22.06.2017 Views

CIBSE Australia and New Zealand 30th Anniversary

30 years and counting! Take a look back at CIBSE ANZ's accomplishments and achievements from the past 30 years.

30 years and counting! Take a look back at CIBSE ANZ's accomplishments and achievements from the past 30 years.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

© Charterhall - May 2017<br />

BUILDING FEATURES<br />

»»<br />

PCA A-Grade offices<br />

»»<br />

Glass curtain walls with uninterrupted views<br />

»»<br />

Light-filled, spacious open plan offices with<br />

flexible floor plates<br />

»»<br />

Natural light <strong>and</strong> generous open workspaces<br />

»»<br />

Internal staircase (ground to level 18) in additional<br />

to 8 lifts providing access from ground, <strong>and</strong> 1st to<br />

18th floors<br />

»»<br />

End of trip facilities<br />

»»<br />

Direct access to public transport hubs<br />

»»<br />

Community garden<br />

»»<br />

Overlooks Parliament Gardens <strong>and</strong> the Parliament<br />

of Victoria building<br />

»»<br />

Proximity to Carlton <strong>and</strong> Fitzroy Gardens<br />

SUSTAINABILITY<br />

One Nicholson’s workplace atmosphere is characterised<br />

by its natural light <strong>and</strong> generous open spaces,<br />

designed to inspire <strong>and</strong> encourage collaboration. The<br />

relaxed ambiance embraces a contemporary colour<br />

palette with polished concrete floors, <strong>and</strong> furnishings<br />

styled with reimagined 1950s charm.<br />

The building possesses the following impressive<br />

sustainability credentials:<br />

»»<br />

4 Star NABERS Energy Rating<br />

»»<br />

3 Star NABERS Water Rating<br />

»»<br />

Recycling resources<br />

RECENT PROJECTS<br />

»»<br />

In 2009, the building underwent a PowerPax<br />

adiabatic chiller system upgrade along with<br />

significant airside re-configuration to allow for<br />

pre-cooling of outside air<br />

»»<br />

Replacement programme of all perimeter<br />

induction units from three-way to two-way<br />

valves to optimise chilled water pump speeds<br />

»»<br />

Building tuning programme underway with<br />

AG Coombs since 2011 has contributed to the<br />

current 4 star NABERS Energy rating<br />

»»<br />

Lift hardware upgrade including replacement<br />

of drives, machines <strong>and</strong> controls. Interestingly,<br />

there was no brief to convert to destination<br />

control due to the existing lift capacity. Interiors<br />

have been designed to reflect <strong>and</strong> modernise<br />

the original Bates Smart design (Project<br />

scheduled for completion in 2018).<br />

19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!