Helped forward the agenda that bring peace<br />

and development to conflict-affected areas<br />

The Department<br />

also played a key role in<br />

the implementation of<br />

the Payapa at<br />

Masaganang Pamayanan (PAMANA) Program by<br />

providing subsidy to 253 cities and municipalities<br />

(127 out of 253 LGUs are repeating LGU<br />

beneficiaries, therefore a total of 380 cities and<br />

municipalities for the 4-year period from <strong>CY</strong> 2012<br />

to <strong>CY</strong> <strong>2015</strong>) for infrastructure projects such as<br />

roads, water, bridges, public market, etc.<br />

identified through the Conflict-Analysis and<br />

Planning Process (CAPP) to alleviate the plight of<br />

conflict-affected communities and drive-in the<br />

peace-building efforts within the community.<br />

Since we started the project in <strong>CY</strong> 2012, we have<br />

identified and implemented 677 sub-projects<br />

(with 26 projects cancelled) mainly meant to<br />

boost local access and roads development, and<br />

livelihood opportunities, 422 of which were<br />

already completed while the remaining 229 are<br />

in various stages of implementation and/or<br />

complying with administrative requirements.<br />

IMPROVED SOCIO-ECONOMIC CONDITIONS<br />

With the completion of the Php10M 3-km. PAMANA Road Project: Rehabilitation of NRJ San Juan-<br />

New Tubigon Road in Agusan del Sur, dramatic changes in the lives of the residents were experienced.<br />

Mr. Ernesto Bayo, a resident of Barangay San Juan explained, “In the 20 years of residing in our barangay,<br />

only this time I experienced the comfort of a good road.” He recalls the time before the PAMANA Project<br />

when only motorcycles can access the road and the expensive transportation of their agricultural<br />

products. “Government services were also made accessible because of the road project and transportation<br />

during medical emergencies were made easy,” he added. Travel time was also reduced to almost an hour<br />

from Bayugan City to the heart of Barangay San Juan in the Municipality of Sibagat and 4-wheel vehicles<br />

can now access using the PAMANA rehabilitated road.<br />

38<br />

D e p a r t m e n t o f t h e I n t e r i o r a n d L o c a l G o v e r n m e n t<br />

ANNUAL REPORT <strong>2015</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!