Selected References - Pörner Ingenieurgesellschaft mbH
Selected References - Pörner Ingenieurgesellschaft mbH
Selected References - Pörner Ingenieurgesellschaft mbH
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 1 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
PCK Raffinerie G<strong>mbH</strong> Schwedt Schwedt Germany<br />
2009<br />
Revamp of the stripping column with further peripheral<br />
equipment to improve the propene recovery process<br />
Basic engineering, detail engineering, procurement and<br />
expediting, construction and installation supervision,<br />
commissioning<br />
PCK Raffinerie Schwedt Deutschland Germany<br />
2009<br />
Replacement of the main column for improvement of MD<br />
recovery and for production of a jet fuel component;<br />
replacement of column with a 1350t crane and assembly of<br />
column parts on site<br />
Detail engineering, construction and installation supervision,<br />
procurement and expediting<br />
PETROM Petrobrazi Romania<br />
2009<br />
Automatic Crude Oil sampling units FEED<br />
PETROM Petrobrazi Romania<br />
2009<br />
SCLPP pipe connection and revamp of Jet tanks Feasibility Study<br />
PETROM Petrobrazi Romania<br />
2009<br />
LPG Odorisation unit FEED<br />
2010<br />
2010<br />
2010<br />
2009<br />
2009<br />
751<br />
749<br />
709<br />
713<br />
711
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 2 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
Romanian Refinery Onesti Romania<br />
2008<br />
Engineering of a DGRS plant Detail engineering including process simulation, specifications<br />
of columns and the stripper and all related equipment,<br />
commissioning and start-up<br />
Romanian Refinery Onesti Romania<br />
2008<br />
Engineering of a gas sweetening plant (amine washing<br />
section)<br />
Detail engineering including process simulation and<br />
specifications of columns and all related equipment (pumps,<br />
heat exchangers, tanks, measuring equipment, electrical<br />
system etc.)<br />
Kremsmüller Romania Pitesti Romania<br />
2007<br />
Complete electrical/I&C engineering, supply of all plant parts<br />
and spare parts for a gasoline blending plant that mixes<br />
various gasoline components to few specific gasoline mixtures<br />
Authority engineering, detail engineering, procurement,<br />
expediting, delivery, commissioning, start-up of<br />
instrumentation and automation<br />
AE&E Turceni Romania<br />
2008<br />
Engineering for a new fluegas desulphurisation plant Basic engineering for cable- & pipe routing including piping<br />
layout and electric-instrumentation-automation<br />
S.C. SYSCOM 18 S.R.L. Timisoara, Bacau Romania<br />
2008<br />
Revamp of a vapour return system in Bacau and Timisoara<br />
according to European and Romanian environmental<br />
regulations; retrofitting of pressure equalization system and<br />
vapour recovery system<br />
Detail engineering and preparation of the documents needed<br />
to acquire certificates and approvals (authority engineering)<br />
2009<br />
2009<br />
2009<br />
2008<br />
2008<br />
623<br />
620<br />
615<br />
627<br />
619
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 3 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
Colas S.A. Boulogne-Billancourt Gratkorn Austria<br />
2007<br />
Revamp of a Bitumen emulsion raw material and product<br />
storage with energy reduction of up to 80% due to savings in<br />
energy consumption and improvements in production process<br />
General engineering services including authority engineering,<br />
basic engieering, detail engineering, site supervision,<br />
commissioning<br />
OMV Schwechat Austria<br />
2007<br />
Revamp of hydrodesulphurization plant HDS 1 in Schwechat<br />
for reduction of sulphur content to less than 10ppm and<br />
capacity increase from 1,000 t/d to 3,500 t/d<br />
EPCM-Contractor incl. Project management, detailed<br />
engineering, procurement, site supervision, commissioning<br />
PCK Raffinerie G<strong>mbH</strong> Schwedt Germany<br />
2006<br />
Revamp of existing HF alkylation plant Basic engineering (UOP schedule A), detailed engineering,<br />
procurement, site supervision, site management, start-up<br />
PCK Raffinerie G<strong>mbH</strong> Schwedt Germany<br />
2005<br />
Installation of a FCC-Overcracking plant with C3 splitter<br />
(diameter 5.2 m, total height 84 m) to produce propylene in<br />
polymere grade quality<br />
