12.10.2015 Views

Andrew Jones

Highways_October_2015

Highways_October_2015

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The bottom line is, our<br />

white lining lasts longer!<br />

Seven years longer. *<br />

Want improved whole life costs and<br />

better asset management? We can help.<br />

Unlike most white lining, Stirling Lloyd’s Safetrack LM Retromax<br />

won’t need refreshing after 6 months or replacing after 12 months.<br />

In fact, lines installed on a busy section of the Leeds Inner Relief<br />

Road in 2008 are still performing strongly seven years on.<br />

Our products are designed to reduce whole life costs, maintenance<br />

cycles and road closures by protecting assets for longer.<br />

CASE STUDY<br />

*Leeds Inner<br />

Relief Road<br />

In 2008, our products were<br />

used on a busy section of the<br />

Leeds Inner Relief Road.<br />

Seven years on, the retro<br />

reflectivity is still 150 MCd – 50%<br />

higher than the specification<br />

required, an exceptional result for<br />

innovation and whole life cost.<br />

Talk to our Highways team and see how we<br />

can help deliver added value and improved<br />

whole life benefits on your next project.<br />

call +44 (0) 1565 633111<br />

email info@stirlinglloyd.com<br />

or visit stirlinglloyd.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!