MID RISE Code
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Jumeirah Village - Development <strong>Code</strong> Mid-Rise Lots<br />
Revised October 2006
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e 0 c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e L L C<br />
ta b l e o f c o n t e n t s<br />
INTRODUCTION 1<br />
The Eight Principles of Jumeirah Village 1<br />
The Jumeirah Village - Master Plan and Development <strong>Code</strong> 2<br />
Contents of the Development <strong>Code</strong> 2<br />
1. GENERAL PROVISIONS 3<br />
Section 1.01. Title 3<br />
Section 1.02. Authorities 3<br />
Section 1.03. Purpose & Intent 3<br />
Section 1.04. Applicability 3<br />
Section 1.05. Amendments 3<br />
Section 1.06. Measuring System 3<br />
2. REVIEW AUTHORITY 4<br />
Section 2.01. General Authority 4<br />
Section 2.02. Development <strong>Code</strong> Administrator 4<br />
Section 2.03. Development Review Board 4<br />
3. ZONE 6<br />
Section 3.01. Establishment of Zones 6<br />
Section 3.02. Official Zoning Map 6<br />
Section 3.03. Interpretation of Boundaries 6<br />
Section 3.04. Uniform Application of Zones 6<br />
4. USE 9<br />
Section 4.01. Types of Use 9<br />
Section 4.02. Use Categories 9<br />
Section 4.03. Conditional Use 9<br />
Section 4.04. Accessory Use or Structure 9<br />
Section 4.05. Temporary Use 12<br />
5. FORM CODE – <strong>MID</strong>-<strong>RISE</strong> LOTS 13<br />
Section 5.01. General 13<br />
Section 5.02. Building Configuration and Size 13<br />
Section 5.03. Building Setbacks 14<br />
Section 5.04. Urban Design 14<br />
Section 5.05. Architectural Treatments 14<br />
6. PARKING AND LOADING 17<br />
Section 6.01. Purpose and Type 17<br />
Section 6.02. General Provisions 17<br />
Section 6.03 Space Requirements 17<br />
Section 6.04. Space and Lot Design 17<br />
Section 6.05. Loading Areas 19
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
j u m e i r a h v i l l a g e - M I D R I S E d e v e l o p m e n t c o d e<br />
<br />
Introduction<br />
i n t r o d u c t i o n<br />
The Eight Principles of Jumeirah Village<br />
Jumeirah Village is a community designed to embody a vision<br />
of peace, harmony, health, and happiness – a community with<br />
the highest standards of quality of life created by capturing<br />
the best characteristics of Arab and Western culture. Overall,<br />
eight principles form the foundation of Jumeirah Village:<br />
Sense of Peace and Community<br />
Jumeirah Village promotes an environment that features<br />
peace and harmony among neighbors. Emphasis is placed<br />
upon creating an atmosphere that promotes friendship,<br />
family, healthy interaction and other dynamic traits that<br />
set the neighborhoods of this community apart from other<br />
development.<br />
Pedestrian Friendliness<br />
Walking and biking are more than exercise. They are an<br />
invitation to meet friends, allow children to play, and live life<br />
at a slower pace. The design of Jumeirah Village promotes<br />
walking, biking and other alternatives through creation of a<br />
convenient and entertaining atmosphere, including features<br />
such as pedestrian access, landscaping, stores, street<br />
furniture, architectural detail, and open spaces.<br />
Water and Green Space<br />
Green spaces and water represent a healthy life and<br />
abundance in comparison to the stark beauty of the desert.<br />
Throughout Arab history, oases have served as attractions<br />
providing nourishment and focal points for gathering and<br />
association. Jumeirah Village celebrates the importance<br />
of greenery and water in the desert landscape through<br />
development of open spaces and water features that connect<br />
the neighborhoods and Zones of the community. Many of the<br />
public amenities found in Jumeirah Village including parks,<br />
sports fields, schools, mosques, and more are strategically<br />
clustered in the green spaces to create accessible gathering<br />
places reminiscent of the importance of the historic oasis.<br />
Mix of Symmetry and Natural Form<br />
Symmetry is a critical component of Islamic art, Arab<br />
architecture and Western urban design. However, many of<br />
the most successful communities and spaces in the world<br />
have “evolved” through a natural, organic pattern. Jumeirah<br />
Village is intentionally designed to capture a sense of<br />
symmetry through an organized radial pattern and median<br />
streets that end in a large-scale central park. At the same<br />
time, the design also allows neighborhoods and open spaces<br />
to occur in a more natural, pedestrian friendly manner.<br />
Mixed Use<br />
Actively mixed uses are a part of many of the most dynamic<br />
and successful communities throughout the world. Mixing<br />
uses promotes accessibility to major community features<br />
such as parks and commercial centers and provides natural<br />
gathering places for residents. Jumeirah Village intertwines<br />
uses in a manner that builds both economic viability and a<br />
sense of community.<br />
Icons and Focal Points<br />
Landmarks are an important component of the community as<br />
a tool for sense of direction, community recognition, and local<br />
pride. The unique towers, the central park, the interconnected<br />
series of open spaces, the meandering water feature, and<br />
the town centers are all icons that are unique to Jumeirah<br />
Village.<br />
Strong Public Space & Private Space<br />
A home is recognized as a place for privacy throughout Arab<br />
and Western culture. Today, the opportunity for privacy is<br />
increasingly more important as a healthy escape from the<br />
bustle of life. At the same time, however, public spaces<br />
are expected to be locations of significant and dynamic<br />
interaction – places for gathering, relaxing, entertaining, and<br />
shopping. Jumeirah Village offers a broad range of choices<br />
for privacy and proximity to public space. The best of both<br />
worlds is found throughout the community.<br />
Health and Happiness<br />
Jumeirah Village - is a living and working environment<br />
that offers superior quality of life, including a healthy and<br />
enjoyable living environment. The numerous, interconnected<br />
green spaces and clustered gathering spaces are<br />
intentionally designed to promote a healthy physical lifestyle.<br />
Neighborhoods are intended to promote social interaction.<br />
Jumeirah Village was created by applying these Eight<br />
Principles throughout the design process. Neighborhoods<br />
are designed to be places of interaction and enjoyment that<br />
are always within easy walking distance of parks, public
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e - o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
i n t r o d u c t i o n<br />
amenities, shopping needs, and friends. The streetscape<br />
is designed to be attractive, functional and inviting to both<br />
motorists and pedestrians. Jumeirah Village offers an<br />
immense number of choices in housing and neighborhoods<br />
amenities ranging from secluded villas to the bustle of living<br />
in the Town Center.<br />
The Jumeirah Village<br />
Master Plan and Development <strong>Code</strong><br />
Two documents guide the development of Jumeirah Village<br />
to ensure that the community reaches its full potential and<br />
appropriately applies the Eight Principles – The Master Plan<br />
and the Development <strong>Code</strong>. These documents work together<br />
to span the divide between the vision for Jumeirah Village<br />
and the standards necessary to ensure that all is completed<br />
according to plan.<br />
The Master Plan<br />
The purpose of the Master Plan is to set the general<br />
foundation for the physical design of Jumeirah Village. The<br />
Master Plan represents the physical layout of lots, open<br />
spaces and amenities throughout the site. The Master Plan<br />
also includes the overall design strategy that evolved from<br />
the initial Eight Principles for the project. It discusses the<br />
major features and characteristics that make Jumeirah<br />
Village unique, from the broad description of the relationship<br />
between neighborhoods, open spaces, streets, and centers<br />
to more detailed discussion of the appearance of the<br />
streetscape and the types of uses expected in the various<br />
community “centers”. The Master Plan establishes the<br />
general Circulation Plan for the community and, even here,<br />
the Eight Principles have been combined with the need for<br />
efficient and safe travel choices. The Master Plan document<br />
is accompanied by two Master Plan Maps – an illustrated<br />
map that generally depicts the look of a completed project<br />
and a digital map that delineates the specific location and<br />
coordinates of lots and spaces.<br />
The Development <strong>Code</strong><br />
The Master Plan is a guide, a detailed layout of spaces and<br />
Block Guidelines that provide clues to the detailed design<br />
of Jumeirah Village. The Development <strong>Code</strong> is a tool for<br />
implementing the Master Plan. It provides the regulatory<br />
framework that ensures structures and uses are located<br />
according to plan and that the anticipated high quality of life<br />
for residents, employees and guests in Jumeirah Village is<br />
realized. The Development <strong>Code</strong> is specifically designed to<br />
carry out several functions:<br />
A. Ensure design that promotes the highest principles of<br />
general health, welfare and safety for individuals that<br />
live, work or visit the community.<br />
B. Provide the minimum standards needed to carry out<br />
the vision established by the Master Plan. The intent of<br />
the Development <strong>Code</strong> is to focus, not reign in, creative<br />
freedom.<br />
C. Establish procedures needed for Jumeirah Village<br />
LLC to successfully carry out the requirements of the<br />
Development <strong>Code</strong>.<br />
D. Provide the tools to make sound decisions regarding the<br />
inevitable evolution of Jumeirah Village. Communities<br />
must change over time to remain dynamic. However,<br />
change does not have to come at the cost of maintaining<br />
the Eight Principles that make Jumeirah Village unique.<br />
This <strong>Code</strong> ensures that sufficient information and<br />
procedures are available to allow the community, and<br />
the tools used to guide development in the community,<br />
to change in ways that benefit Jumeirah Village over the<br />
long term.<br />
Contents of the Development <strong>Code</strong><br />
The Development <strong>Code</strong> for Jumeirah Village is designed<br />
to address a broad range of issues important to carrying<br />
out the functions described above and meeting the Eight<br />
Principles that serve as the foundation for the community. The<br />
guidelines address many issues common to all communities,<br />
but once again, they also show an attention to detail unique<br />
to Jumeirah Village. For example, traditional streets are<br />
designed with sufficient width to provide parking but codes<br />
commonly require that a development accommodate all<br />
potential parking on the site. In Jumeirah Village, however,<br />
on-street parking is strongly encouraged and is considered<br />
part of meeting parking requirements.<br />
Contents of the Development <strong>Code</strong> are broken down as<br />
follows:<br />
A. General Provisions. Introduce the Development <strong>Code</strong> and<br />
provide the purpose, intent and applicability of the <strong>Code</strong>.<br />
B. Review Authority. Confirms Jumeirah Village LLC as the<br />
ultimate authority regarding development in Jumeirah<br />
Village and designates representatives responsible for<br />
carrying out the daily duties of administering the <strong>Code</strong>.<br />
C. Zones. Divides the community into areas of common<br />
interest and typology for purposes of regulation.<br />
D. Use. Designates permitted uses in each of the zones of<br />
Jumeirah Village.<br />
E. Form. Addresses the location, size and design of all<br />
structures in the community.<br />
F. Parking. Establishes guidelines for provision, location,<br />
type and design of parking areas.<br />
G. Signs. Discusses permitted sign types by purpose,<br />
location, size, number, intent, and detail.<br />
H. Landscape and Fencing. Acknowledges the benefits of<br />
adding “green spaces” and screening to the community<br />
as a means of “softening” the built environment,<br />
improving aesthetics, and adding additional opportunities<br />
for recreation.<br />
I. Administration and Procedures. Provides the tools and<br />
processes needed to administer the Development <strong>Code</strong>.<br />
J. Definitions. Describes the various technical or specific<br />
terms found throughout the Development <strong>Code</strong>.<br />
K. Application Checklists. Ensure that appropriate and<br />
sufficient information is conveyed by the potential<br />
applicant to Jumeirah Village LLC when requesting to<br />
develop a site.
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
<br />
1. General Provisions<br />
Section 1.01. Title<br />
This Development <strong>Code</strong> is hereby officially known as the<br />
“Jumeirah Village - South Development <strong>Code</strong>”. References<br />
to “this <strong>Code</strong>” shall be interpreted as references to the<br />
Jumeirah Village Development <strong>Code</strong>.<br />
Section 1.02. Authorities<br />
1.02.01. Authority of Jumeirah Village LLC<br />
Jumeirah Village LLC is responsible for promoting and control<br />
of development of Jumeirah Village. As a result, Jumeirah<br />
Village LLC is granted the authority to establish regulations<br />
and guidelines to manage the use and development of all<br />
land, water and structures within the boundaries of Jumeirah<br />
Village. Jumeirah Village LLC shall have the right to approve<br />
or deny all applications for development within Jumeirah<br />
Village.<br />
In accordance with the recital on the property title, Jumeirah<br />
Village LLC has the authority to:<br />
A. Implement and ensure compliance with this <strong>Code</strong>.<br />
B. Appoint an authority or individual to review and approve<br />
or deny a Concept Plan, Site Plan or Building Permit.<br />
C. Amend and interpret this code, as needed.<br />
D. Establish and enforce additional rules, guides and<br />
requirements, as determined to be appropriate.<br />
1.02.02. Authority of Other Entities<br />
Nothing in this <strong>Code</strong> relieves the developer or landowner<br />
from the responsibility to acquire all additional permits or<br />
approvals as needed for site development or construction<br />
in Jumeirah Village, including, but not limited to approval<br />
from Dubai Municipality (DM), Dubai Electricity and Water<br />
Authority (DEWA), Dubai Ports, Customs and Free Zone<br />
Corporation, and the Department of Civil Defence.<br />
Section 1.03. Purpose & Intent<br />
This <strong>Code</strong> is established for the purpose of promoting the<br />
public health, safety and general welfare of the present and<br />
future residents, employees and guests of Jumeirah Village<br />
and promoting safe, orderly and healthful development. The<br />
Master Plan for Jumeirah Village is the fundamental guide<br />
to all decisions made under this <strong>Code</strong>. This <strong>Code</strong> regulates<br />
development in order to achieve objectives of the plan that<br />
include, but are not limited to, the following:<br />
A. Implement the Block Guidelines established in the plan<br />
and defined in this <strong>Code</strong> that dictate the character and<br />
pattern of development of the area.<br />
B. Enhance safety from fire, panic, and other dangers.<br />
C. Promote health and general welfare;<br />
D. Provide adequate light and air;<br />
E. Prevent or minimize conflicts or negative impacts among<br />
adjacent land uses.<br />
F. Facilitate adequate provision of transportation, water,<br />
wastewater, parks and open spaces, other public<br />
facilities.<br />
G. Maintain property values by stabilizing expectations and<br />
ensuring predictability in development.<br />
H. Establish a process that effectively and fairly applies the<br />
regulations and standards of this <strong>Code</strong>.<br />
Section 1.04. Applicability<br />
The regulations established by this <strong>Code</strong> shall be considered<br />
minimum requirements for development as follows:<br />
A. No building, structure or land shall be used or reused<br />
and no building or structure shall be constructed,<br />
reconstructed, occupied, moved, or structurally altered<br />
unless in conformity with the appropriate regulations<br />
established within this <strong>Code</strong>.<br />
B. No part of a yard, open space, off-street parking or<br />
loading space necessary for compliance by a building<br />
or structure for purposes of meeting the regulations<br />
of this <strong>Code</strong> shall be likewise used by another building<br />
or structure for compliance unless such shared use of<br />
resources is permitted by this <strong>Code</strong> and approved by<br />
Jumeirah Village LLC.<br />
C. All landscaping, parking, and signs shall be expected<br />
to meet the requirements of this <strong>Code</strong>. Approval shall<br />
be granted by Jumeirah Village LLC before a sign may<br />
be constructed, altered or otherwise displayed within<br />
Jumeirah Village.<br />
D. Yards and lots shall not be reduced below dimensions<br />
and area requirements established in this <strong>Code</strong>.<br />
Likewise, no structure or building shall be permitted to<br />
exceed requirements regarding bulk standards.<br />
E. In the event that requirements of this <strong>Code</strong> conflict or<br />
compete with requirements of other lawfully adopted<br />
rules, regulations, ordinances, or resolutions, the most<br />
restrictive shall apply.<br />
Section 1.05. Amendments<br />
Jumeirah Village LLC shall have the authority to amend<br />
this <strong>Code</strong>, as needed. Amendments shall be completed in<br />
accordance with Section 9, Administration & Procedures of<br />
this <strong>Code</strong>.<br />
1.05.01. New Development<br />
New development taking place after amendment to the<br />
Development <strong>Code</strong> shall be expected to meet requirements<br />
of the <strong>Code</strong> as amended. Development shall be required to<br />
meet an amended <strong>Code</strong> if an application for approval has not<br />
been submitted or a submitted application has not received<br />
approval prior to adoption of the new code amendment.<br />
1.05.02. Existing Development<br />
Existing development, including development that is under<br />
construction or has received approval by Jumeirah Village<br />
LLC, shall be exempt from meeting requirements established<br />
by code amendments adopted following application<br />
approval. Improvements to existing development shall meet<br />
requirements as amended at the time of application for<br />
approval of said improvements.<br />
Section 1.06. Measuring System<br />
The Standard International (SI) system of measurement shall<br />
be considered the accepted and official measuring system<br />
for this <strong>Code</strong>. All applications, figures and other materials<br />
submitted for approval shall utilize the Standard International<br />
system.<br />
G E N E R A L P R O V I S I O N S
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
r e v i e w a u t h o r i t y<br />
2. Review Authority<br />
Section 2.01. General Authority<br />
2.01.01. Delegation of Authority<br />
As stated in Section 1.02.01, Authority of Jumeirah Village<br />
LLC, this section certifies that Jumeirah Village LLC is<br />
responsible for promoting and control of development of<br />
Jumeirah Village. As a result, Jumeirah Village LLC has the<br />
right to approve or deny all applications for development<br />
within Jumeirah Village. To assist in administration of these<br />
duties, Jumeirah Village LLC is authorized to delegate<br />
responsibilities, including but not limited to:<br />
A. Daily administration of this <strong>Code</strong>, the Master Plan for<br />
Jumeirah Village and other plans related to Jumeirah<br />
Village.<br />
B. Ability to receive, review, approve, request modification,<br />
or deny applications for development.<br />
C. Requests or decisions to amend or interpret this <strong>Code</strong>.<br />
D. Enforcement of the requirements established by this<br />
<strong>Code</strong>.<br />
2.01.02. Summary of Review Authority<br />
Jumeirah Village LLC hereby establishes a Jumeirah Village<br />
Development <strong>Code</strong> Administrator and a Development Review<br />
Board (DRB) for the purpose of administering the majority<br />
of activity related to this <strong>Code</strong>. Table 2.01, Roles and Duties,<br />
summarizes the purpose of each entity.<br />
2.01.03. Conformity with Development <strong>Code</strong><br />
No employee of Jumeirah Village LLC granted authority by<br />
this <strong>Code</strong> may approve or issue a permit for a development<br />
application that does not meet the provisions of this <strong>Code</strong>.<br />
Any approval or permit issued in conflict with the provisions<br />
of this <strong>Code</strong> shall be considered null and void.<br />
2.01.04. Final Authority<br />
Jumeirah Village LLC reserves the right to final authority on<br />
all items related to promotion and control of development<br />
of Jumeirah Village. All decisions made by Jumeirah Village<br />
LLC, including appeals of decisions made by the Development<br />
<strong>Code</strong> Administrator or Development Review Board shall be<br />
considered final.<br />
Section 2.02. Development <strong>Code</strong> Administrator<br />
2.02.01. Designation<br />
Jumeirah Village LLC shall designate a Development <strong>Code</strong><br />
Administrator to maintain daily administration of affairs<br />
related to development activity in Jumeirah Village.<br />
2.02.02. General Development Application Duties<br />
As noted in Table 2.01, Roles and Duties, the Development<br />
<strong>Code</strong> Administrator shall accept, review, request<br />
modification, approve, or deny the following development<br />
applications based upon the requirements established by this<br />
<strong>Code</strong>:<br />
A. Concept Plan<br />
B. Site Plan<br />
C. Building Permit<br />
2.02.03. Staff Duties on Behalf of Development Review<br />
Board<br />
In addition to duties described in Section 2.02.02, the<br />
Development <strong>Code</strong> Administrator shall act as staff to the<br />
Development Review Board providing the following services:<br />
A. Accept, review, and recommend actions upon<br />
Development <strong>Code</strong> amendments, Zoning Map<br />
amendments, variances, exceptions, and conditional<br />
uses.<br />
B. Complete Findings of Fact for each decision reached by<br />
the Development Review Board.<br />
C. Respond to the applicant with Findings of Fact.<br />
2.02.04. Additional Duties<br />
Additional duties assigned to the Development <strong>Code</strong><br />
Administrator include:<br />
A. Conduct Pre-Application Meetings as needed with<br />
potential applicants prior to formal submission.<br />
B. Monitor and enforce the regulations established by this<br />
<strong>Code</strong>.<br />
C. Interpret the requirements of this <strong>Code</strong>.<br />
D. Prepare and amend any forms and application<br />
information to be utilized in the development review and<br />
approval process.<br />
Section 2.03. Development Review Board<br />
2.03.01. Designation<br />
Jumeirah Village LLC shall designate a Development Review<br />
Board (DRB) for purposes of approving or denying requests<br />
to vary from the requirements of this <strong>Code</strong>, amend the <strong>Code</strong><br />
or Zoning Map, or appeal a decision of the Development <strong>Code</strong><br />
Administrator.<br />
2.03.02. Appointment<br />
Jumeirah Village LLC shall appoint a panel consisting of no<br />
more than five members to serve on the Development Review<br />
Board. Three members of the DRB shall be regular members.<br />
Two additional members shall serve as alternates. Meetings<br />
of the DRB shall occur regularly on a basis that shall not<br />
exceed once a month unless approved by the three regular<br />
members of the DRB.<br />
2.03.03. Powers & Duties<br />
As noted in Table 2.01, Roles and Duties, the DRB shall be<br />
charged with the following activities:<br />
A. Review, approve and deny applications for Variances,<br />
Exceptions and Conditional Uses including the<br />
establishment of Findings of Fact.<br />
B. Approve or deny proposed amendments to the<br />
Development <strong>Code</strong> or the Zoning Map as requested by an<br />
applicant, Jumeirah Village LLC staff, the Development<br />
<strong>Code</strong> Administrator, or the DRB.<br />
C. Hear appeal of any decision made by the Development<br />
<strong>Code</strong> Administrator.
