21.02.2017 Views

Eyes on Ghana

GASCO-July-2016-Issue2

GASCO-July-2016-Issue2

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

JULY 2016<br />

and counselling services were provided.<br />

The Teak and Poui platforms have been in operati<strong>on</strong><br />

for 34 years and were the result of a decisi<strong>on</strong> by<br />

GORTT in 1979 to study and project the savings the<br />

country would realise if it were to c<strong>on</strong>serve some<br />

of the associated gas produced in c<strong>on</strong>juncti<strong>on</strong> with<br />

crude oil operati<strong>on</strong>s from the Teak and Poui marine<br />

fields. In the Petroleum Regulati<strong>on</strong>, Clause 93 refers to<br />

Unused natural gas as follows:<br />

“The Minister may at any time call up<strong>on</strong> an<br />

Explorati<strong>on</strong> and Producti<strong>on</strong> Licensee to deliver to<br />

him without compensati<strong>on</strong> any quantity of natural<br />

gas, produced in associati<strong>on</strong> with crude oil, not<br />

being required by the licensee for his operati<strong>on</strong>s or<br />

for sale, which may be needed in the public interest,<br />

except that where the recovery, delivery or storage<br />

of such natural gas requires the c<strong>on</strong>structi<strong>on</strong> of<br />

any new facilities, such facilities shall be provided<br />

by Government. Such natural gas shall be free of<br />

royalty.”<br />

The Ministry of Energy of the day, ascertained that the<br />

natural gas from the then Amoco Trinidad Oil Company<br />

(ATOC) Teak and Poui fields, should be directed to<br />

NGC for collecti<strong>on</strong> and compressi<strong>on</strong>. Based <strong>on</strong> this<br />

decisi<strong>on</strong>, NGC was mandated to implement the ‘NGC<br />

Flare Gas C<strong>on</strong>servati<strong>on</strong> Project,’ which comprised the<br />

design, c<strong>on</strong>structi<strong>on</strong> and installati<strong>on</strong> of two offshore<br />

compressi<strong>on</strong> platforms, which were commissi<strong>on</strong>ed in<br />

1982.<br />

This operati<strong>on</strong> was unique in that the gas compressi<strong>on</strong><br />

operati<strong>on</strong> was designed to collect low pressure gas at<br />

between 15 and 20 psi and compress that up to 1,000<br />

psi in an offshore envir<strong>on</strong>ment. Over the 34 years,<br />

NGC was able to collect a little over 950 Billi<strong>on</strong> Cubic<br />

Feet at an average of 80 MMscf/d. This compressed<br />

gas supplemented gas purchased from gas producers<br />

and over time lowered the average gas acquisiti<strong>on</strong><br />

cost to NGC.<br />

Gas producti<strong>on</strong> peaked in 1995 at 106 MMscf/d and in<br />

2005, the original mandate for the operati<strong>on</strong> of the<br />

project changed. NGC was no l<strong>on</strong>ger an offshore gas<br />

supplier but a provider of compressi<strong>on</strong> services to<br />

bpTT (formerly Amoco) and then to Repsol.<br />

Since 2012, declining natural gas supply from offshore<br />

fields has led to a significant reducti<strong>on</strong> in compressed<br />

volume delivered by the Teak and Poui platforms.<br />

This c<strong>on</strong>tracti<strong>on</strong> coupled with rising maintenance<br />

and rehabilitati<strong>on</strong> costs <strong>on</strong> account of the age of the<br />

assets, has impaired the profitability of the facilities<br />

operati<strong>on</strong>s.<br />

The lease agreement with Repsol allows NGC to<br />

rati<strong>on</strong>alise costs while maintaining strategic ownership<br />

of the asset for the future. In retrospect, the Teak and<br />

Poui gas compressi<strong>on</strong> platforms fulfilled its mandate<br />

of c<strong>on</strong>serving the low pressure associated gas that<br />

was being flared without utilisati<strong>on</strong> and c<strong>on</strong>tributed<br />

to a reducti<strong>on</strong> of carb<strong>on</strong> dioxide into the atmosphere.<br />

Over the past 34 years, the volume of gas c<strong>on</strong>served<br />

represents about 5% of the proven gas reserves of the<br />

country and therefore c<strong>on</strong>tributed to employment<br />

opportunities, adding value to NGC’s profitability and<br />

increasing the country’s Gross Domestic Product.<br />

Annual Technical Meeting, 2016<br />

This year’s Annual Technical Meeting (ATM) was<br />

held <strong>on</strong> Tuesday 26th April 2016 and marked the<br />

first official visit by the H<strong>on</strong>ourable Nicole Olivierre<br />

Minister of Energy and Energy Industries (MEEI), to<br />

NGC. The ATM c<strong>on</strong>tinues to be an important event<br />

<strong>on</strong> the NGC calendar as it offers the Company an<br />

opportunity to report <strong>on</strong> NGC’s operati<strong>on</strong>s for the<br />

past calendar year as well as provide a look ahead for<br />

the m<strong>on</strong>ths to come.<br />

In delivering remarks <strong>on</strong> behalf of the MEEI, Minister<br />

Olivierre emphasised that, “… NGC has a critical<br />

role in ensuring c<strong>on</strong>tinued operati<strong>on</strong>s of the local<br />

midstream and downstream energy sector, even<br />

given l<strong>on</strong>gstanding upstream supply issues. The<br />

current structural shifts in both the global natural gas<br />

industry and in gas-based petrochemicals have been<br />

challenging to both natural gas producers and to<br />

natural gas buyers and sellers. The prognosis for the<br />

industry is that an envir<strong>on</strong>ment of lower prices will be<br />

maintained for the foreseeable future.<br />

“As the primary local natural gas seller, and as a party<br />

with a vested interest in the viability of the local<br />

downstream gas sector, NGC, in c<strong>on</strong>cert with both<br />

the gas buyers and sellers must c<strong>on</strong>tinue the process<br />

of c<strong>on</strong>structive dialogue to successfully navigate this<br />

period to ensure, as much as is possible, mutually<br />

profitable outcomes,” the Minister c<strong>on</strong>tinued.<br />

The sessi<strong>on</strong> which provided a holistic look of NGC’s<br />

2015-2016 operating year included presentati<strong>on</strong>s by<br />

the following members of NGC’s Management Team:<br />

• Narinejit Pariag – Vice President, Finance &<br />

Informati<strong>on</strong> Management Group (Ag)<br />

• R<strong>on</strong>ald Adams – Vice President, Gas Transmissi<strong>on</strong><br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!