Outstanding biomass treatment with the QZ - MeWa Recycling ...
Outstanding biomass treatment with the QZ - MeWa Recycling ...
Outstanding biomass treatment with the QZ - MeWa Recycling ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Kolba, managing director of <strong>the</strong> newly<br />
founded UFH <strong>Recycling</strong> GmbH based<br />
in Vienna. The future operating company<br />
is a joint venture of UFH Holding<br />
GmbH, <strong>the</strong> market leader among Austrian<br />
collection and recycling systems and<br />
REMONDIS, one of <strong>the</strong> world’s largest<br />
service providers in <strong>the</strong> area of closed<br />
loop recycling management.<br />
In an initial step, all recyclable components<br />
such as cables and glass deposits<br />
are removed. Next, environmentally<br />
harmful refrigerators and <strong>the</strong> compressor<br />
oil are drained off by specialists and<br />
<strong>the</strong> compressors are removed from <strong>the</strong><br />
old refrigerators. The <strong>QZ</strong> 2000 <strong>the</strong>reafter<br />
processes around 50 to 60 refrigerators<br />
<strong>MeWa</strong>-News March 2009<br />
per hour in an insulated system. The<br />
shredded PUR foam is sieved off and<br />
free from CFC residue. Environmentally<br />
harmful gases are finally cooled down<br />
in cryogenic condensation, liquefied<br />
<strong>the</strong>n collected in special reservoirs before<br />
being disposed of later. After <strong>the</strong><br />
<strong>QZ</strong>, mechanical processes separate <strong>the</strong><br />
iron and o<strong>the</strong>r metals and plastics from<br />
one ano<strong>the</strong>r.<br />
30 employees working in three shifts<br />
toge<strong>the</strong>r <strong>with</strong> state-of-<strong>the</strong>-art mechanical<br />
engineering ensure a high turnover<br />
of around 1,000 refrigerators per<br />
day. Therefore <strong>the</strong> entire requirements<br />
of <strong>the</strong> Alpine Republic are covered by<br />
<strong>the</strong> new plant. ■<br />
<strong>MeWa</strong>-International<br />
Homogenous output:<br />
Aluminium and copper fraction.<br />
The <strong>MeWa</strong> team has built <strong>the</strong> refrigerator recycling system in just<br />
eight months’ construction time so it is ready for commissioning:<br />
Elmar Kniesel, Jens Holzbach, Hans-Gerd Wilke, Mustafa Smailovic,<br />
Daniel Treyer, Wilhelm Schöffler (from left to right).<br />
Degassing system Stage 1.