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
<br />
R E V I E W A U T H O R I T Y<br />
Table 2.01,<br />
Roles and Duties<br />
Role<br />
Jumeirah Village LLC Development <strong>Code</strong> Administrator Development Review Board (DRB)<br />
Final authority and administrator of<br />
responsibilities related to implementation<br />
and amendment of this Development<br />
<strong>Code</strong>. Delegates duties as necessary and<br />
hears appeals of any actions taken by the<br />
Development Review Board.<br />
Responsible for daily administration of<br />
the Development <strong>Code</strong> including the<br />
designated authority to make administrative<br />
decisions. Develops a report of review and<br />
recommendation regarding items sent to the<br />
Development Review Board.<br />
Responsible for approval or denial of items<br />
requiring possible variation or alteration of<br />
this <strong>Code</strong>. Appeals actions taken by the<br />
Development <strong>Code</strong> Administrator.<br />
Administrative Actions<br />
Concept Plan<br />
Site Plan<br />
Building Permit<br />
Amendments & Exceptions<br />
<strong>Code</strong> Amendment<br />
Zoning Map Amendment<br />
Variance<br />
Exception<br />
Conditional Use<br />
Other Duties<br />
Accepts Notice of Intent Questionnaire<br />
Conducts Pre-Application Meeting<br />
Administers and Accepts Applications for<br />
Development<br />
Reviews Applications for Completeness<br />
Develops Reports to the DRB and Jumeirah<br />
Village LLC<br />
Enforces Development <strong>Code</strong><br />
Interprets Development <strong>Code</strong><br />
Appointment and<br />
Pre-Qualification of Consultants<br />
Hears appeals of DRB decisions<br />
Hears appeals of DRB decisions<br />
Responsible for Approval<br />
or<br />
Denial<br />
Submits review and recommendations<br />
to DRB, completes DRB findings report,<br />
and responds to applicant<br />
Hears appeals of Administrator’s decisions<br />
Responsible for Approval or<br />
Denial with Findings of Fact<br />
Hears appeals of DRB decisions Responsible Party Hears appeals of Administrator’s decisions<br />
Approves Consultants for Service Accepts applications and maintains register --
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
Z o n e s<br />
3. Zones<br />
Section 3.01. Establishment of Zones<br />
For the purposes of this <strong>Code</strong>, the site is divided among seven<br />
zones, as shown in Table 3.01, General Zone Information.<br />
Section 3.02. Official Zoning Map<br />
3.02.01 Location and Changes<br />
A. Jumeirah Village is divided into zones as noted and<br />
maintained by the Official Zoning Map, hereafter referred<br />
to as the Zoning Map. The Zoning Map, maintained in the<br />
offices of Jumeirah Village LLC, is considered a part of<br />
this Development <strong>Code</strong>.<br />
B. Any zoning changes shall be recorded on the Zoning<br />
Map by Jumeirah Village LLC and each change shall be<br />
registered on the map with a number and note indicating<br />
the change.<br />
C. No change shall be made to the Zoning Map except<br />
in conformity with requirements of this <strong>Code</strong>. Any<br />
unauthorized change shall be null and void and have no<br />
force or effect.<br />
D. The Zoning Map shall be the final authority regarding<br />
zone boundaries.<br />
Section 3.03. Interpretation of Boundaries<br />
In the event of uncertainty regarding the precise location of<br />
boundaries, the following guidelines shall apply:<br />
A. Boundaries approximately following the center line<br />
of streets or alleys shall be considered to follow such<br />
center lines.<br />
B. Boundaries approximately following lot lines shall be<br />
considered to follow such lot lines.<br />
C. Boundaries parallel to rights-of-way shall be considered<br />
to follow such rights-of-way.<br />
D. In all variances other than those listed above, Jumeirah<br />
Village LLC shall make a written interpretation of zone<br />
boundaries.<br />
Section 3.04. Uniform Application of Zones<br />
No building, structure, or land shall be used or occupied,<br />
and no building or structure shall be erected, constructed or<br />
reconstructed except in conformity with this <strong>Code</strong>.<br />
3.02.02 Digital Map<br />
Jumeirah Village LLC may publish duplicate versions of the<br />
Zoning Map or utilize a digital mapping system to maintain the<br />
Zoning Map without diluting the final authority of the physical<br />
Zoning Map available in the offices of Jumeirah Village LLC.
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
<br />
Z o n e s<br />
Table 3.01,<br />
General<br />
Zone<br />
Information<br />
Description<br />
Function<br />
• Lowest density<br />
residential areas offer<br />
a suburban feel with<br />
proximity to urban<br />
services.<br />
• Structures are single<br />
family, detached homes<br />
surrounded by a private<br />
yard.<br />
• Mix of uses is minimal<br />
with commercial activity<br />
limited to home offices.<br />
• Located primarily in<br />
southern “triangle” portion<br />
of the site and far right<br />
corner of the “circle.”<br />
• Low density residential<br />
use offers a compromise<br />
between suburban single<br />
family villas and multifamily<br />
living.<br />
• Structures are flexible in<br />
use - allowing single family<br />
attached townhomes<br />
with limited front and rear<br />
yards, as well as apartment<br />
flats.<br />
• Mix of uses is minimal<br />
with commercial activity<br />
limited to home offices.<br />
• Located throughout the<br />
site and creatively used to<br />
surround range of medium<br />
and high density activities.<br />
• Variety of Medium<br />
density residential building<br />
surrounded by other Mid-<br />
Rises and flex units.<br />
• Structures are medium<br />
to high range in height,<br />
multifamily buildings with<br />
an attached carpark.<br />
• Open spaces are<br />
incidental with the<br />
exception of optional roof<br />
gardens.<br />
• Use for Mid-Rise G+4<br />
is primarily residential<br />
with ground floor retail<br />
activity possible. Mix use<br />
is allowed for G+10 &<br />
G+16 with retail possible<br />
on Ground & First Floors<br />
and Commercial on First,<br />
Second & Third Floors.<br />
Most institutional uses are<br />
permitted by right.<br />
• Located throughout<br />
the “circle” portion of the<br />
site along and within the<br />
major roadways and in<br />
the “triangle” portion of<br />
the site adjacent to tower<br />
parcels.<br />
• High density units in 3<br />
configurations and heights:<br />
Gateway Tower, Boulevard<br />
Tower and Pre-sold Tower.<br />
• Multifamily skyscrapers<br />
of varying heights with<br />
attached an above/below<br />
ground carpark.<br />
• Open spaces are<br />
incidental with the<br />
exception of optional roof<br />
gardens.<br />
• Located along major<br />
roadway connecting Town<br />
Center within the site and<br />
surrounding arterials.<br />
• Use is primarily<br />
residential, but maybe a<br />
mix of residential, retail (on<br />
Ground & First Floor), and<br />
commercial (on Second &<br />
Third Floors).<br />
• For Presold Towers,<br />
commercial use is<br />
permitted.<br />
• High density, mixed-use<br />
units that create a series of<br />
dynamic, urban cores for<br />
Jumeirah Village.<br />
• Multi-unit skyscrapers<br />
of varying heights with<br />
an urban “podium” and<br />
an attached above/below<br />
ground carpark.<br />
• Open spaces may<br />
include plazas, urban<br />
greens and roof gardens.<br />
• Primarily a location for<br />
office use, although may<br />
be a mix of residential,<br />
office, hotel and retail.<br />
• Located in three specific<br />
areas of the project.<br />
• Allows hotel or office<br />
above retail.<br />
• Low density, commercial<br />
retail located within<br />
the large median of the<br />
“triangle” portion of the<br />
site and within each of the<br />
“circle” districts.<br />
• Structures are limited<br />
height and serve a portion<br />
of the commercial retail<br />
needs of the project.<br />
• The formal green spaces<br />
of the median surround<br />
this portion of the site with<br />
additional open space<br />
desirable, but optional.<br />
• Located within easy<br />
access of the majority of<br />
the “triangle” portion of<br />
the site, particularly by<br />
automobile.<br />
Live High High High High High None None<br />
Work Low Low Medium Medium High Medium Low<br />
Shop None None Low Medium High High Low<br />
Play Medium Medium Medium Low Low Low High<br />
• Large open spaces<br />
designed to provide<br />
recreation, gathering<br />
opportunities and civic<br />
services within walking<br />
distance.<br />
• Includes Village Centers<br />
as defined in Block<br />
Guidelines.<br />
• Structures are limited<br />
height and complimentary<br />
to the open space.<br />
• Primarily functions<br />
as active and passive<br />
recreation space, including<br />
a number of water<br />
features. Institutional<br />
uses are permitted by<br />
right, as well as limited<br />
neighborhood commercial<br />
activity.<br />
• Open space connects<br />
virtually all of Jumeirah<br />
Village..
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
Z o n e s<br />
Figure 3.01,<br />
Zoning Map<br />
“Triangle” Side<br />
“Circle” Side
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
<br />
4. Use<br />
u s e<br />
Section 4.01. Types of Use<br />
Use categories are listed in Tables 4.01a and 4.01b. The<br />
following serve as a key to the Land Use Tables and indicate<br />
treatment for each use according to Zone.<br />
4.01.01. Permitted Uses<br />
A “P” indicates that a specific use is permitted by right within<br />
the given Zone. Such uses must meet all other appropriate<br />
requirements of this <strong>Code</strong>.<br />
4.01.02. Conditional Uses<br />
A “C” indicates that a use is permitted provided that the<br />
project appropriately responds to additional criteria.<br />
Conditional uses must meet all other appropriate<br />
requirements of this <strong>Code</strong>.<br />
4.01.03. Accessory Uses<br />
An “A” indicates the use as accessory to the primary use on<br />
a given site. An Accessory Use is permitted by right assuming<br />
that additional requirements established in Section 4.04,<br />
Accessory Use or Structure, are met.<br />
4.01.04. Uses Not Allowed<br />
An “-“ indicates that a particular use is not permitted within a<br />
given Zone.<br />
Section 4.02. Use Categories<br />
4.02.01. Classification<br />
Use categories classify land uses and activities based<br />
upon a similar function, product or physical characteristics.<br />
Characteristics include the type and amount of activity, the<br />
type of customers or residents, how goods or services are<br />
sold or delivered, likely impact on surrounding properties, and<br />
site conditions.<br />
4.02.02. Determination of Use<br />
In the event that a use is not listed or classification is<br />
otherwise required, Jumeirah Village LLC shall classify the<br />
use as appropriate. Following are criteria for determining<br />
classification:<br />
A. Actual or Anticipated characteristics of the activity.<br />
B. Approximate size of site area or floor space.<br />
C. Amounts of sales and customer type generated.<br />
D. Number and character of employees.<br />
E. Hours of operation.<br />
F. Building and site arrangement.<br />
G. Vehicles used and parking requirements.<br />
H. Number of vehicle trips generated.<br />
I. Required signage.<br />
J. Advertisement of use.<br />
K. Likely impact on surrounding properties.<br />
L. Ability to operate independently of other activities on a<br />
site.<br />
Section 4.03. Conditional Use<br />
4.03.01. Criteria for Approval<br />
Approval of a use in a given Zone is conditional if the use can<br />
be made compatible assuming specific criteria have been<br />
met to address negative impacts upon the surrounding area.<br />
Following are variables for consideration of approval of a<br />
Conditional Use:<br />
A. Conformity and compatibility with the approved Master<br />
Plan for Jumeirah Village.<br />
B. The proposed Conditional Use will not adversely impact<br />
the surrounding area or the overall development of<br />
Jumeirah Village.<br />
C. The location, size, intensity, and accessibility of the use<br />
will not adversely impact the marketability of surrounding<br />
uses or reduce the anticipated standard of living.<br />
D. The size, floor, area, mass, and general appearance<br />
of the proposed structure are to be compatible with<br />
surrounding structures.<br />
E. Adjacent streets and utilities have sufficient capacity to<br />
meet infrastructure requirements of the Use.<br />
F. Access to the site is acceptable to Jumeirah Village LLC.<br />
G. Adequate parking will be available and in accordance<br />
with criteria established by this <strong>Code</strong>.<br />
H. Impacts such as night lighting and noise have been<br />
successfully addressed.<br />
4.03.02. Conditions<br />
Jumeirah Village LLC may place conditions upon approval of<br />
a Conditional Use Permit to reduce or mitigate impacts upon<br />
surrounding uses.<br />
4.03.03. Transferability<br />
Approval of a Conditional Use is not transferable to new<br />
tenants or operators.<br />
Section 4.04. Accessory Use or Structure<br />
4.04.01. Criteria<br />
A use or structure shall be considered an Accessory Use or<br />
Accessory Structure if it meets the following criteria:<br />
A. The use or structure is subordinate to or serves the<br />
primary use or principal structure.<br />
B. The use is subordinate in area, extent or purpose to the<br />
primary use.<br />
C. The use is located on the same lot as the primary use.<br />
D. The use is included in calculation of maximum lot<br />
coverage.<br />
4.04.02 Permitted Accessory Uses<br />
Following are permitted Accessory Uses and Accessory<br />
Structures in Jumeirah Village:<br />
A. Home Office and Caretakers quarters as noted in Tables<br />
4.01a and 4.01b, as well as 4.04.04, Home Office of this<br />
Development <strong>Code</strong>.<br />
B. Storage structures not exceeding 10 percent of the<br />
maximum lot coverage and maintaining compatibility of<br />
scale, materials and design with the principal structure.<br />
C. Commercial or Institutional uses such as cafes or<br />
mosques for the exclusive use of employees associated<br />
with commercial or office use.<br />
D. Solar panels and similar features, awnings, canopies,<br />
carports, and other amenities attached or directly related<br />
to the primary structure.<br />
E. Trash or refuge storage and enclosures.<br />
F. Radio, television or other telecommunications antennas.<br />
G. Temporary uses associated with construction sites.<br />
4.04.03 Prohibited Accessory Uses<br />
The following uses are prohibited in Jumeirah Village:<br />
A. Open storage of loaded and unloaded vehicles.<br />
B. Open storage of materials, supplies or equipment.<br />
C. Outdoor display for sale of items such as automobiles,<br />
furniture, appliances or other large-scale materials.<br />
D. Raising, breeding, or keeping of dogs, cats, birds or other<br />
animals for sale, feeding or slaughter.<br />
4.04.04 Home Office<br />
A home office is permissible as a use in given Zones, as noted<br />
in Tables 4.01a and 4.01b, if it meets the following criteria:<br />
A. The home office is clearly incidental to the residential<br />
use of the dwelling.<br />
B. Business connected to the home office is conducted<br />
entirely within a residential structure.<br />
C. No outside storage of any kind is related to the home<br />
office.<br />
D. The residential character of the dwelling and the lot<br />
are not altered in any way to account for a home office,<br />
including additional parking, placement of a business<br />
related sign, or display of wares in a manner as to be<br />
visible to the outside.<br />
E. Deliveries by commercial vehicles occur only between<br />
8am and 6pm.<br />
F. The home office creates no disturbing or offensive noise,<br />
vibration, smoke, dust, odor, heat, glare, unhealthy or<br />
unsightly condition, traffic, or parking problem.<br />
G. The home office shall not result in the off-street or onstreet<br />
parking of more than two vehicles at any one time<br />
not owned by members of the occupant family.<br />
H. The business conducted within the home office does not<br />
involve retail sales or services.
