30.06.2017 Views

CSG-Renewable_Topolog_RomaniaPDD_EN

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

www.csgstandard.com<br />

www.zeroco2.cc<br />

Justification for choosing source of data or<br />

description of measurement methods and<br />

procedures actually applied:<br />

Any comment:<br />

The information is official and publicly available<br />

Official data<br />

Table 7. FCE i<br />

Data / Parameter:<br />

FCE i<br />

Data unit:<br />

TJ/y<br />

Description:<br />

Total energy value of “i” type of energy resource<br />

used in the Romanian electricity generation<br />

industry for the given year<br />

Source of data used:<br />

Romanian Energy Regulatory Authority (ANRE)<br />

Value applied: Details in Annex 2<br />

Justification for choosing source of data or The information is official and publicly available<br />

description of measurement methods and<br />

procedures actually applied:<br />

Any comment:<br />

Official data<br />

Table 8. EF i<br />

Data / Parameter:<br />

EF i<br />

Data unit:<br />

tCO 2 e/TJ<br />

Description:<br />

Emission factor of “i” type fuel<br />

Source of data used:<br />

The Romanian National Institute of Statistics<br />

Value applied: Details in Annex 2<br />

Justification for choosing source of data or The information is official and publicly available<br />

description of measurement methods and<br />

procedures actually applied:<br />

Any comment:<br />

Official data<br />

2.6.3. Ex-ante calculation of emission reductions<br />

Emission factor<br />

The emission factor (EF CO2 ) for the proposed Project Activity is calculated as the formula (3):<br />

EF CO2 = 0.640tCO 2 e/kWh<br />

Baseline emissions<br />

Baseline emission (BE) for the proposed Project Activity is calculated as the formula (1):<br />

BE 2011 = 0.640 × 805.6 = 516.3 tCO 2 e/y;<br />

BE 2012 = 0.640 × 966.5 = 619.4 tCO 2 e/y;<br />

BE 2013 = 0.640 × 1114.8 = 714.5 tCO 2 e/y;<br />

BE 2014 = 0.640 × 821.2 = 526.4 tCO 2 e/y;<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!