05.12.2015 Views

Table of Contents

ATI QC-110 Base Tool Changer Modular Manual

ATI QC-110 Base Tool Changer Modular Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Quick Change Installation and Operation Manual<br />

Document #9620-20-B-110 Series Base Tool Changer-25<br />

4.2 Cleaning and Lubrication <strong>of</strong> the Locking Mechanism and Alignment Pins<br />

1. Dock the Tool side <strong>of</strong> the Tool Changer safely and uncouple the Tool Changer to allow clear access to<br />

the Master and Tool plates.<br />

2. Turn <strong>of</strong>f and de-energize all energized circuits (e.g. electrical, air, water, etc.).<br />

3. The locking mechanism must be in the unlock state before cleaning.<br />

4. Use a clean rag to thoroughly remove the existing lubricant and debris from the outer surface <strong>of</strong> the ball<br />

bearings, the male coupling, the cam and the alignment pins.<br />

Figure 4.1—Cleaning Ball Bearings and Outer Surfaces <strong>of</strong> Male Coupling<br />

5. Use a clean rag to thoroughly remove the existing lubricant and debris from the inner surface <strong>of</strong> the male<br />

coupling and the cam.<br />

Figure 4.2—Cleaning Ball Bearings, Cam and Inner Surfaces <strong>of</strong> Male Coupling<br />

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: info@ati-ia.com<br />

B-19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!