10 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
u s e<br />
Table 4.01a,<br />
Permitted Land<br />
Uses: Residential<br />
& Institutional<br />
Residential<br />
Single Family Villa P - - - - - -<br />
Townhome - P - - - - -<br />
Multifamily Apartment - - P P P - -<br />
Home Office A A A A A - -<br />
Caretaker Dwelling A A - - - - -<br />
Cultural/Recreation<br />
Park or Open Space P P P P P P P<br />
Recreation Center C C C C C C P<br />
Play Area P P P P P P P<br />
Sports Fields C C - - C - P<br />
Institutional<br />
School C C - - P P P<br />
Mosque P P P P P P P<br />
Library/Cultural Center C - P - P P P<br />
Medical Facility - - P P P P P<br />
Hospital - - C C P - -<br />
Civil Defence - - P - P P P<br />
Fire Station - - P - P P P<br />
Police Station - - P - P P P<br />
Daycare/Nursery C - P - P P P<br />
Municipality Services - - P - P P P<br />
Post Office - - P - P P P<br />
Carpark Structure - - P P P P P
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
11<br />
u s e<br />
Table 4.01b,<br />
Permitted Land<br />
Uses: Commercial,<br />
Utility & Industrial<br />
Commercial<br />
Office, General - - C C P P -<br />
Eating Establishments<br />
Indoor Restaurant - - C P P P P<br />
Outdoor Cafe’ - - C P P P P<br />
Entertainment<br />
Indoor Entertainment - - - P P P C<br />
Outdoor Entertainment - - - P P P C<br />
Convenience Grocery - - C P P P P<br />
General Retail - - C P P P P<br />
Temporary Vendor - - - C P P P<br />
Serviced Apartments - - P P P P -<br />
Hotel - - - C P - -<br />
Boutique Hotel - - C C P - -<br />
Service Establishments<br />
General Sales - - - C P P -<br />
Personal Services - - C C P P -<br />
Repair Service - - - - C C -<br />
Gas Station - - - - - P -<br />
Utility and Communication<br />
Public Utility - - C C C C C<br />
Transmission Station - - C C C C C<br />
Waste Related Services - - - - C C C<br />
Industrial - - - - - - -
12 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
U s e<br />
4.04.05. Boutique Hotels<br />
Boutique Hotels may be considered for boulevard Mid Rise 1<br />
& Mid Rise 2 subject to approval by Jumeirah Village LLC.<br />
Boutique Hotels are Hotels with the maximum number of<br />
rooms= 150.<br />
Figure 4.01,<br />
District Overview<br />
4.04.06. Accessory Use Development Standards<br />
The following standards shall apply to all accessory<br />
structures:<br />
A. The combination of all structures on a property, including<br />
the primary structure and all accessory structures, shall<br />
not exceed any requirements established in 5.0, Form, for<br />
the given Zone.<br />
B. No accessory structure shall be constructed upon a<br />
property prior to completion of the primary structure.<br />
C. Fences and walls shall not be considered an accessory<br />
structure unless required to conceal an accessory use,<br />
in which case the fence or wall shall be of sufficient<br />
height to screen such use from public view, if required<br />
and shall be in accordance with Section 8.04, Fencing.<br />
4.04.07. School Sites<br />
A. The Total buildable area - not including parking<br />
structures, basements, balconies and rooftop mechanical<br />
enclosures - will be set at FAR 2.0. This area will be<br />
calculated to the exterior of all exterior wall enclosures<br />
and will include all service areas and elevator shafts and<br />
shall exclude substations and all service shafts.<br />
B. The maximum average floor plate area for school lots<br />
shall be 50% of lot area.<br />
C. The maximum allowable height is G+3<br />
Section 4.05. Temporary Use<br />
4.05.01. Permitted Temporary Uses<br />
Unless otherwise prohibited by this <strong>Code</strong>, the following<br />
temporary uses and structures may be permitted provided<br />
that they do not adversely affect surrounding properties nor<br />
disrupt the normal activity associated with Permitted Uses:<br />
A. Contractor’s office, construction equipment sheds and<br />
lay down areas, haul roads, access roads, burrow/fill<br />
sites and other construction related uses.<br />
B. A real estate office.<br />
C. A car park.<br />
4.05.02. Duration of Temporary Use<br />
A. A temporary use shall be granted for a maximum time<br />
duration of 24 months by Jumeirah Village LLC. An<br />
extension of time for continuance of a temporary use<br />
may be granted by Jumeirah Village LLC upon request<br />
and review.<br />
B. Within 30 days following expiration of the granted time<br />
duration, the lot shall be cleared of all debris and all<br />
temporary structures. A guaranty or signed contract with<br />
a disposal firm may be required as part of approval of any<br />
Temporary Use Permit.<br />
4.05.03. Temporary Use Development Standards<br />
The following standards shall apply to all temporary uses and<br />
structures, unless otherwise noted:<br />
A. Hours of operation shall be determined by Jumeirah<br />
Village LLC upon approval of the permit for the temporary<br />
use.<br />
B. Temporary sanitary facilities must be approved by<br />
Jumeirah Village LLC.<br />
C. Temporary uses shall meet all landscaping, fencing and<br />
sign requirements established for the given Zone.<br />
D. Parking for the temporary use may be required, including<br />
a stabilized drive to the parking area.<br />
4.05.04. Storage of Materials and Equipment<br />
No materials, supplies, tools, or equipment, including trucks<br />
and other vehicles of the developer, shall at any time be<br />
placed or stored in any area within Jumeirah Village. other<br />
than the specified lot. Storage shall occur inside a closed,<br />
temporary building, or behind a visual barrier or fence of<br />
such design and construction to screen such areas from<br />
public view in conformance with Section 8.04, Fencing.<br />
Such temporary structures, fences and visual barriers shall<br />
require approval by Jumeirah Village LLC and shall not<br />
extend over the designated boundary.
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
13<br />
5. Form <strong>Code</strong> – Mid-Rise Lots<br />
Table 5.02,<br />
Building<br />
Configuration<br />
& Size<br />
f o r m c o d e – M I D R I S E l o t s<br />
Zone <strong>Code</strong> MRH MRM MRA MRP<br />
FAR 8.0 8.0 3.0 2.5<br />
Average Floor Plate 50% of Parcel 75% of Parcel 65% of Parcel 50% of Parcel<br />
Ground Retail FAR 0.15 0.15 0.1 0<br />
First Floor Retail FAR 0.15 0.15 0 0<br />
First, Second, Third<br />
Floor commercial<br />
FAR<br />
1.0 1.0 0 0<br />
Maximum Height G + 16 Stories G + 10 Stories G + 4 Stories G + 4 Stories<br />
Upper Floor Setback at 16th Floor at 10th Floor at 5th Floor at 5th Floor<br />
The Retail & Commercial FAR is included in total building FAR<br />
Figure 5.01,<br />
Mid-Rise and Boulevard Mid-Rise Buildings in the foreground<br />
Section 5.01. General<br />
5.01.01. Applicability<br />
Design requirements established in Section 5.0, Form shall be<br />
applicable to all sites and structures in the Boulevard Mid-<br />
Rise and Mid-Rise Zones unless specifically exempted by this<br />
<strong>Code</strong>.<br />
5.01.02. Relationship to Eight Principles and Master Plan<br />
Development requirements regarding urban form are<br />
incorporated into this <strong>Code</strong> as a means of implementing<br />
design criteria established in the Jumeirah Village Master<br />
Plan, ensuring a high quality of life and minimizing the<br />
opportunity for adverse impacts on the functionality of the<br />
community.<br />
5.01.03. Subdivision of Property<br />
Subject to the approval of Jumeirah Village (L.L.C), land in<br />
the Flex and Town Centre plots in Jumeirah Village may be<br />
subdivided if each of the lots created by the subdivision<br />
meets all requirements of this code for the zone in which<br />
they are located. Land subdivision of other plot types is not<br />
permitted.<br />
Section 5.02. Building Configuration and Size<br />
5.02.01. Building Elements<br />
Each type of mid-rise development shall comply with<br />
the configuration as stipulated in Table 5.02 Building<br />
Configuration & Size. The primary facade with main<br />
entrance should always be facing the primary street and<br />
any secondary entrance may front along secondary streets.<br />
Setbacks shall be provided at the street, alley and paseo<br />
edges.<br />
5.02.02. Maximum Built Up Area<br />
The total gross buildable area - not including parking<br />
structures, basements, balconies, and rooftop mechanical<br />
enclosures - will be set as per the FARs specified in Table<br />
5.02 Building Configuration and Size. This area will be<br />
calculated to the exterior of all wall enclosures and will<br />
include all service areas and elevator shafts and shall<br />
exclude substations and all service shafts. The table above<br />
also specifies maximum allowable FAR for any ground floor<br />
retail use within the buildings.<br />
5.02.03. Average Floor Plate<br />
A. The average floor plate area for buildings on various<br />
Mid-Rise lots is specifed in Table 5.02 Building<br />
Configuration & Size.<br />
B. The average floor plate area of all buildings will be<br />
calculated by dividing the total buildable area by the total<br />
number of floors.<br />
C. The average floor plate shall comprise of gross areas<br />
including but not limited to all living spaces, walls,<br />
service and core areas.<br />
5.02.04. Building Height<br />
A. The maximum height of various Mid-Rise structures shall<br />
be as per the Table 5.02 Building Configuration & Size.<br />
B. The calculation of the number of stories shall begin at<br />
ground level and include the ground floor, mezzanines, or<br />
any levels commonly considered a story. Penthouses for<br />
mechanical equipment and basements that are not more<br />
than 1m above grade are not included.<br />
C. Items not considered in calculation of height shall<br />
include architectural treatments, antennas, parapets,<br />
spires, domes and other such features to be approved by<br />
Jumeirah Village LLC.<br />
D. The floor-to-floor dimension of each story shall be a<br />
minimum of 3m and a maximum of 5m. Any area of<br />
occupancy over 30 sqm shall be counted as a story.
14 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
f o r m c o d e – M I D R I S E l o t s<br />
Figure 5.02,<br />
Boulevard Mid-Rise 1 Typical Site Plan<br />
5.02.05. Orientation and Entry<br />
A. All street and paseo edges of the lot shall have occupied<br />
building frontage in the ratio prescribed for street<br />
setbacks in Section 5.03 and with the quantity of glazing<br />
prescribed in Section 5.04.02. The height of such frontage<br />
shall be a minimum of four stories.<br />
Figure 5.04,<br />
Boulevard Mid-Rise 1 Lot and Building View<br />
B. The primary façade and major building entries shall face<br />
the major street bordering the lot.<br />
C. In the case of lots with side streets or paseos the primary<br />
entries must face the primary street.<br />
D. In buildings with allowable ground floor retail, entries for<br />
residential and retail use shall be clearly identified using<br />
appropriate signages.<br />
5.02.06. Parking Location and Vehicle Access<br />
A. Parking parking is preferred below grade. A a parking structure<br />
shall be as follows:<br />
1. Boulevard Mid Rise 1 & 2:<br />
Figure 5.03,<br />
Boulevard Mid-Rise 2 Typical Site Plan<br />
A parking structure of no more than G g + 3 will be<br />
allowed above grade with setbacks of 13m from<br />
streets and paseos and zero setbacks from the side<br />
and rear shared parcel lines.<br />
2. Boulevard Mid Rise 3 & 4:<br />
A parking structure of no more than G + 1 will be<br />
allowed above grade with setbacks of 13m from<br />
streets and paseos and 5 m setbacks from the side<br />
parcel lines and alley parcel lines.<br />
Figure 5.05,<br />
Mid-Rise 2 Lot and Building View<br />
B. No parking structure may front on a Street or Paseo at<br />
the building’s ground level. The parking façade must have<br />
architectural treatments consistent with the occupied<br />
sections of the building.<br />
C. All curb cuts for access to parking shall be located<br />
along an alley when possible. When located along a<br />
street, curb cuts may not be located within 23m of an<br />
intersection and 3m of a property line.<br />
Section 5.03. Building Setbacks<br />
5.03.01 Street and Paseo<br />
A. For all street and Paseo conditions, all buildings shall
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
15<br />
Figure 5.06,<br />
Mid-Rise 3 Typical Site Plan<br />
front on a minimum of 80% of the length of lot line within<br />
2-4m of the property line.<br />
5.03.02. Shared Parcel Edges<br />
A. In the case of shared side and rear parcel lines, the<br />
lower stories of the structure below the required setback,<br />
may be built up to the property line.<br />
Figure 5.09,<br />
Mid-Rise 3 Lot & Building View<br />
f o r m c o d e – M I D R I S E l o t s<br />
5.03.03. Upper Story Setback<br />
A. If buildings are built to their maximum height, the setback<br />
requirements from Table 5.02 Building Configuration<br />
& Size will apply to the street, paseo or alley edges of<br />
building. The minimum setback for upper-most floors<br />
from builidng line shall be at least 3m. This setback shall<br />
be utilized as a balcony, with trellis and loggia treatments<br />
wherever possible.<br />
Section 5.04. Urban Design<br />
Figure 5.07,<br />
Mid-Rise 4 Typical Site Plan<br />
5.04.01. Ground Floor Treatment<br />
A. Any allowed ground floor retail use shall be located on<br />
all of the adjacent streets with its main entry from the<br />
primary street. This entry shall be cleary visible from the<br />
sidewalk.<br />
B. The residential Lobby and entryway shall be clearly<br />
visible from the sidewalk and any drop off area shall not<br />
isolate entry from the sidewalk.<br />
Figure 5.08,<br />
Mid-Rise 4 Lot and Building View<br />
C. Exterior building materials, particularly at the pedestrian<br />
level, should be selected with consideration given to use,<br />
durability and maintenance.<br />
5.04.02. Transparency<br />
A. Transparency shall constitute glass with less than 30<br />
percent reflectance. No mirror or highly colored glass is<br />
permitted.<br />
B. The percent of glazing of the façade shall be a minimum<br />
of 20% on the front and rear elevations.<br />
5.04.03. Open space<br />
A. Each parcel shall incorporate at least 150 sqm of open<br />
space. Such open space may be located on top of the<br />
car park structure, at grade, or on roof.
16 J u m e i r a h V i l l a g e S o u t h - M I D R I S E D e v e l o p m e n t C o d e<br />
J U M E I R A H V I L L A G E L L C<br />
f o r m c o d e – M I D R I S E l o t s<br />
Section 5.05. Architectural Treatments<br />
5.05.01. Horizontal/Vertical Articulation<br />
A. No building shall extend greater than 20m horizontally<br />
without a discernible vertical offset or change in<br />
elevation treatment.<br />
5.05.02. Mix of Permitted Materials<br />
A. In order to create unity at the street level, at least 50%<br />
of the non-glazed area of the facade shall be covered in<br />
limestone. The other materials utilized to cover facades<br />
shall be compatible in color and texture with limestone<br />
(such as stucco, cast stone or tile).<br />
5.05.03. Screening of Mechanical Equipment and Parking<br />
A. Mechanical equipment, to the extent possible should<br />
be placed on the roof of any structure. Mechanical<br />
equipment located on a roof shall be screened through<br />
development of a “top” for the structure.<br />
B. Mechanical equipment that must be located below the<br />
roof and car park structures should be located to the side<br />
or rear of a structure and designed to be architecturally<br />
compatible with the remainder of the structure including<br />
incorporation of appropriate materials to assist in<br />
screening.<br />
5.05.04. Color<br />
The color palette selected by applicant shall be generally<br />
compatible with limestone as well as the colors of<br />
surrounding development, with the rear and side of the<br />
primary structure completed in a color compatible with the<br />
front façade.<br />
5.05.05. Lighting<br />
A. Lighting designed to illuminate any or all of a site shall<br />
be fully concealed to avoid direct visibility from a street<br />
right-of-way and shall be designed to avoid unreasonable<br />
encroachment of light upon surrounding sites.<br />
B. Commercial parking, loading and staging areas shall<br />
be expected to incorporate lighting during evening<br />
operation.<br />
C. Lighting shall be provided at all entry and exit points<br />
of structures as well as locations throughout the site<br />
in which it is determined by Jumeirah Village LLC that<br />
safety may be compromised.<br />
D. Roof lighting shall be permissible following approval by<br />
Jumeirah Village LLC.<br />
5.05.06. Balconies<br />
A. Balconies may be counted as part of the multi-family<br />
open space requirement. There is no requirement that all<br />
or even any balconies be provided.<br />
B. Balconies should be well integrated into the façade<br />
composition, and may not appear as boxes that protrude<br />
from the side of the building. Devices that help integrate<br />
balconies include: partially or fully recessing the balcony<br />
into the façade, placing the balcony at an inside corner<br />
of the building, and placing the balcony on the roof of a<br />
lower floor where the building steps back.<br />
C . Balconies are meant to be fully or partially exterior<br />
places, not a bonus room that does not count towards<br />
the allowed floor area of the building. To protect this<br />
and the views from other units, balconies may not be<br />
glassed-in or have opaque wall surfaces except as<br />
allowed in this section.<br />
D. Openwork structures (such as trellises) and plantings<br />
are encouraged, but must not block more than 30% of<br />
the façade area they occupy on any side that protrudes<br />
beyond the building face.<br />
E. The following strictures apply to balconies:<br />
1. Balconies may extend up to 2m from the building<br />
face.<br />
2. Balconies may protrude into a setback or public<br />
right-of-way up to 1m.<br />
3. Balconies may be fully enclosed up to 1.1m above<br />
floor height (i.e. railing height.)<br />
4. Opaque walls above 1.1m are allowed only when<br />
balconies of different units are physically joined<br />
together. In this case the opaque wall may not be<br />
higher than 2m above floor height<br />
5.05.07. Roofscape<br />
A. Any mechanicals on the exterior, such as air handling<br />
units and communications antennae / dishes shall be<br />
roof-mounted and screened from sight from public space<br />
and other buildings within suitable enclosure areas.<br />
If screening areas are mounted atop roofs of lower<br />
portions of a building, care should be taken to minimize<br />
the visual impact from higher floors.<br />
B. With the exception of parapets along facades and<br />
feature accents such as domes and trellises, rooftops<br />
shall be flat.