Basic engineering, detailed engineering, procurement, site<br />
supervision,<br />
MOL Százhalombatta Hungary<br />
2006<br />
Authority Engineering Services for MOL Claus unit No. 6 and<br />
Naturalisation of Hungarian SINI Detailed Design at SINI´s<br />
Design Center located in Aker Kvaerner Power Gas Pvt. Ltd.<br />
in Mumbai, India<br />
Review and approval of SINI´s building construction, civil<br />
engineering documents and drawings, investigation of<br />
basement, civil works, soil investigation<br />
2008<br />
2008<br />
2007<br />
2007<br />
2006<br />
610<br />
612<br />
592<br />
591<br />
643
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 4 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
PETROM Petrobrazi Romania<br />
2006<br />
Optimization of tankfarms in Arpechim and Petrobrazi refinery<br />
with 1060 tanks; evaluation focus on cost minimization,<br />
improvement of logistics, meeting Romanian and EU<br />
environmental standards, network optimization<br />
Feasibility study and investment cost evaluation<br />
OMV Deutschland G<strong>mbH</strong> Burghausen Germany<br />
2005<br />
Revamp of HDS-1 Plant (desulfurization) Detail engineering, procurement, site supervision,<br />
commissioning<br />
BAYERNOIL Raffineriegesellschaft Ingolstadt Germany<br />
2004<br />
Installation of new refinery gas plant, modification of off-sites Detailed engineering, governmental approval procedure,<br />
procurement support, estimation of investment cost, site<br />
supervision, tests / acceptance tests, start-up assistance<br />
Büsscher und Hoffmann Enns Austria<br />
2003<br />
Revamp of a bitumen storage and a hot oil system incl.<br />
infrastructures for the production line for roofing, sealing and<br />
waterproofing membranes<br />
Site investigation, project study, governmental approval<br />
procedure, detailed engineering, package contractor tendering<br />
of process units, procurement assistance, site supervision and<br />
start-up assistance (general planning)<br />
DOMO Caproleuna G<strong>mbH</strong> Leuna Germany<br />
2004<br />
Revamp of a crude benzene plant Detail engineering<br />
2006<br />
2006<br />
2005<br />
2005<br />
2004<br />
637<br />
590<br />
589<br />
543<br />
664
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 5 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
MOL Magyar olaj- és gázipari Rt. Kordoskút Hungary<br />
2004<br />
Installation of a new oil barrel storage under environmental<br />
protection regulations<br />
Detailed engineering (process design, piping, instrumentation)<br />
Deutsche BP Erdölraffinerie Emsland Lingen Germany<br />
2003<br />
Capacity increase of existing coking facilities Detailed engineering and site supervision<br />
Samir Oil Refinery Casablanca Marocco<br />
2003<br />
Support for revamp of refinery in Casablanca Detail engineering support, procurement<br />
OMV Gänserndorf / Gerasdorf Austria<br />
2002<br />
Installation of technical plants and laboratories for training Project management, basic and detailed engineering,<br />
tendering and site supervision for process training plants<br />
(glass apparatus, distillation, heat exchanger, pumps,<br />
programmable logic control ..) and laboratories<br />
PCK Raffinerie G<strong>mbH</strong> Schwedt Germany<br />
2002<br />
Replacement of the existing main column FCC by a larger (6.2<br />
m of diameter) and higher (54 m) column<br />
Governmental approval, basic engineering, detailed<br />
engineering, procurement, site supervision and start-up<br />
assistance<br />
2004<br />
2004<br />
2004<br />
2004<br />
2004<br />
536<br />
527<br />
662<br />
541<br />
524
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 6 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
OMV Schwechat Austria<br />
2002<br />
Capacity extension of an existing mixing unit for polymere Basic design, detailed design, procurement assistance, site<br />
modified bitumen and integration of a new product storage tank supervision, start-up assistance<br />
Mider G<strong>mbH</strong> Leuna Germany<br />
2002<br />
Planning of the refinery shut down 2002 Detail engineering, site supervision<br />
Erdöl-Raffinerie-Emsland Lingen Germany<br />
2001<br />
Revamp of a UOP reformer for isomerization of light gasoline<br />
according to UOP Par Isom-process<br />
Extended basic engineering, governmental approval<br />
procedure, estimation of investment cost, equipment<br />
