Andrew Jones
Highways_October_2015
Highways_October_2015
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The bottom line is, our<br />
white lining lasts longer!<br />
Seven years longer. *<br />
Want improved whole life costs and<br />
better asset management? We can help.<br />
Unlike most white lining, Stirling Lloyd’s Safetrack LM Retromax<br />
won’t need refreshing after 6 months or replacing after 12 months.<br />
In fact, lines installed on a busy section of the Leeds Inner Relief<br />
Road in 2008 are still performing strongly seven years on.<br />
Our products are designed to reduce whole life costs, maintenance<br />
cycles and road closures by protecting assets for longer.<br />
CASE STUDY<br />
*Leeds Inner<br />
Relief Road<br />
In 2008, our products were<br />
used on a busy section of the<br />
Leeds Inner Relief Road.<br />
Seven years on, the retro<br />
reflectivity is still 150 MCd – 50%<br />
higher than the specification<br />
required, an exceptional result for<br />
innovation and whole life cost.<br />
Talk to our Highways team and see how we<br />
can help deliver added value and improved<br />
whole life benefits on your next project.<br />
call +44 (0) 1565 633111<br />
email info@stirlinglloyd.com<br />
or visit stirlinglloyd.com