximately 60 senior citizen apartment units. Mr. Beattie will develop trip generation estimates of<br />

the proposed project and will develop existing plus project-generated traffic volumes to address general traffic congestion<br />

issues in the study area. He will also compile and summarize data on emergency services that serve the project area to<br />

address the community’s concern about emergency vehicle access.<br />

Geary Boulevard Bus Rapid Transit, San Francisco, CA<br />

Fehr & Peers developed a VISSIM micro-simulation model to simulate the proposed bus rapid transit (BRT) implementation<br />

along Geary Boulevard. The BRT project would encompass a four and half mile stretch of Geary Boulevard, extending<br />

from Union Square in downtown San Francisco to 30th Avenue in the Outer Richmond. Mr. Beattie led the detailed<br />

traffic operations analysis of the intersection and corridor operations using the VISSIM software. The VISSIM software<br />

was used to determine operational impacts for side-side, center-side, and center-center running buses and ideal locations<br />

of transitions between mixed flow-lanes and bus-only lanes.<br />

Downtown Livermore Parking Study, Livermore, CA<br />

Fehr & Peers analyzed existing and future parking supply and demand in the downtown Livermore area. Future parking<br />

demand was developed through the use of shared parking studies and GIS models calibrated to reflect parking characteristics<br />

of the downtown Livermore area. Mr. Beattie was responsible for project scope, schedule, budget and documentation and<br />

for the city-wide parking data collection effort and detailed operations analysis of key intersections throughout the City.<br />

24<br />

Proposal For Capitalize Albany Corporation<br />

RFQ for <strong>Building</strong> a <strong>Tactical</strong> <strong>Revitalization</strong> Plan for Downtown Albany, NY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!