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
17<br />
pa r k i n g a n d l o a d i n g<br />
6. Parking and Loading<br />
Section 6.01. Purpose and Type<br />
Parking and loading requirements are established as part<br />
of this <strong>Code</strong> to ensure that all activities in Jumeirah Village<br />
are provided adequate and reasonable parking and loading<br />
facilities to meet the needs of structures and uses.<br />
6.01.01. On Street Parking<br />
On street parking is strongly encouraged throughout<br />
Jumeirah Village as a flexible, efficient parking option. On<br />
street parking shall be permitted along all streets throughout<br />
Jumeirah Village, except in the instance that a frontage road<br />
accompanies a street, parking shall only occur along the<br />
frontage road.<br />
A. On street parking located adjacent to the front lot line of<br />
a lot shall be included in meeting parking requirements<br />
for that particular lot.<br />
B. All on street parking shall be designed as parallel<br />
parking. No diagonal parking is permitted along local and<br />
primary streets of Jumeirah Village.<br />
C. On street parking shall have a minimum length of 7m and<br />
a minimum width of 2.5m unless otherwise dictated by<br />
Jumeirah Village LLC.<br />
6.01.02. Parking Types<br />
Opportunities for parking shall be classified in four categories<br />
as follows:<br />
A. On street parking. Permitted in all Zones throughout<br />
Jumeirah Village.<br />
B. Driveway/Carpark. Parking exclusive to Villa and<br />
Townhome Zones appropriate to low density, limited use<br />
activities.<br />
C. Carpark Structure. Appropriate to areas with high density<br />
or a desire to preserve space. Carpark structures are<br />
restricted by location, design and appearance. Ability to<br />
place parking below grade, improves the efficiency of<br />
carpark structures.<br />
D. Open Lot. Paved, marked, open area adjacent to a<br />
structure. An open lot is considered an inefficient system<br />
of parking appropriate only in areas with significant<br />
traffic, but limited density.<br />
6.01.03. Parking by Zone<br />
Parking type is determined to have an impact upon the visual<br />
character and overall efficiency of a lot or block. Table 6.01,<br />
General Parking Requirements indicates the type of parking<br />
permitted in each Zone. A “P” indicates that the specific type<br />
of parking is permitted within the given Zone.<br />
Section 6.02. General Provisions<br />
6.02.01. Location of Parking<br />
A. Location of parking in relationship to structures on a lot<br />
and the streetscape are regulated by Table 6.01, General<br />
Parking Requirements and guided by the guidelines<br />
related to parking in Design Principles.<br />
B. With the exception of on street parking and driveways<br />
permitted in the Villa Zone, all parking is to be screened<br />
from general view.<br />
6.02.02. Shared Parking<br />
Two or more structures or areas may share parking provided<br />
that all height, design and other criteria established within<br />
Section 6, Parking and Loading are met and approval is<br />
granted by Jumeirah Village LLC.<br />
6.3.03. Approval Required<br />
Parking and loading shall require approval by Jumeirah<br />
Village LLC prior to construction or use. No concept plan or<br />
site plan approval shall be granted if Jumeirah Village LLC is<br />
unable to determine that parking and loading areas meet the<br />
requirements of Section 6 of this <strong>Code</strong>.<br />
Section 6.03<br />
Space Requirements<br />
6.03.01. Number of Spaces<br />
Table 6.02, Parking Spaces Required, designates the minimum<br />
number of parking spaces necessary by type of land use.<br />
6.03.02. Bicycle Accommodations<br />
One bicycle rack shall be required for each 30 parking spaces<br />
of a specific use and shall count as one parking space.<br />
6.03.03. Calculating Space Requirements<br />
A. Those requirements including a square meter measure<br />
shall base measurements on gross floor area.<br />
B. In the event that calculations result in a fraction greater<br />
than one-half (.5), the number shall be rounded up to<br />
the next whole number. Otherwise, the number shall be<br />
rounded down.<br />
Section 6.04. Space and Lot Design<br />
6.04.01. Parking Space Size<br />
A. Parking spaces shall conform to the requirements<br />
established in Table 6.03, Parking Area Dimensions.<br />
B. Required parking spaces shall have minimum dimensions<br />
of not less than 2.5 meters in width and 5.5 meters in<br />
length.<br />
C. In parking areas with 20 or more parking spaces, up to<br />
15 percent may be designated as “small car” spaces<br />
with minimum dimensions of not less than 2.5 meters in<br />
width and 5 meters in length. Small car spaces should be<br />
grouped and identified for exclusive use of small cars.<br />
6.04.02. Parking and Drive Aisle Widths<br />
A. Parking and drive aisle widths adjoining off street parking<br />
must meet the minimum standards described in Table<br />
6.03, Parking Area Dimensions.<br />
B. End caps of parking aisles shall include a maximum<br />
radius of 4 meters.<br />
6.04.03. Access<br />
A. No parking space shall have direct access to a street<br />
except on street parking spaces. Off street parking<br />
spaces shall be accessible without backing into or<br />
otherwise entering a street.<br />
B. All off street parking areas shall be limited to one point<br />
of two-way operation access with the exception of<br />
those parking areas that exceed a total of 100 spaces, in<br />
which case two points of two-way operation access are<br />
permitted.<br />
6.04.04. Access Standards<br />
Access driveways for parking and loading shall meet the<br />
following design standards:<br />
A. Access for emergency vehicles and loading shall have a<br />
minimum vertical clearance of 5.5 meters.<br />
B. Curb cuts shall not be placed closer than 10 meters from<br />
a curb line intersection, measured from the nearest edge<br />
of the access driveway.<br />
C. Access driveways shall have a minimum width of<br />
3.75m for one-way operation or 6.0 meters for two-way<br />
operation.<br />
D. At no time shall the total width permitted for access<br />
exceed 30 percent of the total street frontage.<br />
6.04.05. Markings and Accessories<br />
A. Each required off-street parking space shall be<br />
individually identified by surface markings in accordance<br />
with adopted standards. Aisles and maneuvering areas<br />
shall also be clearly marked with directional and traffic<br />
information as determined necessary.<br />
B. Wheel stops or a continuous curb shall be provided<br />
along the boundary line of a parking area or within<br />
proximity to structures, pedestrian areas, or landscaping.<br />
C. Lighting shall be installed as needed for purposes of<br />
safety and shall be installed in a manner to prevent light<br />
from reaching beyond the intended area.<br />
6.04.06. Landscaping, Screening and Drainage<br />
D. Landscaping and fencing shall be provided in<br />
accordance with the requirements of Section 8,<br />
Landscape and Screening of this <strong>Code</strong>. Additional<br />
setbacks for parking areas may be required to meet<br />
landscaping and screening requirements.<br />
E. A carpark structure shall maintain the design theme of<br />
the adjacent structure, including a minimum standard of<br />
architectural detail and screening integrated into design<br />
of all parking or loading areas.<br />
F. Parking and loading areas shall be graded, paved with<br />
a material acceptable to Jumeirah Village LLC, drained,<br />
and maintained to avoid dust, erosion or excessive water<br />
flow.<br />
6.04.07. Vehicle Stacking Areas<br />
Vehicle stacking may be a consideration in “staging areas”<br />
such as schools, banks or parking areas for commercial retail<br />
or entertainment activities. In such instances, the following<br />
requirements shall apply:<br />
PA R K I N G A N D L O A D I N G
18 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
PA R K I N G A N D L O A D I N G<br />
Table 6.01,<br />
General Parking<br />
Requirements<br />
Type of Parking<br />
On Street (visitors only) P P P P P P P<br />
Driveway/Carpark P P - - - - -<br />
Carpark Structure - - P P P P P<br />
Open Lot - - - - - P P<br />
Added Requirements<br />
Permitted Height (in<br />
stories not including ground<br />
level)<br />
- - Mid Rise 1 & 2 (3 levels)<br />
Mid Rise 3 & 4 (1 level)<br />
Parking Limitations - - parking to be located<br />
to rear of site<br />
Visibility of Parking visible from local street visible from access<br />
street/alley<br />
not visible from<br />
primary street<br />
4 4 2 2<br />
no parking permitted<br />
on ground floor along<br />
primary street<br />
not visible from<br />
primary street<br />
no parking permitted<br />
on ground floor along<br />
primary street<br />
access point visible<br />
from primary street<br />
Location of Vehicle Access local street alley access street/alley access street/alley designated rear of block<br />
(see Design Principles)<br />
- -<br />
screened, but visible<br />
from primary street<br />
access street<br />
screened, but visible<br />
from primary street<br />
access street<br />
Location of Loading - - access street/alley access street/alley designated rear of block access street access street<br />
Visibility of Loading - - screened from alley screened from alley screened from rear<br />
of block<br />
Landscaped Deck<br />
(see Section 8)<br />
primary street<br />
- - Yes Yes Yes Yes -<br />
primary street
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
19<br />
A. Vehicle stacking areas must be provided on-site and may<br />
not impede on or off-site traffic movement.<br />
B. The number of vehicles to be considered in the vehicle<br />
stack shall be determined in coordination with Jumeirah<br />
Village LLC.<br />
PA R K I N G A N D L O A D I N G<br />
Section 6.05. Loading Areas<br />
6.05.01. Location of Loading Areas<br />
Loading areas shall be located beyond the view of the<br />
general public as determined in Table 6.01, General Parking<br />
Requirements.<br />
A. Bus and taxi pick up/drop off areas shall be permitted in<br />
areas visible to the general public.<br />
B. The right-of-way shall not be used as a location for<br />
general loading or unloading of goods and services. No<br />
part of any vehicle shall be permitted to extend into a<br />
local or primary street during loading or unloading.<br />
6.05.02. Typical Space Requirements<br />
A. Loading spaces shall have a minimum width of 3<br />
meters and a length of 12 meters, exclusive of aisle and<br />
maneuvering space.<br />
B. Loading spaces shall have a minimum vertical clearance<br />
of 5.5 meters.<br />
C. Inside turning radius shall be a minimum of 9 meters.<br />
6.05.03. Semi-Trailer Space Requirements.<br />
A. Loading spaces shall have a minimum width of 3.5m<br />
and a length of 17m, exclusive of aisle and maneuvering<br />
space.<br />
B. Loading spaces shall have a minimum vertical clearance<br />
of 5.5m.<br />
C. Inside turning radius shall be a minimum of 12.5m.<br />
6.05.04. Design of Loading Areas<br />
Loading areas shall be screened from the view of the general<br />
public and designed to fit appropriately into the design theme<br />
of the surrounding structure.
20 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
PA R K I N G A N D L O A D I N G<br />
Table 6.02,<br />
On-Site Parking Spaces Required<br />
Use<br />
Residential<br />
Studio to 1 Bedroom Unit<br />
Space Requirement<br />
1 space per unit<br />
2 Bedroom Unit 1.5 space per unit<br />
3 Bedroom Unit 2 spaces per unit<br />
4 or More Bedroom Unit 3 spaces per unit<br />
Visitor Parking<br />
Cultural/Recreation<br />
Park or Open Space<br />
Recreation Center<br />
Play Area<br />
Sports Fields<br />
Institutional<br />
School<br />
1 space per 35 car spaces provided<br />
TBD<br />
TBD<br />
TBD<br />
TBD<br />
1 per classroom<br />
1 per 45 sq meter of administration area<br />
1 bus parking space per 3 classes<br />
Table 6.03,<br />
Parking Area Dimensions<br />
<br />
<br />
<br />
Mosque<br />
Library/Cultural Center<br />
Medical Facility<br />
Fire Station<br />
Daycare/Nursery<br />
Municipality Services<br />
Post Office<br />
Commercial<br />
Office, General<br />
Eating Establishments<br />
Entertainment<br />
Retail & Service<br />
Hotel/Boutique Hotel<br />
Staff<br />
Restaurants<br />
Utility/Communication<br />
Public Utility<br />
Waste Related Services<br />
TBD<br />
1 per 60 sq. meters<br />
1 per 60 sq. meters<br />
TBD<br />
1 per 60 sq. meters<br />
1 per 30 sq. meters<br />
1 per 30 sq. meters<br />
1 per 50 sq. meters + 10% for visitors<br />
1 per 25 sq. meters<br />
1 per 5 seats<br />
1 per 25 sq. meters of leasable space<br />
1 per 5 rooms<br />
1 for each hotel room containing kitchen<br />
1 per 2 hotel suits<br />
1 for each flat upto 150 sq meters floor area<br />
2 for each flat over 150 sq meters floor area<br />
1 per 2 employees<br />
1 per 45 sq. meters of restaurant area<br />
1 per 60 sq. meters of gross floor area<br />
1 per 60 sq. meters<br />
<br />
<br />
<br />
<br />
Parking Angle (in degrees) Parallel 45 60 75 90<br />
Stall Width (in meters) 2.7 2.7 2.7 2.7 2.5<br />
Stall Length (in meters) 7 7 7 7 5.0/ 5.5<br />
Aisle Width (in meters) 4 3.75 4.5 6 6<br />
Access Driveway Width (in meters) 6 6 6 6 6<br />
Overall Width (in meters) 9 16.5 18.1 18.75 17/ 18<br />
Turning radius (in meters) 4 4 4 4 4<br />
For further Parking requirements refer new JAFZA regulations
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
21<br />
s i g n s<br />
7. Signs<br />
S I G N S<br />
Section 7.01. General<br />
All signs erected, altered, displayed, or relocated in Jumeirah<br />
Village shall be constructed, maintained and removed<br />
according to the standards established by this <strong>Code</strong>.<br />
Section 7.01.01. Signs Permitted by Zone<br />
Table 7.01, Signs by Zone indicates sign classification by<br />
Zoning Zone according to type and purpose. A “P” indicates<br />
that a classification of sign is permitted by right within<br />
the given Zone. Permitted signs must meet all appropriate<br />
requirements of this <strong>Code</strong>.<br />
Section 7.01.02. Summary of Standards<br />
Tables 7.02, Sign Standards by Purpose provides a description<br />
of sign requirements permitted according to:<br />
A. total permitted sign area.<br />
B. maximum number.<br />
C. sign type.<br />
D. maximum height.<br />
E. lighting requirements.<br />
Section 7.01.03. Required Approval<br />
All temporary or permanent signs erected, altered, displayed<br />
or relocated in Jumeirah Village require approval from<br />
Jumeirah Village LLC in accordance with the development<br />
review process described in Section 9, Administration and<br />
Procedures.<br />
Table 7.01,<br />
Signs by Zone<br />
Zone<br />
Midrise P P P P P<br />
Tower P P P P P P<br />
Town Center P P P P P P<br />
Neighborhood Retail P P P P P<br />
Ramblas P P P P P<br />
Open Space P P P P P<br />
Purpose<br />
Identification P P P P P<br />
Information P P<br />
Advertisement<br />
P<br />
Section 7.01.04. Sign on Premise<br />
All signs in Jumeirah Village shall be located on the site for<br />
which information or advertisement is intended.<br />
Section 7.01.05. Exemptions<br />
The following signs are exempt from the requirements of this<br />
<strong>Code</strong>:<br />
A. Signs which are wholly within individual building<br />
enclosures and which can be viewed only by the<br />
occupants and visitors to that building.<br />
B. Traffic, parking, warning, danger, street name, utility<br />
marker, official signs and legal notices issued by<br />
Jumeirah Village LLC.<br />
C. Works of art that do not include a commercial message.<br />
D. Address plate incidental to sign regulations no greater<br />
than 0.3 square meters in total area.<br />
Section 7.02. Abandoned Signs<br />
All signs shall be removed within 60 calendar days of the date<br />
that the business, person or activity that the signs identifies<br />
or advertises ceases to operate on the site on which the sign<br />
is located.<br />
Section 7.03. Master Sign Plan<br />
A Master Sign Plan shall be submitted for all applications for<br />
development that include signs beyond those exempted in<br />
accordance with Section 7.01.05, Exemptions. The Master<br />
Sign Plan shall show the location of the proposed signs and<br />
detail dimensions, proposed color, material, and method of<br />
illumination.<br />
Section 7.04. Prohibited Signs<br />
No sign shall be erected, altered or displayed which:<br />
A. Moves, makes sounds, revolves or uses waving, blinking,<br />
flashing, vibrating, flickering or otherwise animated<br />
lighting.<br />
B. Constitutes a traffic hazard, by reasons of size, location,<br />
projection, content, color or manner of illumination.<br />
C. Is affixed to utility poles, trees, stones, bushes, other<br />
natural features or other signs.<br />
D. Obstructs light, air, ingress or egress from a required<br />
door, window or other opening.<br />
E. Is structurally unsafe or not kept in good repair or<br />
maintenance.<br />
F. Advertises a business or product no longer operated or<br />
sold.<br />
G. Projects more than 1 meter into the public right-of-way<br />
or within 1 meter of an adjacent street, as measured from<br />
the farthest projection of the sign.<br />
H. Obstructs neighboring signs or pedestrian traffic, either<br />
physically or visually.<br />
I. Is mounted on a roof.
22 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
S I G N S<br />
s i g n s<br />
Table 7.02,<br />
Sign Standards<br />
by Purpose<br />
Total Permitted Sign Area Maximum Number Sign Type<br />
Maximum<br />
Height of Sign<br />
Artificial<br />
Lighting<br />
Other Conditions<br />
Time Limit for Removal<br />
Permanent Signs<br />
Location or Tenant<br />
Identification<br />
1.5 sq. meter per linear meter of plot<br />
frontage (excepting tower sign)<br />
As approved by Jumeirah<br />
Village LLC<br />
As approved by Jumeirah<br />
Village LLC<br />
As approved by Jumeirah<br />
Village LLC<br />
Directional/Informational 0.1% of lot area As approved by Jumeirah<br />
Village LLC<br />
Canopy<br />
canopy height<br />
Projecting 4 meters internal or<br />
external<br />
Wall 3 meters internal or<br />
external<br />
1 per plot Tower 2 meters below<br />
top of upper<br />
shaft<br />
Pedestal<br />
Wall<br />
3.5 meters<br />
2.5 meters<br />
internal or<br />
external<br />
As approved<br />
by Jumeirah<br />
Village LLC<br />
Advertisement 3 sq. meter Window 3.0 meters none --<br />
Temporary Signs<br />
Real Estate<br />
Special Event or Sale<br />
Contractor Advertisement<br />
Future Facility Advertisement<br />
1 sq. meter in Villa and Townhome Zones &<br />
0.5% of lot area in other Zones up to 4 sq.<br />
meters<br />
minimum of 1 sq. meter or 0.5% of lot area<br />
up to 3 sq. meters<br />
1 sq. meter in Villa and Townhome Zones<br />
& 0.5% of lot area in other Zones up to 10<br />
sq. meters<br />
1 sq. meter in Villa and Townhome Zones &<br />
0.1% of lot area in other Zones up to 6 sq.<br />
meters<br />
1 per street frontage Pedestal, Wall or<br />
Window<br />
2 per street frontage Pedestal, Wall or<br />
Window<br />
1 per lot Ground, Pedastal,<br />
Wall, or Window<br />
1 per street frontage Ground, Pedastal,<br />
Wall, or Window<br />
Minimum 3 square meters of total sign area reserved for<br />
each ground floor business<br />
4 sq. meter per linear meter of building frontage, not to<br />
exceed 200 sq. meters<br />
No advertising message permitted<br />
Within 60 days from date that<br />
business ceases operation at<br />
the site of the sign<br />
2 meters -- Advertise only the site on which sign is located On or before closing date of sale<br />
3 meters -- Include only the name, date, time and content of event 14 days prior and 2 days after<br />
the sale or event<br />
4 meters front light<br />
external<br />
4 meters front light<br />
external<br />
Advertise only information related to the consultants<br />
licensed to work on the project including name, address,<br />
phone number, and internet web site. Sign to be sufficiently<br />
durable to remain in a high quality condition through its use<br />
on location.<br />
Advertise only information related to the facilities and<br />
amenities to be located on the site including uses, size and<br />
date of availability. May advertise a project contact for<br />
additional information including an address, phone number,<br />
and internet web site. Sign to be sufficiently durable<br />
to remain in a high quality condition through its use on<br />
location.<br />
10 days after issuance of<br />
Certificate of Occupancy<br />
10 days after issuance of<br />
Certificate of Occupancy
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
23<br />
s i g n s<br />
S I G N S<br />
J. Is Portable, except temporary A-frame signs.<br />
K. Contains strings of light not permanently mounted to a<br />
rigid background.<br />
L. Is Inflatable and tethered to balloons greater than 50cm<br />
in diameter.<br />
M. Is an electronic message center in fixed or traveling<br />
mode.<br />
Section 7.05. Lighting<br />
Sign lighting shall be arranged and maintained so that the<br />
source is not directly visible from a public right-of-way or<br />
adjacent property. Artificial lighting is allowed as permitted in<br />
Table 7.02, Sign Standards by Purpose.<br />
Section 7.06. Maintenance<br />
Each applicant that receives approval for a sign in Jumeirah<br />
Village shall be responsible for maintaining such sign in a<br />
secure and safe condition. If Jumeirah Village LLC is of the<br />
opinion that a sign is not secure, safe or in good state of<br />
repair or maintenance, such sign shall be considered to be in<br />
a violation of this <strong>Code</strong> and enforcement proceedings shall be<br />