requisitions, detailed engineering<br />
TESSAG EDELEANU with UOP technology<br />
PCK Raffinerie G<strong>mbH</strong> Schwedt Germany<br />
2001<br />
Installation of a 500 m³ reactor (DESUS 1) and Increase of<br />
throughput of desulphurization unit to 140 t/h (DESUS 2)<br />
Basic engineering, detailed engineering, procurement, site<br />
supervision and start-up assistance<br />
EVVA Wien Austria<br />
2000<br />
Technical and economical assessment of a lube oil blending<br />
plant<br />
Preparation of the expert's report<br />
2003<br />
2002<br />
2002<br />
2002<br />
2001<br />
482<br />
646<br />
583<br />
523<br />
352
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 7 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
OMV Deutschland G<strong>mbH</strong> Burghausen Germany<br />
2000<br />
Installation of a desulphurization plant for the reduction of<br />
sulphur conect to max. 10 ppm<br />
Lump sum turn key delivery: governmental approval<br />
procedure, detailed engineering, procurement and delivery,<br />
site supervision, commissioning<br />
Licenser: Kellog Brown & Root<br />
Mineraloelraffinerie Oberrhein (MiRO) G<strong>mbH</strong> & Co. KG Karlsruhe Germany<br />
1999<br />
Retrofitting of a second reactor in the existing CHD4 plant for<br />
production of diesel fuel with a sulphur content of less than 10<br />
ppm<br />
Basic engineering, governmental approval procedure,<br />
estimation of investment cost, detailed engineering,<br />
procurement (partial)<br />
Capacity: 7,500 tpy<br />
Mineraloelraffinerie Oberrhein (MiRO) G<strong>mbH</strong> & Co. KG Karlsruhe Germany<br />
1999<br />
Reconstruction of existing naphtha hydrotreater NHD5 for<br />
gasoline production in two steps, sulphur content at capacities<br />
of less than 50 ppm / 2,400 tpd (1st step) and less than 10<br />
ppm / 2,800 tpd (2nd step)<br />
Extended basic engineering, governmental approval<br />
procedure, estimation of investment cost, detailed<br />
engineering, procurement, site supervision, tests / acceptance<br />
tests, start-up assistance<br />
TESSAG EDELEANU with IFP technology<br />
Mineraloelraffinerie Oberrhein (MiRO) G<strong>mbH</strong> & Co. KG Karlsruhe Germany<br />
1999<br />
Reconstruction of desulfurization CHD8 for production of<br />
diesel fuel with a sulphur content of less than 10 ppm<br />
Extended basic engineering, governmental approval<br />
procedure, estimation of investment cost, detailed<br />
engineering, procurement, site supervision, tests / acceptance<br />
tests, start-up assistance<br />
Capacity: 2,000 tpd<br />
PCK Raffinerie G<strong>mbH</strong> Schwedt Germany<br />
1999<br />
Retrofitting of a second reactor in the existing DK4 plant for<br />
production of diesel fuel oil with a sulphur content of less than<br />
10 ppm<br />
Extended basic engineering, governmental approval<br />
procedure, estimation of investment cost, detailed<br />
engineering, procurement, site supervision, tests / acceptance<br />
tests, start-up assistance<br />
Capacity: 7,500 tpd<br />
2001<br />
2001<br />
2001<br />
2001<br />
2001<br />
582<br />
584<br />
586<br />
585<br />
587
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 8 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
Turkmenbashi Lube Refinery Turkmenbashi Turkmenistan<br />
1996<br />
Installation of a luboil refinery inkl. All off-sites Licenses / test of pilot plant, basic engineering for all units,<br />
detailed engineering for vacuum distillation, furfurol extraction,<br />
MEK-dewaxing, intermediate tank farm; start-up assistance<br />
Avia Zwettl Austria<br />
1999<br />
Installation of a underground pipeline between railway station<br />
and tank farm<br />
Governmental approval documentation and negotiation, basic<br />
engineering for electrical and instrumentation, tendering<br />
Chemopetrol Litvinov Czech Republic<br />
1999<br />
Power supply and process automation of a production line for<br />
bituminous roofing felts by frequency controller and prozess<br />
control system with Siemens ProTool visualisation<br />
General contracting, i.e. detail engineering, procurement,<br />
erection and start-up of low voltage distribution and control<br />
cabinets and hard und software for the prozess control system<br />
OMV Schwechat Austria<br />
1999<br />
Reduction of total energy demand of the Schwechat refinery<br />
and optimizing of results by heat recovery; as first extension<br />
