16.12.2015 Views

ADRP1-02

52543f77c16bcfa46f6e1de2B038ef195

52543f77c16bcfa46f6e1de2B038ef195

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 2<br />

Bolded entries apply only to the Army. An asterisk (*) marks terms shown in chapter 1.<br />

OE<br />

OGA<br />

OHDACA<br />

OIC<br />

OMA<br />

OP<br />

OPCON<br />

OPDS<br />

OPIR<br />

OPLAN<br />

OPNAVINST<br />

OPORD<br />

OPSEC<br />

OPTEMPO<br />

ORSA<br />

OSD<br />

OSHA<br />

OSINT<br />

OSUT<br />

*operational environment<br />

other government agency<br />

Overseas Humanitarian, Disaster, and Civic Aid<br />

officer in charge<br />

Operations and Maintenance, Army<br />

observation post<br />

*operational control<br />

*offshore petroleum discharge system<br />

*overhead persistent infrared<br />

*operation plan<br />

Chief of Naval Operations instruction<br />

*operation order<br />

*operations security<br />

operating tempo<br />

operations research and systems analysis<br />

Office of the Secretary of Defense<br />

Occupational Safety and Health Administration<br />

*open-source intelligence<br />

one station unit training<br />

—P—<br />

PA<br />

PAA<br />

PAO<br />

PB<br />

PBO<br />

PCC<br />

PCI<br />

PCS<br />

PDSS<br />

PE<br />

PFC<br />

PGM<br />

PID<br />

PIR<br />

PKI<br />

PL<br />

PLD<br />

PLT<br />

PM<br />

PMCS<br />

PMESII-PT<br />

*public affairs personnel accountability<br />

*position area for artillery<br />

public affairs officer<br />

*peace building<br />

property book officer<br />

precombat check<br />

precombat inspection<br />

permanent change of station<br />

predeployment site survey<br />

*preparation of the environment<br />

private first class<br />

*precision-guided munition<br />

positive identification<br />

priority intelligence requirement<br />

*public key infrastructure<br />

phase line<br />

*probable line of deployment<br />

platoon<br />

project manager<br />

preventive maintenance checks and services<br />

political, military, economic, social, information, infrastructure,<br />

physical environment, and time [operational variables]<br />

2-18 ADRP 1-<strong>02</strong> 7 December 2015

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!