commenced.<br />
Section 7.07. Language<br />
The content of all signs shall be displayed in both Arabic and<br />
English, with equivalent translations of all sign content.<br />
Section 7.08. Dimensions<br />
7.08.01. Computation of Area of Individual Signs<br />
A. The area of a sign shall be computed as the entire<br />
advertising area of the sign, including any framing or<br />
trim used to differentiate a sign face from the structure<br />
against which a sign face is placed.<br />
B. Where a sign consists of individual letters, words or<br />
symbols attached to a surface, building, canopy, awning,<br />
or wall, the sign area shall be the area of the smallest<br />
rectangle which completely encompasses all letters,<br />
words or symbols and accompanying background of a<br />
color different than the natural color of the wall. Where<br />
such sign includes multiple words, each word located in<br />
the same plane shall be computed separately.<br />
7.08.02. Computation of Area of Multi-faced Signs<br />
The area for a sign with more than one face shall be<br />
computed by adding together the area of all sign faces<br />
visible from any one point. Two identical sign faces shall be<br />
computed as a single face under the following conditions:<br />
<br />
A. Sign faces are placed back to back so that both faces<br />
cannot be viewed from any point at the same time.<br />
B. Sign faces are substantially similar.<br />
Al Karaba Tailor<br />
7.08.03. Computation of Height<br />
The height of a sign shall be computed as the distance from<br />
ground level to the top of the highest attached component<br />
of the sign unless otherwise stated in Table 7.02, Signs<br />
Standards by Purpose.<br />
7.08.04. Computation of Maximum Total Permitted Sign Area<br />
and Maximum Number of Signs<br />
The permitted sum of the area of all individual signs and the<br />
total number of permitted signs shall be computed based on<br />
standards identified in Table 7.02, Sign Standards by Purpose.<br />
Section 7.09. Temporary Signs<br />
Specific signs may be located in Jumeirah Village on a<br />
temporary basis. Temporary signs shall be required to meet<br />
the sign area, maximum number, sign type, maximum height,<br />
lighting and time limit requirements established in Table 7.02,<br />
Sign Standards by Purpose. No site plan will be approved<br />
unless all proposed temporary signs conform to the standards<br />
stated in Table 7.03. Permitted temporary signs include those<br />
addressing:<br />
A. Real estate.<br />
B. A special event or sale, including A-frame signs.<br />
C. Contractor advertisement.<br />
D. Future facility advertisement.<br />
Al Karaba Bakery<br />
Figure 7.02,<br />
General Sign Measurements<br />
C<br />
A<br />
F<br />
E<br />
two sign<br />
faces count<br />
as one<br />
width<br />
length<br />
height<br />
C. Sign faces are part of the same sign structure.<br />
Sale<br />
3 Dhs.
24 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
L A N D S C A P E A N D F E N C I N G<br />
8. Landscape and Fencing<br />
Section 8.01. General<br />
8.01.01. Purpose<br />
Landscaping and fencing regulations are established as<br />
part of this <strong>Code</strong> to encourage pleasant and attractive<br />
surroundings and to contribute to the relief of heat, noise,<br />
dust and glare through the proper placement of plants and<br />
fences and to provide for the needs of security and privacy.<br />
8.01.02. General Standards<br />
Table 8.01, Landscape and Fencing Standards provides<br />
a general list of landscape and fencing requirements<br />
associated with this <strong>Code</strong>.<br />
8.01.03. Irrigation and Maintenance<br />
A. Required landscape areas shall be provided with a fixed<br />
and permanent irrigation system for planted areas,<br />
protected by adequate back flow prevention, designed<br />
and installed in accordance with the following general<br />
provisions:<br />
1. Water conservation shall be accomplished in<br />
manually operated (hose-bib) system by the<br />
installation of flow limiting devices.<br />
2. Applicable codes shall be used for the design and<br />
installation of automatic control systems.<br />
B. In all Zones, required landscaped areas shall be<br />
permanently maintained including the proper pruning,<br />
weeding and removal of litter, fertilizing and replacement<br />
of plants when necessary.<br />
C. To minimize problems created by blowing sand and dust<br />
all ground planes in the exterior areas of parcels shall be<br />
treated so that there is no bare ground. Pavement, stone<br />
mulch or groundcovers are acceptable means of treating<br />
the earth.<br />
8.01.04. Safety<br />
No landscaping shall be permitted that endangers health or<br />
public safety by creating a traffic or fire hazard, obstructing<br />
vision, or detracts from the use of surrounding property.<br />
8.01.05. Landscape Plan Requirement<br />
As part of any application for Concept Plan and Site Plan<br />
approval, a Landscape Plan shall be submitted showing the<br />
proposed landscape development, irrigation system and<br />
fences. The Landscape Plan may be combined with other<br />
plans provided all proposed landscaping is adequately<br />
detailed on the plan.<br />
Section 8.02. Special Requirements by Zone<br />
8.02.01. Town Center and Tower Zone<br />
There are no special landscaping requirements in the Town<br />
Center and Tower Zones other than roof garden requirements.<br />
8.02.02. Neighborhood Retail Zone<br />
A. Vegetation utilized to meet the Open Lot landscaping<br />
requirement shall not be considered as all or part of the<br />
open space requirement.<br />
B. Open space is intended to be largely urban in nature and<br />
shall include 75 percent paved area. At least 50 percent<br />
of the paved area shall be shaded by buildings, trellises<br />
or shade trees.<br />
8.02.03. Mid-Rise Apartment Zone<br />
A. For each required Mid-Rise Apartment open space as<br />
described in Section 5.13, the following shall apply:<br />
1. Between 40 and 70 percent of the passive recreation<br />
areas shall be covered with a mix of paving<br />
materials including concrete, brick, block, stone,<br />
or pavers and a minimum of 50 percent of the<br />
paved area shall be shaded using a combination of<br />
buildings, trellises, vines, and shade trees.<br />
2. Each required open space shall have at least one<br />
water feature that covers a minimum of 1 square<br />
meter of area.<br />
B. Front yard open areas shall include a minimum of one<br />
shade tree for every 8 meters of open frontage.<br />
8.02.04 Villa and Townhome Zones<br />
Each lot in the Villa Zone shall have at least 3 trees in the<br />
front yard area, at least one of which shall be a shade tree.<br />
Each lot in the Townhome Zone shall have at least one shade<br />
tree in the front yard.<br />
8.02.05 Village Centers within the Open Space Zone<br />
A required courtyard or plaza within the Open Space Zone<br />
shall have a minimum of 75 percent paved area. At least<br />
50 percent of the paved area shall be shaded by buildings,<br />
trellises or shade trees.<br />
Section 8.03. Paseos and Roof Gardens<br />
In keeping with the Eight Principles guiding the design of<br />
Jumeirah Village, paseos and roof gardens are hereby<br />
incorporated into the community as a means of providing<br />
additional green space and recreational amenities.<br />
8.03.01. Paseos<br />
Each paseo shall be located in the Townhome Zone and<br />
designed to provide both paved and landscaped areas in a<br />
small, private court.<br />
A. Between 50 to 75 percent of the interior ground plane of<br />
a paseo shall be paved. The remaining area shall include<br />
a vegetative ground cover or stone mulch.<br />
B. A minimum of 50 percent of the paved area shall be<br />
covered in brick, stamped concrete, stone, unit pavers or<br />
other type of detailed, pedestrian scale paving material.<br />
C. A minimum of 8 shade trees shall be planted and<br />
maintained in a healthy growing condition in each paseo.<br />
D. Each Paseo shall have a minimum of one small scale<br />
water feature.<br />
8.03.02. Roof gardens.<br />
Roof gardens shall be required or encouraged in accordance<br />
with Table 8.02, Roof Gardens, and shall consist of a mix of<br />
paving, shade, water features, trees and shrubs as follows:<br />
A. Roof gardens shall be between 50 and 85 percent paved.<br />
B. A minimum of 50 percent of the paved area shall be<br />
covered in brick, stamped concrete, stone, unit pavers or<br />
other type of detailed, pedestrian scale paving material.<br />
At least 50 percent of the paved area shall be shaded<br />
with shade trees or vines on trellises.<br />
C. Unpaved areas shall be covered in plant material or<br />
stone mulch.<br />
D. Each roof garden shall have at least one water feature<br />
for every 2,500 square meters of pavement. Each water<br />
feature shall be at least 1 square meter in area.<br />
Section 8.04. Fencing<br />
8.04.01. Required Fences<br />
Fences shall be required as appropriate within each Zone as<br />
indicated in Table 8.01, Landscape and Fencing Standards.<br />
A. Each lot in the Villa Zone or Townhome Zone shall include<br />
a perimeter fence along the boundaries of the lot.<br />
B. Fences between properties in the Villa and Townhome<br />
Zones shall consist of a single, shared fence along the<br />
property line.<br />
C. Fences, including foundations, shall be placed entirely<br />
inside the lot or parcel to which they belong except in the<br />
instance of a single, shared fence along a property line.<br />
D. Fences shall be constructed of durable materials that<br />
are compatible with buildings on the same lot in terms<br />
of materials, finish, color and appearance. No fences of<br />
wood, plastic, or chain link shall be allowed.<br />
E. Fences shall be a uniform height of 2 meters, except as<br />
described in Section 8.04.02.<br />
8.04.02. Fence Types<br />
A fence may be classified as one of the following:<br />
A. Solid Fence. A solid fence shall be constructed of<br />
concrete block and stucco and have no openings larger<br />
than 100 cm in diameter or width or 300 cm tall. Solid<br />
fences may have a decorative cap of which no more than<br />
50 percent of the top may be 100 cm or less above or<br />
below the required uniform height.<br />
B. Half Fence. A semi-solid fence shall have a solid lower<br />
half constructed of concrete block and stucco, and upper<br />
half that is of open design, in which a physical separation<br />
shall be maintained between the two sides of the fence<br />
but the visual connection between the two sides shall<br />
remain. Alternately, a full vertical open section may be<br />
used, as long as the open design areas constitute at least<br />
1/3 of the total length of the fence, and no solid section is<br />
greater than 3 meters long.<br />
l a n d s c a p e a n d f e n c i n g
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
25<br />
l a n d s c a p e a n d f e n c i n g<br />
Table 8.01,<br />
Landscaping<br />
and Fencing<br />
L A N D S C A P E A N D F E N C I N G<br />
Front and Side Yard<br />
Solid Fence Yes Street edge of Paseo - - - - -<br />
Half Fence<br />
Yes<br />
Yes - - - -<br />
Facing on interior or paseo<br />
Open Fence Yes Yes - - - -<br />
No Fence - - Yes Yes Yes Yes Yes<br />
Rear Yard<br />
Solid Fence Yes - Facing Alley - - Optional -<br />
Half Fence - -<br />
- - - -<br />
Facing interior courtyard<br />
Open Fence - - - - - -<br />
or roof garden<br />
No Fence - Yes Yes Yes - Yes<br />
Alley Fence<br />
Solid Fence - Yes Yes - - Yes -<br />
No Fence Yes - - Yes Yes - Yes<br />
Loading Area Fence<br />
Solid Fence - - Yes Yes Yes Yes -<br />
No Fence Yes Yes - - - - Yes<br />
Vertical Front Yard Trellis and Vines<br />
Solid Fence Mandatory Mandatory Optional - - Optional -<br />
Other Fence Optional Optional Optional - - - -<br />
Horizontal Front Yard Trellis over Sidewalk<br />
Required Yes Yes Yes - - - -<br />
Not Required - - - Yes Yes Yes Yes<br />
Special Landscape<br />
Requirements**<br />
Front yard and ground<br />
plane<br />
* A half fence includes a solid lower half with an open top half<br />
** as described in the text of Section 8<br />
Interior of paseo Roof garden Roof garden Roof garden<br />
Plaza or Courtyard<br />
Landscaping<br />
Plaza or Courtyard for<br />
Village Center Clusters
26 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
L A N D S C A P E A N D F E N C I N G<br />
Table 8.02,<br />
Roof Gardens<br />
l a n d s c a p e a n d f e n c i n g<br />
Roof Garden Requirement*<br />
Podium - - 90% 80% 90% Optional Optional<br />
Lower Shaft - - 50% 50% 50% - -<br />
Middle Shaft - - 50% 30% 30% - -<br />
Upper Shaft to Top - - 50% Optional Optional - -<br />
Carpark Roof - - 75% 75% 90% Optional 100%**<br />
* percentage of available space at the specified level<br />
** if carpark is below ground<br />
C. Open Fence. An open design fence shall be constructed<br />
of wrought iron, aluminum or other acceptable material<br />
and shall maintain a physical separation between the<br />
two sides of the fence, but shall maintain open, visual<br />
contact between the two sides.<br />
Section 8.05. Parking Areas<br />
8.05.01. Required Landscaping in Open Lot<br />
A. A minimum of 5 percent of an Open Lot parking area with<br />
space for five or more vehicles shall be landscaped.<br />
B. There shall be one shade tree for every 25 cars in an<br />
Open Lot.<br />
8.05.02. Plan Requirement<br />
Placement of vegetation in any Open Lot shall be indicated on<br />
any Landscape Plan submitted for Concept Plan or Site Plan<br />
approval.
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
27<br />
a d m i n i s t r at i o n a n d p r o c e d u r e s<br />
9. Administration and Procedures<br />
Figure 9.01,<br />
Development Plan Process<br />
Pre-Application<br />
Meeting<br />
Concept Plan<br />
(Optional)<br />
Site Plan<br />
Application<br />
General discussion of the project<br />
with the applicant prior to a<br />
significant expenditure of resources.<br />
Administrator to determine if<br />
Concept Plan is needed.<br />
Allows for continued review and<br />
discussion between Adminstrator<br />
and Applicant. Level of required<br />
content is increased. Beneficial for<br />
complex projects.<br />
Detailed documentation of project<br />
and review by Administrator.<br />
Necessity of Variances or Exceptions<br />
is determined and addressed at this<br />
stage (if necessary).<br />
Building Permit<br />
Application<br />
To be granted upon review of final<br />
review of all construction documents<br />
and determination that all<br />
additional approvals (including EIA,<br />
if needed) have been met.<br />
Section 9.01. General<br />
9.01.01. Applications<br />
Jumeirah Village LLC shall utilize a series of applications<br />
and processes to ensure that development activity or<br />
other actions meet the overall goals of the Jumeirah<br />
Village - Master Plan and the specific requirements of the<br />
Development <strong>Code</strong>. The application process further serves as<br />
a tool for communication between the potential developer or<br />
applicant and Jumeirah Village LLC.<br />
9.01.02. General Development Plan Process<br />
A single development planning process, as shown in Figure<br />
9.01, Development Plan Process, shall be utilized by Jumeirah<br />
Village LLC in all development related activity in Jumeirah<br />
Village, including new construction or alteration of existing<br />
structures, signs, parking or other amenities.<br />
9.01.03. Simultaneous Submission of Applications<br />
A single development may require several applications prior<br />
to approval of a building permit. To increase efficiency, the<br />
Development <strong>Code</strong> Administrator may permit an applicant to<br />
submit applications for approval to the same development<br />
simultaneously, assuming that submissions continue to follow<br />
the sequence described in Figure 9.01. As an exception, an<br />
applicant may submit a request for a Variance, Exception or<br />
Conditional Use simultaneous with a Site Plan application<br />
if the need for such application is already known to the<br />
potential applicant and the Development <strong>Code</strong> Administrator.<br />
9.01.04. Prequalification of Consultants<br />
All engineering, architecture and allied professionals utilized<br />
in development of plans and implementation of the project<br />
must be licensed and registered by Jumeirah Village LLC<br />
to perform work in Jumeirah Village. Approval of specific<br />
consultants to be used for a project must occur prior to<br />
submission of a Concept Plan or Site Plan application.<br />
9.01.05. Application Checklists<br />
Application forms shall be provided by Jumeirah Village<br />
LLC for completion by any potential applicant. Application<br />
Checklists includes a list of items needed from an applicant<br />
as needed or appropriate.<br />
9.01.06. Additional Information<br />
The Development <strong>Code</strong> Administrator has the authority<br />
to waive information or to request additional information<br />
as appropriate throughout the process. Reasonable time<br />
required to obtain and provide additional information shall not<br />
be considered in meeting time requirements established by<br />
this <strong>Code</strong>.<br />
Section 9.02. Common Review Requirements<br />
9.02.01. Pre-Application Meeting<br />
Prior to submitting an application for consideration, a<br />
potential applicant must request and attend a Pre-Application<br />
Meeting with the Development <strong>Code</strong> Administrator. The<br />
purpose of the Pre-Application Meeting shall be to:<br />
A. Familiarize the applicant with Jumeirah Village LLC,<br />
Jumeirah Village, the Master Plan, the Development<br />
<strong>Code</strong>, and any other requirements. The Development<br />
<strong>Code</strong> Administrator shall ensure that the potential<br />
applicant is aware of the application process and<br />
the requirements that must be met to receive project<br />
approval.<br />
B. Allow the Development <strong>Code</strong> Administrator and potential<br />
applicant to discuss the potential project. Discussion is<br />
intended to ensure that applications for development<br />
are submitted in an efficient manner and that the final<br />
product best meets the vision of the Master Plan and the<br />
requirements of this <strong>Code</strong>.<br />
C. Determine the need for a Concept Plan. In making<br />
a determination between requiring a Concept Plan<br />
or permitting the applicant to apply for a Site Plan,<br />
the Development <strong>Code</strong> Administrator shall consider<br />
the complexity of the project, the need for additional<br />
information and other considerations as determined<br />
necessary. The applicant may also specifically request to<br />
submit a Concept Plan.<br />
D. Evaluate the need for additional approvals. If the<br />
Development <strong>Code</strong> Administrator determines that a<br />
proposed project will not meet the requirements of this<br />
<strong>Code</strong>, the applicant may prepare to request a Variance or<br />
Exception. As an alternative, the applicant may request<br />
an amendment to the Development <strong>Code</strong> or Zoning Map.<br />
Should the applicant opt to apply for an amendment to<br />
the Development <strong>Code</strong> or Zoning Map, approval shall<br />
be necessary prior to submitting a Concept Plan or Site<br />
Plan.<br />
9.02.02. Development Intent Questionnaire<br />
To request a Pre-Application Meeting, a potential<br />
applicant must complete and submit a Development Intent<br />
Questionnaire. The Questionnaire shall be based on the<br />
checklist included in Application Checklists and designed to<br />
provide the general information needed fulfill the purpose of<br />
the Pre-Application Meeting.<br />
9.02.03. Review for Completeness<br />
A. The Development <strong>Code</strong> Administrator is responsible for<br />
ensuring that each application is complete for review<br />
and consideration. Determination of Completeness shall<br />
be made within five working days of submission of any<br />
application.<br />
B. In the event that the Development <strong>Code</strong> Administrator<br />
determines that an application is incomplete, the<br />
applicant shall be notified and given a specific period<br />
of time (such as five working days) to resubmit the<br />
application. If, upon expiration of the specified time<br />
period, the applicant has not provided the requested<br />
information, the application shall be rejected.<br />
C. Determination that an application is complete shall not<br />
preclude the Development <strong>Code</strong> Administrator or the<br />
DRB from denying an application or requesting additional<br />
information, as needed.<br />
9.02.04. Appeals<br />
As noted in Section 2.01, Roles and Duties, an appeals<br />
process is established in the event that an applicant feels<br />
that denial was unjustified. All appeals of decisions rendered<br />
by the Development <strong>Code</strong> Administrator shall be forwarded<br />
to the DRB for review and consideration, including the<br />
reasons the applicant feels the denial was in error. Similarly,<br />
all decisions of the DRB, including appeals findings, will be<br />
reviewed and decided by Jumeirah Village LLC. As discussed,<br />
in Section 2, Review Authority, decision by Jumeirah Village<br />
LLC shall be final.<br />
A D M I N I S T R AT I O N A N D P R O C E D U R E S