step heat energy of process unit will be moved to thermal<br />
power station, were boiler feed water is pre-heated<br />
Preparation of a feasability study to proof profitability and<br />
installation of an experimental unit for piloting of a technical<br />
solution;<br />
extended basic engineering for first extension step<br />
Basis: Pinch analysis by Kellogg<br />
ABB Lummus G<strong>mbH</strong> Shurtan Usbekistan<br />
1998<br />
Planing of a tank farm with spherical and fixed-roof tanks<br />
including settling tank<br />
Detail process design, detail engineering all disciplines excl.<br />
civil, pipework engineering with PDS<br />
2001<br />
1999<br />
1999<br />
1999<br />
1999<br />
588<br />
232<br />
139<br />
99<br />
572
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 9 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
Colas Gratkorn Austria<br />
1998<br />
Installation of a continous operated bitumen emulsion plant<br />
incl. tank farm, relocation of the existing batch plant at another<br />
factory<br />
Governmental approval documentation and negotiation<br />
OMV Schwechat Austria<br />
1998<br />
Modernisation of three cracking ovens, i.e. replacement of<br />
bundles, installation of dust blowers and<br />
replacement/extension of feed control equipment<br />
Detailed design, procurement, delivery and site supervision for<br />
electrical equipment and instrumentation, piping design, civil<br />
design and statical calculation<br />
Paramobit Hroznetin Czech Republic<br />
1998<br />
Power supply and process automation of a production line for<br />
bituminous roofing felts by frequency controller and prozess<br />
control system with Siemens ProTool visualisation<br />
General contracting, i.e. detail engineering, procurement,<br />
erection and start-up of low voltage distribution and control<br />
cabinets and hard and software for the prozess control system<br />
Addinol Mineralöl G<strong>mbH</strong> Krumpa Germany<br />
1997<br />
Modernisation fo an existing lubricant mixing plant project study incl. as-built investigation and necessary<br />
revamps incl. cost estimation<br />
Elin G<strong>mbH</strong> Leuna<br />
1997<br />
Engineering for product loading and unloading unit within<br />
Total Refinery Leuna<br />
Detail Engineering, included disciplines: process,<br />
machinery/apparatus, piping layout, electric-instrumentationautomation,<br />
civil & structural<br />
1999<br />
1999<br />
1998<br />
1998<br />
1998<br />
234<br />
47<br />
135<br />
464<br />
655
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 10 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
MIDER G<strong>mbH</strong> Leuna Germany<br />
1997<br />
Installation of 2 new heat exchangers and related piping,<br />
revamp UNIT 664<br />
Complete detail engineering<br />
NIOC National Iranian Oil Company Bandar Abbas Iran<br />
1993<br />
Installation of a Bitudrum bitumen drum manufacturing and<br />
filling unit (unit 66) within the supply of a complete<br />
petrochemical refinery<br />
Basic design for the process units, detailed engineering,<br />
procurement and supply of the plant equipment and material,<br />
site supervision, start-up, training and documentation (general<br />
contracting)<br />
Litvinov-Dachbahnenfabrik Litvinov Czech Republic<br />
1997<br />
Installation of a production unit for bituminous roofing<br />
membranes<br />
Complete detail engineering<br />
OMV Schwechat Austria<br />
1997<br />
Extension of an existing Bitumen production plant with a<br />
mixing unit for adding of polymers<br />
Preparation of a feasibility study<br />
PCK Raffinerie G<strong>mbH</strong> Schwedt Germany<br />
1996<br />
Engineering and Installation of a high-efficiency absorption<br />
and fuel oil vapor covery unit including pipe connection to<br />
tank farm, truck and rail loading stations<br />
Basic engineering, governmental approval procedure, detailed<br />
engineering, procurement, site supervision, start-up assistance<br />
1998<br />
1998<br />
1997<br />
1997<br />
1997<br />
348<br />
37<br />
346<br />
246<br />
580
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 11 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
PCK AG Schwedt Germany<br />
1995<br />
Reconstruction of 4 existing plants for increase of capacity,<br />
distillation yield and efficiency and safety improvement<br />
Governmental approval, basic engineering, detailed<br />
