15.09.2015 Views

2009 Library Board Members 2009 Library Staff Members

2009 Library Staff Members - Haldimand County

2009 Library Staff Members - Haldimand County

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ongoing Activities<br />

The <strong>Library</strong> continued to support efforts made by other County divisions in the delivery of services to<br />

residents. In June, libraries served as distribution centres for the County’s Community Survey Regarding<br />

Environmental Noise;<br />

The Jarvis branch hosted a Passport Clinic sponsored by Diane Finley’s office in June, providing valuable<br />

passport application and renewal information to area residents;<br />

To ensure attractive, safe and convenient facilities, the County’s Fleet and Facilities Division began<br />

systematic preventative maintenance inspections of branches. Fire safety lock boxes were installed at each<br />

library branch in <strong>2009</strong>, for use by the County’s Emergency Services Division in emergencies. As well,<br />

numerous repairs and improvements were made to library buildings this year:<br />

Dunnville: stair tread repairs, fluorescent bulb replacements, exterior floodlight<br />

breaker replacement, heater motor replacement, repair of third floor stairwell cables,<br />

Harvard monument repairs by Fitzpatrck Monuments,<br />

Cayuga: emergency light battery replacement, new furnace maintenance contract,<br />

repair of entrance bench, rooftop air conditioning unit replacement, emergency exit<br />

brickwork repairs,<br />

Hagersville: entrance sign repairs, hot water heater fuse replacement,<br />

Caledonia: air conditioning unit repairs, ceiling inspections and repairs, HVAC blower<br />

motor replacement in meeting room, roof vapour barrier repairs, facility-wide carpet<br />

cleaning, alarm system reconfigurations,<br />

Jarvis: roof repairs, ceiling tile replacements, spring grounds clean-up, air conditioner<br />

drain maintenance, furnace repairs, roof heat tracer installation, public washroom door<br />

repair,<br />

Selkirk: Hall <strong>Board</strong> installation of firewall in the entry, circulation hall, office and<br />

washroom ceilings with lighting and ceiling tile upgrades; office repainting.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!