28 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
A D M I N I S T R AT I O N A N D P R O C E D U R E S<br />
Figure 9.02,<br />
Pre-Application Review Process<br />
Pre-Application<br />
Meeting Stage<br />
Concept Plan<br />
Stage<br />
(Optional)<br />
Site Plan<br />
Stage<br />
Building Permit<br />
Stage<br />
Yes<br />
No<br />
Development Intent<br />
Application<br />
Submitted<br />
Review for<br />
Completeness<br />
Pre-Application<br />
Meeting Conducted<br />
Is a Concept Plan<br />
Needed?<br />
Section 9.03. Concept Plan<br />
9.03.01. Submission of Materials<br />
The applicant shall submit to Jumeirah Village LLC two sets of<br />
all design materials required in the Application Checklists as<br />
well as the Concept Plan Application.<br />
A. Generally, the Concept Plan shall conceptually show to<br />
scale property boundaries, approximate location and<br />
dimensions of all structures, setbacks, location and<br />
general information regarding signs, parking areas,<br />
entryways, topography, north orientation, a description of<br />
general bulk requirements, landscaping and schematic<br />
floor plans, and elevations of at least three sides of<br />
all structures. Specific requirements are provided in<br />
Application Checklists.<br />
B. An additional CAD file of the Concept Plan may be<br />
submitted as a supplement to required materials. If<br />
submitted, the CAD file should be in a format that is<br />
acceptable to Jumeirah Village LLC, including file format,<br />
separation of design elements into layers, and clean line<br />
work.<br />
C. A spreadsheet summary of all development data, in<br />
compliance with the requirements of this <strong>Code</strong> (such as<br />
lot area, built up area and parking provision).<br />
9.03.02. Plan Review Process<br />
A. The approval process shall follow the steps highlighted in<br />
Figure 9.03, Concept Plan Review Process and discussed<br />
throughout Section 9, Administration and Procedures.<br />
B. The Development <strong>Code</strong> Administrator shall review the<br />
application in its ability to meet the vision of the Jumeirah<br />
Village Master Plan and the requirements of this <strong>Code</strong>.<br />
If all requirements are met, the Development <strong>Code</strong><br />
Administrator shall approve the application. If additional<br />
information is needed, the Administrator shall request<br />
additional information.<br />
C. The Development <strong>Code</strong> Administrator shall notify the<br />
applicant of final action, including approval or denial of<br />
the application. One set of the plans marked as approved<br />
or denied shall be accompanied by a letter and returned<br />
to the applicant while the second set shall be similarly<br />
marked and retained by Jumeirah Village LLC.<br />
D. The Development <strong>Code</strong> Administrator reserves the right<br />
to approve a Concept Plan with conditions, assuming<br />
that such conditions serve to bring the project into<br />
compliance with this <strong>Code</strong>.<br />
E. If approval is conditional, the applicant may request a<br />
meeting with the Development <strong>Code</strong> Administrator to<br />
discuss the conditions and request reconsideration.<br />
Following further review, the Development <strong>Code</strong><br />
Administrator shall notify the applicant of revisions, if<br />
any, to the final action.<br />
9.03.03. Time<br />
A. The Development <strong>Code</strong> Administrator shall approve or<br />
deny a Concept Plan within 10 working days of receipt<br />
of the application and determination of completeness.<br />
Notification of approval or denial shall be made within<br />
5 working days of final action, for a total of 15 working<br />
days.<br />
B. Upon approval, the applicant shall have no more than<br />
3 months to submit a Site Plan application. Following 3<br />
months, a Concept Plan shall be considered expired. An<br />
extension of time may be granted by Jumeirah Village<br />
LLC upon request.<br />
C. If approval is conditional, the applicant shall be deemed<br />
to have agreed with all conditions unless, within 15<br />
working days, the applicant requests a meeting with the<br />
Development <strong>Code</strong> Administrator to review the decision.<br />
D. Within 15 working days of meeting the applicant to<br />
discuss the conditional approval, the Development <strong>Code</strong><br />
Administrator shall notify the applicant of revisions, if<br />
any, to the final action.<br />
Section 9.04. Site Plan<br />
9.04.01. Submission of Materials<br />
A. The applicant shall submit to Jumeirah Village LLC<br />
two sets of all design materials required in Application<br />
Checklists as well as the Site Plan Application.<br />
B. Generally, the Site Plan shall accurately show to scale<br />
property boundaries, location and dimensions of all<br />
structures, all building wall elevations and setbacks,<br />
parking areas, entryways, topography, north orientation,<br />
Figure 9.03,<br />
Concept Plan Review Process<br />
Pre-Application<br />
Meeting Stage<br />
Concept Plan<br />
Stage<br />
(Optional)<br />
Site Plan<br />
Stage<br />
Building Permit<br />
Stage<br />
Yes<br />
Yes with<br />
Conditions<br />
Concept Plan<br />
Application and<br />
Materials Submitted<br />
Review for<br />
Completeness<br />
Application Review<br />
Is More Information<br />
Needed?<br />
No<br />
Yes<br />
Is the Application<br />
Approved?<br />
No<br />
Letter of<br />
Rejection<br />
a d m i n i s t r at i o n a n d p r o c e d u r e s
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
29<br />
a d m i n i s t r at i o n a n d p r o c e d u r e s<br />
Figure 9.04,<br />
Site Plan Review Process<br />
Pre-Application<br />
Meeting Stage<br />
Concept Plan<br />
Stage<br />
(Optional)<br />
Site Plan<br />
Stage<br />
Building Permit<br />
Stage<br />
Yes<br />
Yes with<br />
Conditions<br />
Site Plan Application<br />
and Materials<br />
Submitted<br />
Review for<br />
Completeness and<br />
Modifications<br />
Application Review<br />
Is More Information<br />
Needed?<br />
No<br />
Yes<br />
Does the Project<br />
Require a Variance,<br />
Exception or<br />
Conditional Use?<br />
No<br />
Is the Application<br />
Approved?<br />
Yes<br />
No<br />
To DRB for<br />
Consideration<br />
Letter of<br />
Rejection<br />
a description of bulk details, and detailed floor plans.<br />
A master sign plan and a master landscape and open<br />
space plan, including irrigation, shall be incorporated<br />
into the Site Plan Application, Specific requirements are<br />
provided in Application Checklists.<br />
C. A CAD file of the Site Plan must be submitted. The CAD<br />
file should be in a format that is acceptable to Jumeirah<br />
Village LLC, including file format, separation of design<br />
elements into layers, and clean line work.<br />
9.04.02. Minor Modifications to Approved Concept Plan<br />
The applicant may be permitted to make minor modifications<br />
to the approved Concept Plan prior to Site Plan application.<br />
All said modifications should be noted for review by the<br />
Development <strong>Code</strong> Administrator.<br />
9.04.03. Plan Review Process<br />
A. The approval process shall follow the steps highlighted<br />
in Figure 9.03, Site Plan Review Process and discussed<br />
throughout Section 9, Administration and Procedures.<br />
B. The Development <strong>Code</strong> Administrator shall review the<br />
application in its ability to meet the vision of the Jumeirah<br />
Village - Master Plan and the requirements of this <strong>Code</strong>.<br />
If all requirements are met, the Development <strong>Code</strong><br />
Administrator shall approve the application. If additional<br />
information is needed, the Administrator shall request<br />
additional information.<br />
C. The Development <strong>Code</strong> Administrator shall determine<br />
if a request for variance or exception is warranted or if<br />
the project requires approval as a Conditional Use. If so,<br />
the Administrator will notify the applicant of the need<br />
for approval by the DRB prior to approval of a Building<br />
Permit.<br />
D. The Development <strong>Code</strong> Administrator shall notify the<br />
applicant of final action, including approval or denial of<br />
the application. One set of the plans marked as approved<br />
or denied shall be accompanied by a letter and returned<br />
to the applicant while the second set shall be similarly<br />
marked and retained by Jumeirah Village LLC.<br />
E. The Development <strong>Code</strong> Administrator shall provide<br />
the applicant with a list of various additional approvals<br />
and studies needed prior to Building Permit approval,<br />
including, if needed, completion of an Environmental<br />
Impact Assessment (EIA).<br />
F. The Development <strong>Code</strong> Administrator reserves the<br />
right to approve a Site Plan with conditions, assuming<br />
that such conditions serve to bring the project into<br />
compliance with this <strong>Code</strong>.<br />
G. If approval is conditional, the applicant may request a<br />
meeting with the Development <strong>Code</strong> Administrator to<br />
discuss the conditions and request reconsideration.<br />
Following further review, the Development <strong>Code</strong><br />
Administrator shall notify the applicant of revisions, if<br />
any, to the final action.<br />
9.04.04. Time<br />
A. The Development <strong>Code</strong> Administrator shall approve<br />
or deny a Site Plan within 15 working days of receipt<br />
of the application and determination of completeness.<br />
Notification of approval or denial shall be made within<br />
5 working days of final action, for a total of 20 working<br />
days.<br />
B. Upon approval, the applicant shall have no more than 3<br />
months to submit a Building Permit application. Following<br />
3 months, a Site Plan shall be considered expired. An<br />
extension of time may be granted by Jumeirah Village<br />
LLC upon request.<br />
C. If approval is conditional, the applicant shall be deemed<br />
to have agreed with all conditions unless, within 15<br />
working days, the applicant requests a meeting with the<br />
Development <strong>Code</strong> Administrator to review the decision.<br />
D. Within 15 working days of meeting the applicant to<br />
discuss the conditional approval, the Development <strong>Code</strong><br />
Administrator shall notify applicant of any revisions to the<br />
final action.<br />
Section 9.05. Building Permit<br />
9.05.01. Submission of Materials<br />
A. Generally, the Building Permit shall include final<br />
drawings and construction documents as needed to<br />
commence construction.<br />
B. The Building Permit application and all drawings will be<br />
A D M I N I S T R AT I O N A N D P R O C E D U R E S
30 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
A D M I N I S T R AT I O N A N D P R O C E D U R E S<br />
accompanied by approval of all additional applications<br />
and studies, including requirements for Variance,<br />
Exception or Conditional Use by the DRB.<br />
C. A CAD file of the Site Plan must be submitted as a<br />
component of required materials. The CAD file should be<br />
in a format that is acceptable to Jumeirah Village LLC,<br />
including file format, separation of design elements into<br />
layers, and clean line work.<br />
9.05.02. Minor Modifications to Approved Site Plan<br />
The applicant may be permitted to make minor modifications<br />
to the approved Site Plan prior to Building Permit application.<br />
All said modifications should be noted for review by the<br />
Development <strong>Code</strong> Administrator. The Development <strong>Code</strong><br />
Administrator reserves the right to determine that proposed<br />
changes are beyond “minor modifications” and reject such<br />
changes.<br />
9.05.03. Plan Review Process<br />
A. The approval process shall follow the steps highlighted<br />
in Figure 9.05, Building Permit Review Process and<br />
discussed throughout Section 9, Administration and<br />
Procedures.<br />
B. The Development <strong>Code</strong> Administrator shall conduct final<br />
review the application in its ability to meet the vision of<br />
the Jumeirah Village Master Plan and the requirements<br />
of this <strong>Code</strong>. If all requirements are met, the Development<br />
<strong>Code</strong> Administrator shall approve the application. If<br />
additional information is needed, the Administrator shall<br />
request additional information.<br />
C. The Development <strong>Code</strong> Administrator shall notify the<br />
applicant of final action, including approval or denial of<br />
the application. One set of the plans marked as approved<br />
or denied shall be accompanied by a letter and returned<br />
to the applicant while the second set shall be similarly<br />
marked and retained by Jumeirah Village LLC.<br />
D. Upon receipt of an approved Building Permit, the<br />
applicant may begin construction.<br />
9.05.04. Time<br />
A. The Development <strong>Code</strong> Administrator shall approve or<br />
deny a Building Permit within 15 working days of receipt<br />
of the application and determination of completeness.<br />
Notification of approval or denial shall be made within<br />
5 working days of final action, for a total of 20 working<br />
days.<br />
B. Upon approval, the applicant shall have no more than 3<br />
months to utilize an approved Building Permit. Following<br />
3 months, if the applicant has not initiated construction<br />
or is otherwise unable to prove progress, the Building<br />
Permit shall be considered expired. An extension of time<br />
may be granted by Jumeirah Village LLC upon request.<br />
Section 9.06. Variance<br />
9.06.01. Submission of Materials<br />
Generally, the application shall include all materials required<br />
to indicate the requested variance. If submitted as part of the<br />
Development Plan process, materials submitted for Site Plan<br />
review will largely be sufficient.<br />
9.06.02. General Criteria<br />
The Development Review Board may issue a variance from<br />
the requirements of the Development <strong>Code</strong> if such action is<br />
not contrary to the interest of residents, investors, employees,<br />
and guests of Jumeirah Village. The Development Review<br />
Board must also find that, due to special conditions, literal<br />
enforcement of the Development <strong>Code</strong> would result in undue<br />
and unnecessary hardship based upon the following criteria:<br />
A. Extraordinary conditions regarding the specific land<br />
involved are such that strict enforcement of this <strong>Code</strong><br />
would deprive the applicant of reasonable use of the<br />
land.<br />
B. The Variance would not be detrimental to the health,<br />
welfare, safety, morals, order, convenience, or prosperity<br />
of surrounding residents, investors, employees, and<br />
guests of Jumeirah Village.<br />
C. The conditions are unique to this site and do not apply to<br />
other locations found in the same Zone.<br />
D. The extraordinary conditions have not been created as a<br />
result of actions by the applicant.<br />
E. The Variance would be consistent with the spirit and<br />
intent of the Jumeirah Village Master Plan and this <strong>Code</strong>.<br />
F. Condition of the site and enforcement of this <strong>Code</strong> would<br />
prohibit or unreasonably restrict use of the land.<br />
Figure 9.05,<br />
Building Permit Review Process<br />
Pre-Application<br />
Meeting Stage<br />
Concept Plan<br />
Stage<br />
(Optional)<br />
Site Plan<br />
Stage<br />
Building Permit<br />
Stage<br />
Building Permit<br />
Application and<br />
Materials Submitted<br />
Review for<br />
Completeness and<br />
Modifications<br />
Application Review<br />
Is More Information<br />
Needed?<br />
No<br />
Yes<br />
Have all Additional<br />
Approvals been<br />
Obtained?<br />
Yes<br />
Is the Application<br />
Approved?<br />
No<br />
Yes<br />
No<br />
Letter of<br />
Rejection<br />
Building<br />
Permit<br />
Granted<br />
a d m i n i s t r at i o n a n d p r o c e d u r e s
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
31<br />
a d m i n i s t r at i o n a n d p r o c e d u r e s<br />
Figure 9.06,<br />
Development Review Board Process<br />
Pre-Application<br />
Meeting Stage<br />
Concept Plan<br />
Stage<br />
(Optional)<br />
Site Plan<br />
Stage<br />
Building Permit<br />
Stage<br />
Yes<br />
Yes with<br />
Conditions<br />
Variance, Exception<br />
or Conditional Use<br />
Application and<br />
Materials Submitted<br />
Review for<br />
Completeness<br />
Review Application<br />
and Generate Report<br />
for DRB<br />
Is More Information<br />
Needed?<br />
No<br />
Yes<br />
Does DRB Determine<br />
that Application<br />
Meets Criteria?<br />
No<br />
Yes<br />
Is the Application<br />
Approved?<br />
Letter of<br />
Rejection<br />
9.06.03. Variance Process<br />
A. The approval process shall follow the steps highlighted<br />
in Figure 9.06, Development Review Board Process and<br />
discussed throughout Section 9, Administration and<br />
Procedures.<br />
B. The Development <strong>Code</strong> Administrator shall complete a<br />
report to the Development Review Board including an<br />
overview of the request for Variance, a recommendation<br />
of approval or denial, and proposed findings of fact to<br />
support the recommendation.<br />
C. The Development Review Board shall consider the<br />
recommendation of the Development <strong>Code</strong> Administrator<br />
and determine final action, including approval or denial<br />
of the application and specific findings of fact.<br />
D. The Development <strong>Code</strong> Administrator shall notify the<br />
applicant in writing of final action, including approval or<br />
denial of the application.<br />
E. The Development Review Board reserves the right to<br />
approve a Variance with conditions, safeguards or<br />
restrictions as needed to address any adverse impacts<br />
resulting from the Variance.<br />
9.06.04. Time<br />
A. The Development <strong>Code</strong> Administrator shall submit<br />
a report to the Development Review Board within<br />
15 working days of receipt of the application and<br />
determination of completeness.<br />
B. The Development Review Board shall take final action<br />
on the application for Variance within 15 working days<br />
of receiving the report from the Development <strong>Code</strong><br />
Administrator. Notification of approval or denial shall be<br />
made within 5 working days of final action, for a total of<br />
20 working days.<br />
C. Upon approval of a building permit, the applicant shall<br />
have no more than 3 months to utilize an approved<br />
Variance. Following 3 months, if the applicant has not<br />
initiated construction or is otherwise unable to prove<br />
progress, the Variance shall be considered expired. An<br />
extension of time may be granted by Jumeirah Village<br />
LLC upon request.<br />
Section 9.07. Exception<br />
9.07.01. Submission of Materials<br />
Generally, the application shall include all materials required<br />
to indicate the requested exception. If submitted as part of<br />
the Development Plan process, materials submitted for Site<br />
Plan review will largely be sufficient.<br />
9.07.02. General Criteria<br />
The Development Review Board may issue an exception from<br />
the requirements of the Development <strong>Code</strong> if such action is<br />
not contrary to the interest of residents, investors, employees,<br />
and guests of Jumeirah Village. The Development Review<br />
Board must also find that special conditions proposed by<br />
the applicant, while not in compliance with all requirements<br />
of the Development <strong>Code</strong>, are more or equally appropriate<br />
toward meeting the spirit of the Master Plan and this <strong>Code</strong>.<br />
Approval of the exception shall be based upon the following<br />
criteria:<br />
A. The proposed project remains compatible with<br />
surrounding land uses and is not detrimental to the<br />
health, welfare, safety, morals, order, convenience,<br />
or prosperity of surrounding residents, investors,<br />
employees, and guests of Jumeirah Village.<br />
B. The proposed exception will provide an equal or greater<br />
means of meeting the purposes of this <strong>Code</strong> than literal<br />
enforcement of existing requirements.<br />
C. The extraordinary conditions proposed by the applicant<br />
are unique to the project or the site.<br />
D. The exception would be consistent with the spirit and<br />
intent of the Jumeirah Village Master Plan and this <strong>Code</strong>.<br />
9.07.03. Exception Process<br />
A. The approval process shall follow the steps highlighted<br />
in Figure 9.06, Development Review Board Process and<br />
discussed throughout Section 9, Administration and<br />
Procedures.<br />
B. The Development <strong>Code</strong> Administrator shall complete a<br />
report to the Development Review Board including an<br />
overview of the request for Exception, a recommendation<br />
of approval or denial, and proposed findings of fact to<br />
A D M I N I S T R AT I O N A N D P R O C E D U R E S
32 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
A D M I N I S T R AT I O N A N D P R O C E D U R E S<br />
support the recommendation.<br />
C. The Development Review Board shall consider the<br />
recommendation of the Development <strong>Code</strong> Administrator<br />
and determine final action, including approval or denial<br />
of the application and specific findings of fact.<br />
