Oman National Engineering & Investment Co. (SAOG)<br />
Internal <strong>Audit</strong> <strong>Report</strong> (1 st Quarter, <strong>2016</strong>)<br />
Apr-<strong>2016</strong><br />
S.No Observation & Impact Recommendation Priority<br />
5 Vehicles lying at Ghala workshop:-<br />
On our visit to Ghala workshop to A detailed standard operating<br />
physically review the status of the vehicles procedure to be implemented to give<br />
M<br />
available at the workshop as on the guidelines to handles such issues and<br />
brought to our notice.<br />
30.09.2015, the following issues have been<br />
periodical basis.<br />
all exceptions must be reported on<br />
‣ There are eight vehicles lying in the<br />
yard as total loss vehicle after the accident.<br />
These vehicles have been lying for years<br />
though the actual date is not available as<br />
per the workshop personnel. The details of<br />
the insurance claim and the status of the<br />
recovery are not available. The details of<br />
the vehicles have been provided as<br />
Annexure 4. However during the<br />
finalization of the audit report, the<br />
concerned personnel from the logistic<br />
department has made necessary follow ups<br />
with the insurance companies and other<br />
departments to complete the formalities to<br />
recover the claim of OMR 38,512.<br />
Necessary system modification must be<br />
made to update the status of the<br />
vehicles in the system such as vehicle at<br />
workshop but not in use, vehicles cannot<br />
be used and ready for disposal,<br />
Vehicles under accident and total loss<br />
etc. This system modification will help to<br />
make the insurance renewal for the<br />
vehicles in use.<br />
‣ The insurance premium also paid<br />
for all the total loss vehicles though which is<br />
quite sure that these vehicles cannot be<br />
used anymore.<br />
There are 12 vehicles in working conditions<br />
returned from various sites as not required<br />
for the use are available in the workshop.<br />
However these vehicles have not been<br />
allotted to any station. The details of the<br />
vehicles have been provided as Annexure<br />
5<br />
Impact:-<br />
• Accident vehicles lying for years without<br />
any action on insurance claim follow up<br />
and disposal shall amount to the loss to<br />
the company to the extent of the<br />
possible recovery<br />
• Loss to the extent of insurance cost<br />
incurred for the accident vehicles.<br />
Management’s Response:-<br />
HR:-<br />
All the 8 No’s Vehicles auction and received credit note. Already this 12 Vehicles transferred to different<br />
sites.<br />
Finance:-<br />
• Logistics department is taking care of above points.<br />
- 17 -