EDITORS CORNER<br />

We are here with the first edition of our monthly e-<strong>magazine</strong> .<br />

Throughout the process of making this e-<strong>magazine</strong>, many individuals<br />

from our organization have taken time out to help me out. I would like<br />

to take this opportunity to express my gratitude and appreciation for<br />

the support and assistance you all provided to me. I would like to give<br />

a special thanks to Sh.Gyan Bhadra Ji, Sh.Perveen Puri Ji,Sh.Sanjeev<br />

Mahajan Ji, Sh.Sanjay Gupta Ji and HBPCL organization as a whole for<br />

actively participating in the feedback and contributions for this e-<br />

<strong>magazine</strong> via the mailing lists.<br />

Thanks to Sh.PP Semwal Ji for his help in providing me with a working<br />

toolset.<br />

Your advice or suggestions will be much appreciated and welcomed....<br />

2<br />

ANUVRATA PANDEY<br />

SR.ENGG(CIVIL)


CONTENT<br />

‣About JSW Group and JSW Energy Limited<br />

‣About HBPCL<br />

‣Corporate Social Responsibility<br />

‣Sports and Cultural Activities<br />

‣Safety Activities<br />

3


ABOUT JSW GROUP AND JSW ENERGY<br />

An $11 billion conglomerate, JSW Group is one of India's largest<br />

business conglomerates. It is led by Sajjan Jindal and part of the US<br />

$15 billion O. P. Jindal Group. The group has strong footprints across<br />

various sectors namely, Steel, Energy, Minerals, Port & Infrastructure &<br />

Cement in multiple locations across India, US, South America and<br />

Africa. JSW Steel Ltd, JSW Energy, JSW Infrastructure, Ispat industries<br />

Ltd are subsidiaries of JSW Group.<br />

Today, JSW Energy has a power generation capacity of 4531<br />

megawatts, JSW Steel has one of the largest single blast furnace with<br />

a capacity of 3.3 MTPA, taking JSW’s overall installed capacity of 14.3<br />

MTPA, JSW Steel is India’s leading private sector steel producer. The<br />

headquarters for JSW group are located at JSW Centre, Bandra Kurla<br />

Complex, Mumbai.<br />

4


JSW Energy Limited (the “Company”), a member of the JSW Group, has<br />

inter alia set up business facilities across different states within India.<br />

The Company has its current domestic operations at different locations<br />

such as Vijayanagar in Karnataka, Ratnagiri in Maharashtra , Barmer in<br />

Rajasthan and Hydro Project in Kinnaur,HP through its Subsidiary, and<br />

has plans for new projects coming up in other locations such as Hydro<br />

Project at Kuther in Himachal Pradesh, thermal power plant in Raigarh,<br />

Chhattisgarh, etc.Keeping the above in mind, JSW Energy is not only<br />

committed to creating more smiles at every step of the journey, but it is<br />

in constant pursuit of making life better for communities with its<br />

various initiatives in the fields of improving living conditions, promoting<br />

social development, addressing environmental concerns, addressing<br />

social inequalities, promoting art & culture, sports and Swachh Bharat<br />

mission amongst others.<br />

5


HBPCL<br />

(KWHEPS)<br />

The Karcham Wangtoo Hydroelectric Plant is a 1,000 megawatts<br />

(1,600,000 hp) run-of-the-river hydroelectric power station on the Sutlej<br />

River in Kinnaur district of Himachal Pradesh, India. The dam and<br />

power station are located between the villages of Karcham and<br />

Wangtoo where the plant also gains its name. first generator was<br />

commissioned in May 2011, the second in June and the final two in<br />

September.The 98 m (322 ft) tall dam at Karcham<br />

(31°30′00.26″N 78°10′39.54″E) diverts a substantial portion of the Sutlej<br />

into a 10.48 m (34.4 ft) diameter and 17.2 km (10.7 mi) long headrace<br />

tunnel to the underground power station downstream at Wangtoo. At<br />

the station, the water powers four 250 MW Francis turbine-generators<br />

before it is sent back into the Sutlej via a 1.2 km (0.75 mi) long tailrace<br />