engineering, procurement, site supervision and start-up<br />
assistance<br />
BSL Böhlen G<strong>mbH</strong> (DOW-Gruppe) Böhlen Germany<br />
1995<br />
Capacity expansion of olefincracker Detail engineering special pipe supports<br />
PCK AG Schwedt Germany<br />
1995<br />
Revamp of tank camp and extension of loading capacity for<br />
different fuel oils up to 4,7 mcbmpy<br />
Basic engineering, governmental approval procedure,<br />
detailed engineering, procurement, site supervision,<br />
commissioning<br />
PCK AG Schwedt Germany<br />
1995<br />
Installation of a neutralization plant for alkylation of<br />
hydrofluoric acid including off-sites<br />
Basic engineering, governmental approval procedure,<br />
detailed engineering, procurement, site supervision, start-up<br />
assistance<br />
PCK AG Schwedt Germany<br />
1995<br />
Installation of a flue gas desulphurization plant for a new<br />
power plant at PCK raffinery Schwedt: adsorption, redotherm<br />
claus 3 + 4, flue gas desulphurization, regeneration, waste<br />
water treatment, tank store<br />
Governmental approval procedure, detailed engineering,<br />
procurement, site supervision, start-up assistance<br />
1997<br />
1996<br />
1996<br />
1996<br />
1996<br />
522<br />
332<br />
571<br />
575<br />
568
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 12 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
PCK AG Seefeld b. Berlin Germany<br />
1995<br />
Extension of loading capacity to 4.7 m3/a of gasoline, diesel<br />
and fuel oil<br />
Basic engineering, governmental approval procedure,<br />
detailed engineering, procurement, site supervision,<br />
commissioning<br />
Leuna Werke G<strong>mbH</strong> Leuna Germany<br />
1994<br />
Cracker shut down inclusive new back ethene pipeline 4,5 km General planning inclusive authority engineering, basic<br />
engineering, detail engineering, project management, site<br />
supervision, start-up (turn-key)<br />
Leuna Werke G<strong>mbH</strong> Leuna Germany<br />
1994<br />
Revamp preheater 2 for crude oil distillation General planning inclusive authority engineering, basic<br />
engineering, detail engineering, project management, site<br />
supervision, start-up (turn-key)<br />
PCK AG Schwedt Germany<br />
1993<br />
Installation of a plant on the basis of UOP, naphtha- gasoline<br />
desulfurization and Penex-technology, feed material: C5 /C6<br />
fraction containing 2% benzene<br />
Basic engineering, governmental approval procedure, detailed<br />
engineering, procurement, site supervision, start-up<br />
Capacity: 1,650 tpd<br />
DEA Mineraloel AG Plant UK Wesseling Wesseling Germany<br />
1993<br />
Reconstruction of 5 Tanks 5.000 - 10.000 m³, Repair /<br />
Connection to Pipeline of RMR Comp.<br />
Basic engineering, governmental approval procedure,<br />
detailed engineering, procurement, site supervision, start-up<br />
1996<br />
1995<br />
1995<br />
1995<br />
1994<br />
594<br />
652<br />
651<br />
569<br />
570
<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />
A-1050 Vienna, Hamburgerstraße 9<br />
Tel. 01/58 990-0, Fax 01/58 990-99<br />
vienna@poerner.at, www.poerner.at<br />
<strong>Selected</strong> <strong>References</strong><br />
Refinery, Oil Industry<br />
A15W001A.MDB<br />
05.10.2010<br />
Page 13 of 13<br />
Client Place Country Start End<br />
Project description Services and supplies by <strong>Pörner</strong> Remark<br />
RAG Rohölaufsuchungsgesellschaft Krift & Sattledt Austria<br />
1992<br />
Installation of 3 de-sulfuration units for oil well gas Basic design, detailed engineering and tendering for piping<br />
and erection<br />
Shell Lobau Austria<br />
1992<br />
Extension of a lube oil blending plant with dosing/scaling<br />
vessels, truck and train filling facilities and process automation<br />
with INTOUCH visualisation<br />
Detailled engineering, procurement, erection and start-up<br />
(general contracting) of civil and steel structure, dosing and<br />
filling units and hard and software for the process control<br />
system<br />
DEA Mineraloel AG, Erdölwerke Holstein, Heide Heide Germany<br />
1991<br />
Extension of 7 new tanks (500 - 5000 m³), revamp of existing<br />
tanks, installation of a new pump station<br />
Basic engineering, governmental approval procedure,<br />
detailed engineering, procurement, site supervision,<br />
commissioning<br />
1993<br />
1993<br />
1993<br />
469<br />
124<br />
573