D. The Development <strong>Code</strong> Administrator shall notify the<br />
applicant in writing of final action, including approval or<br />
denial of the application.<br />
E. The Development Review Board reserves the right to<br />
approve an Exception with conditions, safeguards or<br />
restrictions as needed to address any adverse impacts<br />
resulting from the Variance.<br />
9.07.04. Time<br />
A. The Development <strong>Code</strong> Administrator shall submit<br />
a report to the Development Review Board within<br />
15 working days of receipt of the application and<br />
determination of completeness.<br />
B. The Development Review Board shall take final action<br />
on the application for Exception within 15 working days<br />
of receiving the report from the Development <strong>Code</strong><br />
Administrator. Notification of approval or denial shall be<br />
made within 5 working days of final action, for a total of<br />
20 working days.<br />
C. Upon approval of a building permit, the applicant shall<br />
have no more than 3 months to utilize an approved<br />
Exception. Following 3 months, if the applicant has not<br />
initiated construction or is otherwise unable to prove<br />
progress, the Exception shall be considered expired. An<br />
extension of time may be granted by Jumeirah Village<br />
LLC upon request.<br />
9.07.05. Runs with the Use<br />
Unless otherwise specified in the approval by the DRB, an<br />
exception applies only to the specific use or project for which<br />
it is granted. No new use or project shall be permitted to<br />
utilize the exception without prior approval by the DRB.<br />
Section 9.08. Conditional Use<br />
9.08.01. Submission of Materials<br />
Generally, the application shall include all materials required<br />
to indicate the requested conditional use. If submitted as part<br />
of the Development Plan process, materials submitted for Site<br />
Plan review will largely be sufficient.<br />
9.08.02. General Criteria<br />
The Development Review Board may issue approval of a<br />
Conditional Use if the proposed project meets the criteria<br />
established in Section 4.3, Conditional Use.<br />
9.08.03. Conditional Use Process<br />
A. The approval process shall follow the steps highlighted<br />
in Figure 9.06, Development Review Board Process and<br />
discussed throughout Section 9, Administration and<br />
Procedures.<br />
B. The Development <strong>Code</strong> Administrator shall complete<br />
a report to the Development Review Board including<br />
an overview of the request for Conditional Use, a<br />
recommendation of approval or denial, and proposed<br />
findings of fact to support the recommendation.<br />
C. The Development Review Board shall consider the<br />
recommendation of the Development <strong>Code</strong> Administrator<br />
and determine final action, including approval or denial<br />
of the application and specific findings of fact.<br />
D. The Development <strong>Code</strong> Administrator shall notify the<br />
applicant in writing of final action, including approval or<br />
denial of the application.<br />
E. The Development Review Board reserves the right<br />
to approve a Conditional Use with added conditions,<br />
safeguards or restrictions as needed to address any<br />
adverse impacts resulting from the Variance.<br />
9.08.04. Time<br />
A. The Development <strong>Code</strong> Administrator shall submit<br />
a report to the Development Review Board within<br />
15 working days of receipt of the application and<br />
determination of completeness.<br />
B. The Development Review Board shall take final action<br />
on the application for Conditional Use within 15 working<br />
days of receiving the report from the Development <strong>Code</strong><br />
Administrator. Notification of approval or denial shall be<br />
made within 5 working days of final action, for a total of<br />
20 working days.<br />
C. Upon approval of a building permit, the applicant shall<br />
have no more than 3 months to utilize an approved<br />
Conditional Use. Following 3 months, if the applicant<br />
has not initiated construction or is otherwise unable to<br />
prove progress, the Conditional Use shall be considered<br />
expired. An extension of time may be granted by<br />
Jumeirah Village LLC upon request.<br />
9.08.05. Runs with the Use<br />
Unless otherwise specified in the approval by the DRB, a<br />
Conditional Use applies only to the specific use or project for<br />
which it is granted. No new use or project shall be permitted<br />
to utilize the exception without prior approval by the DRB.<br />
Section 9.09. Development <strong>Code</strong> Amendment<br />
9.09.01. Request for Amendment<br />
A Development <strong>Code</strong> Amendment may be requested by<br />
an applicant seeking Development Plan approval, the<br />
Development <strong>Code</strong> Administrator, the Development Review<br />
Board, or Jumeirah Village LLC. The authority to approve<br />
an amendment to this <strong>Code</strong> is granted to the DRB, however,<br />
Jumeirah Village LLC remains the final authority and may<br />
choose to amend the <strong>Code</strong> without DRB approval.<br />
9.09.02. General Criteria<br />
The Development Review Board may amend the Development<br />
<strong>Code</strong> if the following criteria are met:<br />
A. The proposed amendment is not detrimental to the<br />
health, welfare, safety, morals, order, convenience,<br />
or prosperity of surrounding residents, investors,<br />
employees, and guests of Jumeirah Village.<br />
B. The proposed exception will provide an equal or greater<br />
means of meeting the purposes of this <strong>Code</strong> than current<br />
requirements.<br />
C. The proposed amendment is consistent with the Master<br />
Plan and will not adversely impact the mobility and<br />
infrastructure systems of Jumeirah Village.<br />
9.09.03. Amendment Process<br />
A. The Development <strong>Code</strong> Administrator shall complete<br />
a report to the Development Review Board including<br />
an overview of the request for amendment, including a<br />
recommendation regarding the proposed amendment<br />
and potential impacts.<br />
B. The Development Review Board shall consider the<br />
recommendation of the Development <strong>Code</strong> Administrator<br />
and determine to approve, reject or modify the proposed<br />
amendment.<br />
C. If the request to amend the Development <strong>Code</strong> was<br />
submitted by an applicant for Development Plan<br />
approval, the Development <strong>Code</strong> Administrator shall<br />
notify the applicant in writing of final action, including<br />
approval or denial of the amendment.<br />
9.09.04. Time<br />
Upon approval, an amendment to the Development shall<br />
take place immediately upon final action by the Development<br />
Review Board.<br />
Section 9.10. Zoning Map Amendment<br />
9.10.01. Request for Amendment<br />
A Zoning Map Amendment may be requested by an applicant<br />
seeking Development Plan approval, the Development <strong>Code</strong><br />
Administrator, the Development Review Board, or Jumeirah<br />
Village LLC. The authority to approve an amendment to Zoning<br />
Map related to this <strong>Code</strong> is granted to the DRB, however,<br />
Jumeirah Village LLC remains the final authority and may<br />
choose to amend the Zoning Map without DRB approval.<br />
9.10.02. General Criteria<br />
The Development Review Board may amend the Zoning Map<br />
if the following criteria are met:<br />
A. The proposed amendment is beneficial to the orderly,<br />
efficient and economic development of Jumeirah Village<br />
and will enhance or protect the health, welfare, safety,<br />
morals, order, convenience, or prosperity of surrounding<br />
residents, investors, employees, and guests of the<br />
a d m i n i s t r at i o n a n d p r o c e d u r e s
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
33<br />
a d m i n i s t r at i o n a n d p r o c e d u r e s<br />
community.<br />
B. The site or sites involved in the proposed amendment are<br />
more suitable for uses and standards permitted in the<br />
proposed Zone than in the current Zone.<br />
C. The proposed amendment is consistent with the Master<br />
Plan and will not adversely impact the mobility and<br />
infrastructure systems of Jumeirah Village.<br />
D. The proposed change in the Zoning Map will remain<br />
compatible with the character of the surrounding area.<br />
9.10.03. Amendment Process<br />
A. The Development <strong>Code</strong> Administrator shall complete<br />
a report to the Development Review Board including<br />
an overview of the request for amendment, including a<br />
recommendation regarding the proposed amendment<br />
and potential impacts.<br />
B. The Development Review Board shall consider the<br />
recommendation of the Development <strong>Code</strong> Administrator<br />
and determine to approve, reject or modify the proposed<br />
amendment.<br />
C. If the request to amend the Zoning Map was submitted<br />
by an applicant for Development Plan approval, the<br />
Development <strong>Code</strong> Administrator shall notify the<br />
applicant in writing of final action, including approval or<br />
denial of the amendment.<br />
9.10.04. Time<br />
Upon approval, an amendment to the Development shall<br />
take place immediately upon final action by the Development<br />
Review Board.<br />
Section 9.11. Enforcement<br />
9.11.01. Compliance Required<br />
A. No person may use, occupy, or develop land, buildings<br />
or other structures, or authorize or permit the use,<br />
occupancy, or development of land, buildings or other<br />
structures except in accordance with all applicable<br />
provisions of this <strong>Code</strong>.<br />
B. The developer of any building or land in violation of this<br />
<strong>Code</strong>, as well as any architect, builder, contractor or<br />
other professional consultant who may have assisted or<br />
contributed to such violation shall be considered guilty of<br />
a violation of this <strong>Code</strong>.<br />
C. Any use, arrangement or construction differing from<br />
officially approved plans shall be deemed in violation of<br />
this <strong>Code</strong>.<br />
9.11.02. Responsibility for Enforcement<br />
A. The Development <strong>Code</strong> Administrator is given authority<br />
on behalf of Jumeirah Village LLC to enforce the<br />
requirements of this <strong>Code</strong>, including the ability to<br />
monitor all development and operation of activities<br />
within Jumeirah Village. Jumeirah Village LLC shall have<br />
ultimate authority for enforcement and shall impose<br />
penalties for violation of this <strong>Code</strong> as appropriate.<br />
B. Any individual may make the Development <strong>Code</strong><br />
Administrator aware of potential violations. To investigate<br />
a complaint, the Development <strong>Code</strong> Administrator<br />
must be provided a detailed account of the violation,<br />
the period of occurrence and, if possible, the alleged<br />
responsible parties. All complaints shall be maintained<br />
on record by the Development <strong>Code</strong> Administrator.<br />
9.11.03. Notice of Intent<br />
A. Upon determination of a violation, the Development<br />
<strong>Code</strong> Administrator shall give notice to the individual or<br />
individuals responsible for said violation with instructions<br />
for discontinuance and compliance. The Administrator<br />
shall provide a reasonable time for compliance.<br />
B. The Development <strong>Code</strong> Administrator is hereby<br />
authorized to immediately suspend activities without<br />
notice that cause imminent destruction of property or<br />
injury to persons.<br />
9.11.04. Penalties<br />
Jumeirah Village LLC reserves the right to take all appropriate<br />
actions and initiate proceedings to prevent unlawful<br />
construction, to recover damages, or to restrain, correct, or<br />
abate any violation of this <strong>Code</strong>. One or more of the following<br />
penalties may be assessed against any person involved with<br />
violations of this <strong>Code</strong>:<br />
A. Removal or correction of the violation at the owner’s<br />
expense.<br />
B. A fine of up to Dhs. 1,000 for each day that a violation<br />
exists after the specified reasonable time provided by the<br />
Notice of Intent has expired, as calculated from the date<br />
of issuance.<br />
C. A one time fine for each occurrence of a violation<br />
including:<br />
• 1,000 Dhs. upon the initial occurrence<br />
• 2,000 Dhs. upon the second occurrence<br />
• 3,000 Dhs. upon the third occurrence<br />
• 10,000 Dhs. upon any subsequent occurrences.<br />
D. Discontinuance of utility services until the violation has<br />
been addressed to the satisfaction of Jumeirah Village<br />
LLC.<br />
E. Removal of a consultant from the register of consultants<br />
licensed to perform work in Jumeirah Village.<br />
F. In the case of a violation which endangers public health<br />
or safety, arrest and detention for a period of time<br />
established by a court of jurisdiction.<br />
A D M I N I S T R AT I O N A N D P R O C E D U R E S
34 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
D E F I N I T I O N S<br />
10. Definitions<br />
d e f i n i t i o n s<br />
Abutting: A common border with or being separated from<br />
such common border only by a roadway, easement or rightof-way.<br />
Access: The place or way by which pedestrians and vehicles<br />
have a safe and usable ingress and egress to a property or<br />
use. An unobstructed way or means of approach to private<br />
entry to or exit from a property.<br />
Access Driveway: The area between the traveled portion of<br />
a road and a parking lot used by motor vehicles for access to<br />
and from a car park, but does not include an aisle.<br />
Accessory Use: A use customarily incidental to and related to<br />
a principal use established on the same lot.<br />
Addition: An extension or increase in floor area or height of a<br />
building or structure.<br />
Adjacent: Abutting, directly connected to, or bordering.<br />
Applicant: The person, party or corporation applying for<br />
approval or permission; normally understood to be the owner,<br />
leaseholder or developer of the lot.<br />
Building: A permanently located structure having a room<br />
supported by walls or columns but excluding any courtyard<br />
such structure may have provided, however, that no form of<br />
fabric, tent or vehicle shall be considered a building.<br />
Building, Accessory: A building devoted to an accessory<br />
use or structure that is complementary to the primary use or<br />
structure.<br />
Building Height: The vertical distance measured of a<br />
structure measured in number of stories beginning at the<br />
average elevation of the finished grade at the front of the<br />
building to the highest story of the structure. Penthouse,<br />
mechanical equipment and architectural features that<br />
comprise the “top” of the structure shall not be considered in<br />
the overall structure height.<br />
Build-To Line: The line parallel to the front lot line upon which<br />
the edge of a building located closest to the street must be<br />
located.<br />
Buildable Area: That portion of a lot upon which a building,<br />
structure, pavement, or other improvements may be placed<br />
after designation of areas such as front, rear and side yards.<br />
Building Permit: An authorization granted by Jumeirah<br />
Village LLC certifying that the design of a proposed structure<br />
or development to be erected on a designated lot complies<br />
with all relevant provisions applicable to this <strong>Code</strong>. The permit<br />
allows building construction to commence.<br />
Building, Primary: A building within which is conducted the<br />
principal use permitted on the lot, as provided by this <strong>Code</strong>.<br />
Car Park: Land used to park motor vehicles.<br />
Carpark Structure: a building or structure consisting of more<br />
than one level and used to temporarily store motor vehicles.<br />
Change of Use: Any use which differs from the previous use<br />
of a building or land.<br />
Conditional Use: A use which has certain characteristics<br />
which may be detrimental to the surrounding area, but which<br />
may be permitted within a Zone with designated mitigation<br />
measures.<br />
Construction Plans: The maps, drawings and specifications<br />
indicating the proposed location and design of improvements<br />
to be installed.<br />
Courtyard: A landscaped, outdoor open space surrounded by<br />
walls or fences or other materials utilized to establish a sense<br />
of boundary.<br />
Density: The number of dwelling units per unit of land.<br />
Development: The construction, reconstruction, conversion,<br />
erection, alteration, relocation, or enlargement of any building<br />
or structure; any mining, excavation or landfill; and any land<br />
disturbance in preparation for any of the above.<br />
Development <strong>Code</strong> Administrator: Individual designated<br />
by Jumeirah Village LLC to be responsible for daily<br />
administration of the Development <strong>Code</strong>.<br />
Development Intent Questionnaire: Application to be filled<br />
out by a potential applicant as the initiating step in the<br />
Development Plan approval process.<br />
Development Plan: A combination of applications and<br />
submissions to be submitted to Jumeirah Village LLC that are<br />
necessary to gain approval for project construction..<br />
Development Review Board: Entity selected by Jumeirah<br />
Village LLC to be responsible for approval or denial of items<br />
requiring possible variation or alteration of this <strong>Code</strong>.<br />
Zone: A geographic area within which specific development<br />
regulations assigned by this <strong>Code</strong> shall apply.<br />
Zoning Map: An official map that identifies Zones that are<br />
subject to the specific use and development regulations of<br />
this <strong>Code</strong>.<br />
Driveway: An access to a required off-street parking facility<br />
or an off-street loading area.<br />
Dwelling: A building used as a self-contained residence that<br />
must include a kitchen sink, food preparation facilities, a bath<br />
or shower, and a closet pan and washbasin.<br />
Dwelling Unit: One or more habitable rooms constituting a<br />
self-contained unit with a separate entrance and used or<br />
intended to be used for living and sleeping purposes.<br />
Dwelling, Multiple Unit: A building divided into two or more<br />
dwelling units, each of which is occupied or intended to be<br />
occupied as a permanent home or residence. Also known as<br />
an Apartment Structure.<br />
Easement: A grant of one or more of the property rights by the<br />
property owner to and/or for use by the public, a corporation,<br />
or another person or entity.<br />
Egress: An exit.<br />
Environment: The physical factors of the surroundings of<br />
human beings including the land, water, atmosphere, climate,<br />
sound, odors, tastes, the biological factors of animals and<br />
plants and the social factor of aesthetics.<br />
Existing Use: The lawful use of a building, lot or structure at<br />
the time of the enactment of these regulations.<br />
Exception: Permission to depart from the design standards in<br />
the ordinance for reasons as described in Section 9.07 of this<br />
<strong>Code</strong>.<br />
Façade: The exterior walls of a building exposed to public<br />
view or that wall viewed by persons not within the building.<br />
Feature: Fixtures, components or appurtenances attached<br />
to, contiguous to or otherwise related to a building, structure<br />
or property including, without limitation, materials, overlays,<br />
moldings, sculptures, fountains, light fixtures, windows, and<br />
monuments.<br />
Fence: A construction, not considered a structure, which is<br />
designed for screening or enclosing. Landscaping screens of<br />
a height of over 1 meter shall be considered a fence whereas<br />
random plantings of any height shall not be considered a<br />
fence.<br />
Findings of Fact: Statement of facts upon which a decision by<br />
the Development Review Board has been reached.<br />
Floor Area: The total horizontal area of all floors of a building<br />
measured from the exterior surface of the outside walls,<br />
including all floors below ground level but exclusive of vent<br />
shafts and courts.<br />
Floor Area Ratio (FAR): The ratio used to control the size of<br />
a building in relation to the size of its lot. FAR is expressed<br />
as a ratio (such as 1.5 to 1) by which the area of the lot is<br />
compared with the total allowable gross floor area of the<br />
building or buildings, excluding parking and nonhabitable<br />
areas along the exterior of the structure such as balconies<br />
and mechanical equipment. Stairs, elevators and other<br />
service areas located withing the structure are included in<br />
the FAR calculation.<br />
Frontages: Configuration of the front façade of a structure<br />
along, at minimum, the first two floors, including the ground<br />
floor.<br />
Grade: The elevation of the surface of the ground at any point<br />
on a site.<br />
Grade, Existing: The elevation of the surface of the existing<br />
undisturbed ground at any point on a site.<br />
Grade, Finished Floor: The final elevation of the ground<br />
surface after man-made alterations, such as grading,<br />
grubbing, filling, or excavating, have been made on the<br />
ground surface.
