2.3. Assessment of strengths and weaknesses of support scheme<br />

Please summarise what you consider key strengths and weaknesses of the support scheme. Also<br />

highlight necessary amendments from your point of view.<br />

Strengths of subsidies:<br />

• Subsidies are available for off grid <strong>PV</strong> systems for location without electricity and remote<br />

mountainous regions and also for small grid connected systems.<br />

• The subsidies are already by themselves promoting <strong>PV</strong> technology-<br />

Weaknesses:<br />

• These subsidies are available only for very small <strong>PV</strong> systems (from 100 W to maximum 1<br />

kW). Serious projects are not taken into account.<br />

• The subsidies are given after execution of investments and are available only for a very<br />

short time during the year. There is practically very low possibility to present a complete<br />

application.<br />

• The support mechanism has negative effect in a sense that potential investors are not<br />

acting but mainly waiting for new call.<br />