21.10.2017 Views

Property Report A4 2

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.3 Scope of Works Cont.<br />

Open door way / remove wall to<br />

create open living / dining<br />

Paint all timber door frames<br />

and door white<br />

Demolish kitchen. Replace with<br />

new and review layout<br />

Interior - Dining / Kitchen<br />

Remove bench seat<br />

Paint ceiling and walls<br />

throughout<br />

Open door way / remove wall to<br />

create open living / dining<br />

Demolish kitchen. Replace with<br />

new and review layout<br />

Interior - Kitchen<br />

Paint walls and ceiling<br />

throughout<br />

New modern light<br />

Paint all timber door frames<br />

and door white<br />

Open door way / remove wall to<br />

create open living / dining<br />

Demolish kitchen. Replace with<br />

new and review layout<br />

Interior - Kitchen<br />

57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!