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
35<br />
d e f i n i t i o n s<br />
D E F I N I T I O N S<br />
Guest House: An accessory building for the housing of<br />
temporary guests, not containing a kitchen and not being<br />
rented or leased.<br />
Height, Building: The vertical distance from grade to average<br />
height of the highest roof structure.<br />
Home Office: A conditional, accessory use permitted in<br />
specific Zones that allows operation of small business in a<br />
home providing that impacts are mitigated and a conditional<br />
use permit issued.<br />
Hotel: A building offering temporary accommodations for<br />
eight (8) or more guests which may provide as accessory<br />
uses restaurants, meeting rooms, and recreation facilities.<br />
Illuminated: A sign utilizing an artificial or a reflective light<br />
source.<br />
Impervious Cover: Any hard-surfaced, man-made area<br />
that does not readily absorb or retain water, including but<br />
not limited to building roofs, parking and driveway areas,<br />
graveled areas, sidewalks and paved recreation areas.<br />
Improvement: Any building, structure, place, fence, gate,<br />
landscaping, tree, wall, car park, or other object constituting<br />
a physical feature which is not a natural feature.<br />
Ingress: An entry.<br />
Intersection: The crossing of two (2) or more roads at grade.<br />
Landscaping: The treatment and maintenance of a property<br />
or yard area with a combination of vegetation (ground cover,<br />
plants, shrubs, or trees), natural elements (brick, rocks, or<br />
water) and other natural or decorative features (walkways,<br />
fences, pools, fountains, or benches).<br />
Landscape Plan: A plan submitted as part of a package<br />
for Development Plan approval indicating the proposed<br />
landscape development, irrigation system and fences.<br />
Loading Space, Off-street: Space logically and conveniently<br />
located for bulk pickups and deliveries, scaled to delivery<br />
vehicles expected to be used, and accessible to such<br />
vehicles when required off-street parking spaces are filled.<br />
Lot: A piece, parcel, or plot of land occupied by or to be<br />
occupied by one principal building, its accessory buildings<br />
and frontage on a street.<br />
Lot Area: The total extent of surface, measured in a horizontal<br />
plane, within the lot lines of a lot.<br />
Lot Coverage: The percentage of the area of a lot or parcel of<br />
land, which is occupied by buildings or structures.<br />
Lot Frontage: That portion of a lot which abuts a road.<br />
Lot Line: Any line bounding a lot as herein defined.<br />
Lot Line, Front: A line separating an interior lot from a street.<br />
In the case of a corner lot, the orientation of existing or<br />
proposed development shall be used to determine which lot<br />
line shall be considered the front.<br />
Lot Line, Rear: A lot line which is opposite and most distant<br />
from the front lot line. In the case of an irregular lot, the<br />
rear lot line shall be an assumed line parallel to and at the<br />
maximum distance from the front lot line.<br />
Lot Line, Side: Any lot boundary line not a front lot line or a<br />
rear lot line.<br />
Lot Width: The width of a lot at the minimum building setback<br />
line.<br />
Master Plan: The Jumeirah Village Master Plan.<br />
Native Plant: Any species that is indigenous within the local<br />
region.<br />
Noise: Any undesirable audible sound.<br />
Occupied: Arranged, designed, built, altered, converted,<br />
rented, leased, occupied or intended to be occupied.<br />
Open Lot: An area of open land other than a road, used or<br />
intended to be used to provide space for the parking or<br />
storage of motor vehicles, including parking spaces, loading<br />
spaces, maneuvering aisles, and other areas providing<br />
access to parking or loading spaces.<br />
Parking, Off-Street: An off-street parking space consists of<br />
a space adequate for parking an automobile with room for<br />
opening doors on both sides together with properly related<br />
access to a public street, including maneuvering room.<br />
Paseo: A public walk or boulevard designed exclusively for<br />
use of pedestrians and including limited amenities as urban<br />
open spaces.<br />
Permitted Uses: Any use allowed in a Zone by right.<br />
Plant Materials: Living trees, shrubs, vines, ground covers,<br />
sod, and flowering annuals, biennials and perennials adapted<br />
to the environment of Dubai<br />
Plaza: An urban open space that is surrounded by streets and<br />
structures, largely paved and possibly including landscaping,<br />
public art, seating or other features.<br />
Public Facilities: Services or facilities provided by<br />
government or government agencies for the benefit of the<br />
general public and to which the public will have access.<br />
Remodeling: The refashioning or alteration (whether<br />
structural or not) of a building or structure without its<br />
established use being changed.<br />
Right-of-Way: A strip of land acquired by reservation,<br />
dedication or condemnation and intended to be occupied by<br />
a road, crosswalk, sidewalk, railroad, electric transmission<br />
lines, oil or gas pipeline, water line, sanitary or storm sewer,<br />
and other uses.<br />
Screening: A method of visually obscuring nearby structures<br />
or land uses (car park, outdoor storage) from another with<br />
the use of one or a combination of fencing, walls, dense<br />
vegetation, or berms.<br />
Setback: A line established by development control<br />
regulations, generally parallel with and measured from the<br />
front property line, defining the limits of a lot in which no<br />
building, accessory building or structure may be located<br />
above the ground.<br />
Setback, Rear: A setback extending the full width of the lot in<br />
the area between the rear lot line and the rear building line.<br />
Setback, Side: A setback extending the full width of the lot in<br />
the area between a side lot line and a side building line.<br />
Sign: Any device designed to inform or attract the attention<br />
of a person not on the premises on which the sign is located.<br />
It means any structure, wall, natural object, or other device<br />
used for visual communication which is visible from any<br />
street or means of access and is used to advertise or direct<br />
attention to an activity, product, place, person, or business.<br />
Sign, Awning: A sign that is mounted, painted or attached to<br />
an awning, canopy or marquee.<br />
Sign, Flashing: A sign having a conspicuous and intermittent<br />
variation in the illumination.<br />
Sign, Illuminated: Any sign designed to emit or brightly reflect<br />
artificial light.<br />
Sign, Ground: A sign which is less than 1.5 meters from the<br />
ground or is supported by a sign structure that is placed on or<br />
anchored in the ground and is independent of any building or<br />
other structure.<br />
Sign, Pedestal: A sign that is mounted on one or more<br />
freestanding poles or other support so that the bottom edge<br />
of the sign face is more than 0.5 meters from contact with a<br />
solid base or the ground. Also sometimes known as a “pole<br />
sign.”<br />
Sign, Projecting: A sign that is partially or wholly dependent<br />
upon a building for support and that projects more than 30<br />
centimeters from such building.<br />
Sign, Temporary: A sign or advertising display constructed of<br />
cloth, canvas, fabric, wood or other light material intended to<br />
be displayed for a short period of time.<br />
Sign, Tower: A large scale sign that is mounted near the top<br />
of a tower that is generally used as a means of identifying an<br />
important tenant or the name of a facility.<br />
Sign, Wall: Any sign posted or painted in suspended from or<br />
otherwise affixed to the wall of any building or structure in an<br />
essentially flat position or with the exposed face of the sign in<br />
a plane approximately parallel to the plane of such wall.
36 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
D E F I N I T I O N S<br />
d e f i n i t i o n s<br />
Sign, Window: Any sign that is placed inside a window,<br />
upon the window, or upon the window pane or glass, and<br />
is intended to be visible from the exterior of the window.<br />
Merchandise displays shall not be considered a window sign.<br />
Street: A right-of-way which has been improved and is<br />
intended for motor vehicle traffic and provides access to<br />
property.<br />
Taxi Rank: The use of land as a base of operations for a<br />
taxicab or other land-vehicle passenger transport service.<br />
Temporary Use: A use established for a limited duration with<br />
the intent to discontinue such use upon the expiration of the<br />
time period.<br />
Trellis: A frame of latticework designed for purposes of<br />
providing visual appeal and shade along pedestrian corridors<br />
of Jumeirah Village.<br />
Variance: Permission to depart from the literal requirements<br />
of a this <strong>Code</strong>, where such a variance would not be contrary<br />
to the public interest and where the a literal enforcement of<br />
the ordinance would result in unnecessary hardship.<br />
Yard, Front: The area from one side lot line to the other side<br />
lot line and between the primary structure and the street on<br />
which the lot fronts. On a corner lot (lots abutting on two or<br />
more streets at their intersections), the front yard shall face<br />
the shortest street dimension of the lot.<br />
Yard, Rear: A space extending across the full width of the<br />
lot between the principal building and the rear lot line and<br />
measured perpendicular to the building to the closest point of<br />
the rear lot line.<br />
Yard, Side: A space extending from the front yard to the<br />
rear yard between the principal building and the side lot line<br />
measured perpendicular from the side lot line to the closest<br />
point of the principal building.
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
37<br />
a p p l i c at i o n c h e c k l i s t s<br />
Application Checklists<br />
Development Intent Questionnaire Contents<br />
o<br />
o<br />
o<br />
o<br />
General Applicant Information<br />
Applicant information to include:<br />
1. Name<br />
2. Contact information (address, telephone, fax, email)<br />
3. Expatriate Status<br />
Sponsor Information<br />
If applicant is an expatriate, sponsor information is<br />
required, including:<br />
4. Name of Agent/Sponsor<br />
5. Contact Information for Agent/Sponsor (address,<br />
telephone, fax, email)<br />
Construction Information<br />
Determine the type of construction activity to be carried<br />
out such as:<br />
6. New Construction (of primary structure, accessory<br />
structure, parking, signs, or other amenities)<br />
7. Redevelopment or Alteration (of primary structure,<br />
accessory structure, parking, signs, or other<br />
amenities)<br />
Project Type<br />
Determine the type of project expected to be developed<br />
according to:<br />
8. Type of Structure (Villa, Townhome, Mid-Rise, Tower,<br />
low scale retail, public or civic)<br />
9. Type of Activities (Residential, Entertainment,<br />
Restaurant, Hotel, General Retail, Office, Service,<br />
Recreation, Education, Institutional, Other)<br />
10. If one or more of uses is expected to be a hotel, the<br />
number of units, staff and food outlets should be<br />
provided.<br />
o<br />
o<br />
o<br />
Concept<br />
Discussion of the concept for the project in as much<br />
detail as needed or possible to aid in discussion during<br />
the Pre-Application Meeting. Illustrations or concept<br />
sketches, if available, should be submitted with the<br />
Development Intent Questionnaire.<br />
Anticipated Project Needs<br />
11. Indication of desired location in Jumeirah Village as<br />
well as anticipated land requirements<br />
12. Project Development Services such as architecture,<br />
landscape architecture, engineering, site design, or<br />
other<br />
13. Financial Services<br />
Time of Anticipated Construction and Completion<br />
Estimated timeline for project to commence as well as<br />
time of completion. Key dates throughout the process, if<br />
known, should also be included.<br />
Master Form Contents<br />
General requirements:<br />
A. 2 copies of all materials<br />
B. Drawings clearly labeled in the lower right hand corner<br />
C. Drawings to be folded to A4 size with labels clearly<br />
visible<br />
o<br />
o<br />
o<br />
o<br />
General Applicant Information<br />
Applicant information to include:<br />
15. Name<br />
16. Contact information (address, telephone, fax, email)<br />
17. Expatriate Status<br />
18. Development Application Tracking Number<br />
Sponsor Information<br />
If applicant is an expatriate, sponsor information is<br />
required, including:<br />
19. Name of Agent/Sponsor<br />
20. Contact Information for Agent/Sponsor (address,<br />
telephone, fax, email)<br />
Action Requested<br />
Actions may include Approval for Concept Plan, Site<br />
Plan, Building Permit, Variance, Exception, Conditional<br />
Use, Development <strong>Code</strong> Text Amendment, or Zoning Map<br />
Amendment<br />
Construction Information<br />
Indicate the type of construction activity to be carried out<br />
such as:<br />
21. New Construction (of primary structure, accessory<br />
structure, parking, signs, or other amenities)<br />
22. Redevelopment or Alteration (of primary structure,<br />
accessory structure, parking, signs, or other<br />
amenities)<br />
o<br />
o<br />
o<br />
Project Type<br />
Indicate the type of project expected to be developed<br />
according to:<br />
23. Type of Structure (Villa, Townhome, Mid-Rise, Tower,<br />
low scale retail, public or civic)<br />
24. Type of Activities (Residential, Entertainment,<br />
Restaurant, Hotel, General Retail, Office, Service,<br />
Recreation, Education, Institutional, Other)<br />
25. If one or more of uses is expected to be a hotel, the<br />
number of units, staff and food outlets should be<br />
provided.<br />
Concept<br />
Discussion of the concept for the project as it has<br />
evolved through the Pre-Application and Development<br />
Plan process.<br />
Certifications<br />
Indication of the seal and certification of all architects,<br />
engineers and other allied professionals involved<br />
with the project as licensed and registered to work in<br />
Jumeirah Village and certifying the authenticity, quality<br />
and preparation of submitted documents.<br />
A P P L I C AT I O N C H E C K L I S T S
38 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
A P P L I C AT I O N C H E C K L I S T S<br />
Concept Plan Checklist<br />
o<br />
Master Application Form<br />
o<br />
Notation of materials to be used on site including type, color, texture, transparency, and location<br />
a p p l i c at i o n c h e c k l i s t s<br />
o<br />
Design Statement<br />
The applicant discussing the impact of the project on Jumeirah Village. and the methods used to meet the vision of the<br />
Master Plan and meet the Eight Principles guiding community design<br />
o<br />
o<br />
Floor and roof plans (scale of 1:200) indicating each roof and floor, proposed uses, roof gardens, penthouses and<br />
location of mechanical equipment<br />
Calculations of Floor Area Ratio and Maximum Lot Coverage<br />
o<br />
Documentation<br />
Table of architects, engineers, contractors and other allied professionals to be working on the project and certification that<br />
they have been licensed and registered by Jumeirah Village LLC<br />
o Layout Plan (Scale of 1:1,000)<br />
o Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
o<br />
o<br />
Location of lot in relation to Jumeirah Village, adjacent streets and surrounding development<br />
Zone in which project and surrounding sites are located<br />
o Site Plan (Scale of 1:200)<br />
o Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
o Conceptual Parking and Loading Plan (scale of 1:200)<br />
o Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
o<br />
o<br />
o<br />
o<br />
Calculations indicating the total number of parking spaces anticipated for the project, the number of on-street spaces<br />
adjacent to the project, and number of bicycle units supported<br />
Site plan and elevations as needed to indicate conceptual design of parking area including number of floors (if needed)<br />
below and above ground, parking and lane dimensions, location of access, screening techniques employed and details<br />
to ensure compatibility with the structure and site design<br />
Location and design of loading areas<br />
Space for vehicle stacking, if needed<br />
o<br />
o<br />
o<br />
o<br />
o<br />
o<br />
o<br />
o<br />
o<br />
Site dimensions, lot description and reference coordinates<br />
Street pavement lines<br />
Build-to line and setbacks<br />
Location of proposed primary and accessory buildings<br />
Location and measure of parking area, type of parking and points of access<br />
Location of services and facilities such as refuse containers and complimentary fencing/screening<br />
Existing features and proposed alterations to structures or other features of the site<br />
Existing and proposed site contours<br />
Conceptual Architectural Details<br />
o Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
o<br />
o<br />
o<br />
Perspective or elevation renderings clearly showing the proposed style, appearance and form of all buildings and<br />
improvements<br />
Description of techniques used to meet Form standards of the Development <strong>Code</strong> (including bulk, articulation and<br />
differentiation)<br />
Elevations (scale of 1:200) of a minimum of 3 building faces for each structure including delineation of podium, shaft<br />
(lower, middle and upper sections) and top<br />
o Conceptual Master Sign Plan (scale of 1:200)<br />
o Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
o<br />
o<br />
Calculations indicating the amount of sign space and type of permitted signs available to the project<br />
Anticipated location, dimensions, design, and type of signs to be utilized throughout the site in relationship to lot lines,<br />
setbacks, structures, amenities, and the streetscape<br />
o Conceptual Master Landscape Plan (scale of 1:200)<br />
o Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
o<br />
o<br />
o<br />
o<br />
o<br />
Calculations of required landscaping and fencing<br />
Site Plan indicating the anticipated location, materials and type of landscape and fencing treatment, including roof<br />
gardens, plazas, courtyards, and open spaces<br />
If fencing is required, the type of fencing that is to be employed, including materials and location<br />
Service Requirement<br />
Estimated infrastructural requirements to support staff, utilities and facilities<br />
Estimated Irrigation Needs<br />
An estimate in liters of the total peak daily irrigation water requirements for all proposed plantings based upon the<br />
Conceptual Landscape Plan, including an estimate for grass, if any<br />
o<br />
Optional CAD files
d u b a i , u . a . e . - o c t o b e r 2 0 0 6<br />
J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e<br />
39<br />
a p p l i c at i o n c h e c k l i s t s<br />
Site Plan Checklist<br />
o<br />
o<br />
Master Application Form<br />
Design Statement<br />
The applicant discussing the impact of the project on Jumeirah Village and the methods used to meet the vision of the<br />
Master Plan and meet the Eight Principles guiding community design<br />
o<br />
Detailed Architectural Details<br />
o Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
o<br />
Perspective or elevation renderings clearly showing the proposed style, appearance and form of all buildings and<br />
improvements<br />
A P P L I C AT I O N C H E C K L I S T S<br />
o<br />
o<br />
Documentation<br />
Table of architects, engineers, contractors and other allied professionals to be working on the project and certification that<br />
they have been licensed and registered by Jumeirah Village LLC<br />
Layout Plan<br />
If the project required a Concept Plan, then the Layout Plan for the Site Plan approval shall be the same with changes<br />
incorporated from the Concept Plan process<br />
o<br />
o<br />
o<br />
Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
Location of lot in relation to Jumeirah Village , adjacent streets and surrounding development<br />
Zone in which project and surrounding sites are located<br />
o Site Plan (Scale of 1:200)<br />
If the project required a Concept Plan, then the Site Plan shall be the same with changes incorporated from the Concept<br />
Plan process<br />
o<br />
o<br />
o<br />
o<br />
o<br />
Detailed Description of techniques used to meet Form standards of the Development <strong>Code</strong> (including bulk, articulation<br />
and differentiation)<br />
Detailed plans of each floor of primary and accessory structures including all development, improvements or<br />
alterations. Roof plans shall be include and accessory structures shall include carpark structures and serve facilities<br />
such as refuse areas. All indoor and outdoor spaces shall be clearly delineated, including roof gardens and other<br />
required spaces.<br />
Detailed elevations (scale of 1:100) of all building faces for each structure including delineation of podium, shaft (lower,<br />
middle and upper sections) and top<br />
Two or more sections (scale of 1:100) drawn at right angles through each structure and indicating internal and<br />
external floor levels, window sill heights, parapet heights, penthouses, roof gardens, mechanical equipement, and the<br />
relationship to surrounding structures<br />
Detailed drawings shall include location of fences, walls, parking areas, signs, landscaping and lighting for purposes of<br />
context and review<br />
o<br />
Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
o<br />
Samples of materials to be used on site including type, color, texture, transparency, and location<br />
o<br />
Site dimensions, lot description and reference coordinates<br />
o<br />
Calculations of Total Floor Area, Floor Area Ratio and Maximum Lot Coverage<br />
o<br />
o<br />
Street pavement lines<br />
Build-to line and setbacks<br />
o Detailed Parking Plan (scale 1:100)<br />
o Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
o<br />
o<br />
o<br />
o<br />
o<br />
Location of proposed primary and accessory buildings<br />
Location and measure of parking area, type of parking and points of access<br />
Location of services and facilities such as refuse containers and complimentary fencing/screening<br />
Existing features and proposed alterations to structures or other features of the site<br />
Existing and proposed site contours<br />
o Grading and Drainage Plan (scale of 1:200)<br />
A site plan and two cross-sections through the site in each main direction indicating existing and finished levels with areas<br />
of cut and fill emphasized in shading. Drainage flow on site plan must be shown to an approved stormwater inlet or to an<br />
access way that leads to a street<br />
o<br />
o<br />
o<br />
o<br />
Calculations indicating the total number of parking spaces anticipated for the project, the number of on-street spaces<br />
adjacent to the project, and number of bicycle units supported<br />
Site plan and elevations as needed to indicate detailed design of parking area including number of floors (if needed)<br />
below and above ground, parking and lane dimensions, location of access, screening techniques employed and details<br />
to ensure compatibility with the structure and site design<br />
Location and design of loading areas<br />
Space for vehicle stacking, if needed<br />
o Detailed Master Sign Plan (scale 1:100)<br />
o Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
o<br />
Calculations indicating the amount of sign space and type of permitted signs available to the project<br />
o<br />
Precise location, dimensions, design, and type of signs to be utilized throughout the site in relationship to lot lines,<br />
setbacks, structures, amenities, and the streetscape<br />
o<br />
A single elevation depicting each permanent sign
40 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
A P P L I C AT I O N C H E C K L I S T S<br />
o Detailed Master Landscaped Plan (scale of 1:100)<br />
o Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />
o<br />
o<br />
o<br />
o<br />
Calculations of required landscaping and fencing<br />
Schedule of plants and materials to be incorporated into the project including name, quantity and reference to the<br />
Landscape Master Plan<br />
Site plan and section detail of location of landscape treatments, including trees, shrubs, ground cover and lawns<br />
Location and section detail of hard surface materials, water features and fencing to be located on the project site<br />
a p p l i c at i o n c h e c k l i s t s<br />
o<br />
Irrigation Calculations<br />
o Irrigation water demand calculations relating to the proposed plantings shown and described in the Landscape Master<br />
Plan, including the peak daily plant water consumption as indicated in liters and calculated at the peak season of July<br />
o<br />
o<br />
o<br />
Monthly projected irrigation water consumption figures covering the effect of leaching and other off-season practices<br />
Irrigation site plan (scale of 1:200) indicating the location and capacity of the irrigation water storage tanks, tank<br />
connections, and details of the distribution system.<br />
A timetable for timing in relationship to irrigation of landscaping at maturity<br />
o Utility Plan (scale of 1:200)<br />
Schedule and plan indicating coordinates, depths, levels, and sizes of all pipes, conduits and connections regarding<br />
water (potable and for irrigation), wastewater, electricity, telephone, and other utilities from points of entering the site to<br />
distribution including, if required, transformers, switch boxes, meters and emergency generator.<br />
o<br />
o<br />
o<br />
Electricity Calculations and Diagrams<br />
o Final electricity load calculations for the development expressed in kVA<br />
o<br />
Detailed electrical diagrams indicating details of distribution and circuit breakers<br />
Refuse Plan<br />
Calculation of anticipated refuse to be accumulated as well as provisions made for storage and disposal<br />
Construction Schedule<br />
o Proposed time schedule for completion of the project as initiated upon receiving an approved Building Permit<br />
o<br />
Management plan describing the organization of work to be completed on the project in coordination with the provided<br />
time schedule, including plans for onsite supervisory personnel