tunnel. The difference in elevation between the dam and the power<br />

station affords a gross hydraulic head of 298 m (978 ft).<br />

6


BASPA(II)<br />

Baspa (Stage II) Hydro-Electric Power Station of 300 MW generating<br />

capacity is located in the higher reaches of Himalayas and is an<br />

environment friendly power station, devoid of any rehabilitation or<br />

resettlement.<br />

The diversion barrage is located in village Kuppa near Sangla at EL<br />

2531m and the powerhouse is located near village Karcham, just<br />

upstream of the Karcham Dam. The Project is a run-of-the river<br />

scheme, utilizing a gross head of 716 m between the barrages. The<br />

powerhouse is estimated to generate 1213 GWh in 90% dependable<br />

year. This project was fully commissioned on 8th June 2003 and has<br />

been generating power ever since.<br />

.<br />

7


9


STALL OF HANDLOOM PRODUCTS AT SHOLTU<br />

• An exhibition was installed at Sholtu on 26.04.2017<br />

• Products of Handloom Centres were kept for sale.<br />

10


WORKSHOP FOR ANGANWADI SEVIKAS<br />

• Conducted monthly Workshops for all Anganwadi Sevikas of DIZ at<br />

five places.<br />

• Every month the training is scheduled for Anganwadi sevikas at each<br />

Supervisors office.<br />

11


FACILITY OF DRINKING WATER IN GP CHAGAON<br />

• To meet the shortage of water in Gram Panchayat Chagaon, HBPCL is providing drinking water<br />

through a water tanker engaged for it.<br />

• A submersible pump is installed near Adit#3 from where the pipeline is scheduled to be laid to Gram<br />

Panchayat Chagaon so that the shortage of water in this Panchayat may be permanently sort out.<br />

12


NAUGURATION & DEDICATION OF GOVT MIDDLE SCHOOL SHOLTU<br />

• The Renovation work of Govt Middle School Sholtu has been completed.<br />

• The School building was inaugurated by Hon’ble Deputy Speaker HP Vidhan Sabha,<br />

on 26.04.2017, and Dedicated to Gram Panchayat Punang.<br />

13


SWACHH BHARAT ABHIYAAN DRIVE<br />

• SBA drive was conducted at Kuppa on 24.04.2017 by Kuppa Staff.<br />

14


TRAINING FOR TEACHERS & STUDENTS IN GOVT<br />

SCHOOLS OF DIZ<br />

• HBPCL has strengthened 05 Labs of 05 Govt. Schools of DIZ by providing Models and Back<br />

drops<br />

• Provided training to the Teachers & students of these Schools by M/S STEM Learning.<br />

15


PLANTATION DRIVE<br />

CONDUCTED ON<br />

29.04.2017 BY JVM AND<br />

CSR<br />

NEAR WANGTOO<br />

( DUMPING NO.34)<br />

16


17


To create positive atmosphere among the employees and workers of HBPCL, every<br />

month atleast one sports/cultural program is organized under UMANG initiative.<br />

Accordingily, on 27.04.2017 Basketball tournament was organized .<br />

18


19


SAFETY ACTIVITIES<br />

20


FIRE SAFETY<br />

Fire safety week campaign and disaster awareness<br />

21


22


THANK YOU<br />

for your support<br />

‣ Sh.Perveen Puri Ji<br />

‣ Sh.Sanjeev Mahajan Ji<br />

‣ Sh.Sanjay Gupta Ji<br />

‣ Sh.Sanjay Law Ji<br />

‣ Sh.Kanwar Singh Ji<br />

‣ Sh.Naveen Thakur Ji<br />

‣ Sh.Nitin Gupta Ji<br />

‣ Sh.Rajender Verma Ji<br />

‣ Sh.P P Semwal Ji<br />

‣ Sh.Ganesh Datt Ji<br />

23<br />

Feedback is welcomed....<br />

ANUVRATA PANDEY<br />

EDITOR

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!