13.09.2016 Views

Carlo Llanto Architecture and Graphic Design Portfolio 1st Ed

Review my work in Architectural and Graphic Design. You can find me via the ff: My official website, where you can also find an updated, fully-curated portfolio: www.carlollanto.com or my email: cmllanto.official@gmail.com

Review my work in Architectural and Graphic Design. You can find me via the ff: My official website, where you can also find an updated, fully-curated portfolio: www.carlollanto.com or my email: cmllanto.official@gmail.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

These sample the systems design <strong>and</strong><br />

layout of the mechanical, electrical,<br />

plumbing, sanitary, structural, <strong>and</strong> various<br />

technical systems of the Maker Hub:<br />

Creative Industry Incubator which was<br />

undertaken as a final undergraduate<br />

thesis project. In good practice, the design<br />

thesis was undertaken with the intent to<br />

comprehensively detail the underlying<br />

systems of an technologically-enabled<br />

office high rise in the 2<strong>1st</strong> century.<br />

The structural system of the Maker Hub is<br />

designed to accommodate program<br />

flexibility as well as ensure high-rise<br />

stability in seismic <strong>and</strong> wind events.<br />

Attention to architectural <strong>and</strong> construction<br />

details help flesh out the basic framework<br />

for the exernal facade system <strong>and</strong> the<br />

internal workspace environment. Due<br />

consideration was given to the to the<br />

loading calculation, layout, <strong>and</strong><br />

specification of the various high-rise<br />

plumbing systems, water recycling<br />

systems, VRV air-conditioning, electrical<br />

systems, alternate power storage &<br />

generation solutions, <strong>and</strong> a conceptual<br />

application of an integrated building<br />

management system. It was the intent of<br />

the designer to approach the theoretical<br />

design thesis with the same rigors due to<br />

an actual real-life project.<br />

Structure <strong>and</strong> method of<br />

construction integrate into the<br />

design <strong>and</strong> function of the<br />

high-rise building from its<br />

foundations to its roof deck.<br />

email: cmllanto.official@gmail.com<br />

site + portfolio: www.carlollanto.com<br />

linkedin: /cmllanto

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!