- Page 1: Technologies to Reduce or Capture a
- Page 10: Table of Contents Executive Summary
- Page 13 and 14: executive summary By letter dated J
- Page 15 and 16: executive summary 03 Figure ES-1 Ev
- Page 17 and 18: executive summary 05 increase effic
- Page 19 and 20: executive summary 07 projects invol
- Page 21 and 22: executive summary 09 » The coal an
- Page 23 and 24: executive summary 11 » Government
- Page 25 and 26: executive summary 13 o The CO 2 cap
- Page 27 and 28: NCC RECOMMENDATIONS The National Co
- Page 29 and 30: acknowledgements The National Coal
- Page 32 and 33: “Energy and persistence conquer a
- Page 34 and 35: defining economic backdrop of the f
- Page 36 and 37: Coal as the Continuing Foundation o
- Page 38 and 39: A new wave of coal-based power plan
- Page 40 and 41: China by 266 percent? Given the gas
- Page 42 and 43: Another important lesson and somewh
- Page 44 and 45: Increase in Energy-Related CO 2 Emi
- Page 46 and 47: “It matters little what the Europ
- Page 48 and 49: • In the past year, emission redu
- Page 50 and 51: SECTION TWO Technologies to Reduce
- Page 52 and 53:
Building High Efficiency New Capaci
- Page 54 and 55:
Studies to investigate differences
- Page 56 and 57:
psi, 1346 °F/1400°F (379 bar, 730
- Page 58 and 59:
Steam turbine materials are being e
- Page 60 and 61:
Integrated Gasification Combined Cy
- Page 62 and 63:
IGCC RAM Data - Excludes Impact of
- Page 64 and 65:
IGCC LONG-TERM IMPROVEMENT ROADMAP
- Page 66 and 67:
associated with equipment performan
- Page 68 and 69:
CONCLUSIONS • New high-efficiency
- Page 70 and 71:
SECTION THREE Technologies for Capt
- Page 72 and 73:
Of the five major types of processe
- Page 74 and 75:
eboiler inlet and passed to the ric
- Page 76 and 77:
New organic salt "promoters" have b
- Page 78 and 79:
Enhanced Adsorption Solvent for CO
- Page 80 and 81:
to scrub before or after the point
- Page 82 and 83:
corresponds to 0.27 metric tonnes o
- Page 84 and 85:
CO 2 . This varies somewhat between
- Page 86 and 87:
• FutureGen is a vital program an
- Page 88 and 89:
Power & Steam Coal Iron Reduction N
- Page 90 and 91:
H 2 S, NH 3 , CO x Make-up Hydrogen
- Page 92 and 93:
Plant Type DCL ICL Recycle ICL Once
- Page 94 and 95:
DCL ICL Hybrid Spec/Typical Diesel
- Page 96 and 97:
Coal Council envisions 2.6 million
- Page 98 and 99:
Co-processing coal and biomass coul
- Page 100 and 101:
References 35 36 37 38 39 40 41 42
- Page 102 and 103:
During the next hundred years, dema
- Page 104 and 105:
anging from about 2,000 billion met
- Page 106 and 107:
Potential of Enhanced Oil Recovery
- Page 108 and 109:
Basin/Area Technically Recoverable
- Page 110 and 111:
In a second example, CO 2 could con
- Page 112 and 113:
Other Beneficial Uses of CO 2 Anoth
- Page 114 and 115:
In today’s commercial markets, CO
- Page 116 and 117:
Figure 5-12: Map Comparing Location
- Page 118 and 119:
Management Practices Terrestrial ca
- Page 120 and 121:
have ranged from millimeters to 1 c
- Page 122 and 123:
Examples of risks where immunity ma
- Page 124 and 125:
• Deployment of agricultural mana
- Page 126 and 127:
70 71 72 73 74 75 McCarty, G.W., an
- Page 128 and 129:
− For PC generation, key technolo
- Page 130 and 131:
Anticipated Cost of Full-Scale Appl
- Page 132 and 133:
Figure 6-2: Capital and O&M Cost Tr
- Page 134 and 135:
Owner Plant Name/ Location MW Net T
- Page 136 and 137:
transition to CO 2 capture, conside
- Page 138 and 139:
Point in Oklahoma sell CO 2 as a fo
- Page 140 and 141:
2006 Gasification Technologies Conf
- Page 142 and 143:
Case Description Shell IGCC 100% PR
- Page 144 and 145:
adapting CTs for use with hydrogen-
- Page 146 and 147:
- The data point for MEA CO 2 solve
- Page 148 and 149:
Figure 6-14: Forecast Reduction in
- Page 150 and 151:
combustion turbines for use with hy
- Page 152 and 153:
SECTION SEVEN Groups Engaged in Tec
- Page 154 and 155:
The DOE website contains a database
- Page 156 and 157:
Figure 7-4: DOE Carbon Sequestratio
- Page 158 and 159:
Figure 7-5: FutureGen Project Timel
- Page 160 and 161:
Alstom Power, Riley Power, Babcock
- Page 162 and 163:
The Power Systems Development Facil
- Page 164 and 165:
Carbon Sequestration Leadership For
- Page 166 and 167:
• Best practices for demand side
- Page 168 and 169:
2006 2007 2008 2009 2010 2011 2012
- Page 170 and 171:
SECTION EIGHT Energy Policy Act of
- Page 172 and 173:
• A 15 percent investment tax cre
- Page 174 and 175:
APPENDIX 1 Description of The Natio
- Page 176 and 177:
Sandy Blackstone 8122 North Sundown
- Page 178 and 179:
Edward C. Hurley Emergency Energy A
- Page 180 and 181:
Fredrick D. Palmer Peabody Energy 7
- Page 182 and 183:
John N. Ward Headwaters Incorporate
- Page 184 and 185:
Carl E. Hensman Frontier Geoscience
- Page 186 and 187:
APPENDIX 4 2007 Study Work Group Da
- Page 188 and 189:
Gianna Manes Duke Energy Ph: 704-38
- Page 190 and 191:
APPENDIX 5 Acknowledgements The Nat
- Page 192:
IEA ICDR ICL IECM IEO IGCC IP IPCC