28 J u m e i r a h V i l l a g e - M I D R I S E D e v e l o p m e n t C o d e o c t o b e r 2 0 0 6<br />
J U M E I R A H V I L L A G E L L C<br />
A D M I N I S T R AT I O N A N D P R O C E D U R E S<br />
Figure 9.02,<br />
Pre-Application Review Process<br />
Pre-Application<br />
Meeting Stage<br />
Concept Plan<br />
Stage<br />
(Optional)<br />
Site Plan<br />
Stage<br />
Building Permit<br />
Stage<br />
Yes<br />
No<br />
Development Intent<br />
Application<br />
Submitted<br />
Review for<br />
Completeness<br />
Pre-Application<br />
Meeting Conducted<br />
Is a Concept Plan<br />
Needed?<br />
Section 9.03. Concept Plan<br />
9.03.01. Submission of Materials<br />
The applicant shall submit to Jumeirah Village LLC two sets of<br />
all design materials required in the Application Checklists as<br />
well as the Concept Plan Application.<br />
A. Generally, the Concept Plan shall conceptually show to<br />
scale property boundaries, approximate location and<br />
dimensions of all structures, setbacks, location and<br />
general information regarding signs, parking areas,<br />
entryways, topography, north orientation, a description of<br />
general bulk requirements, landscaping and schematic<br />
floor plans, and elevations of at least three sides of<br />
all structures. Specific requirements are provided in<br />
Application Checklists.<br />
B. An additional CAD file of the Concept Plan may be<br />
submitted as a supplement to required materials. If<br />
submitted, the CAD file should be in a format that is<br />
acceptable to Jumeirah Village LLC, including file format,<br />
separation of design elements into layers, and clean line<br />
work.<br />
C. A spreadsheet summary of all development data, in<br />
compliance with the requirements of this <strong>Code</strong> (such as<br />
lot area, built up area and parking provision).<br />
9.03.02. Plan Review Process<br />
A. The approval process shall follow the steps highlighted in<br />
Figure 9.03, Concept Plan Review Process and discussed<br />
throughout Section 9, Administration and Procedures.<br />
B. The Development <strong>Code</strong> Administrator shall review the<br />
application in its ability to meet the vision of the Jumeirah<br />
Village Master Plan and the requirements of this <strong>Code</strong>.<br />
If all requirements are met, the Development <strong>Code</strong><br />
Administrator shall approve the application. If additional<br />
information is needed, the Administrator shall request<br />
additional information.<br />
C. The Development <strong>Code</strong> Administrator shall notify the<br />
applicant of final action, including approval or denial of<br />
the application. One set of the plans marked as approved<br />
or denied shall be accompanied by a letter and returned<br />
to the applicant while the second set shall be similarly<br />
marked and retained by Jumeirah Village LLC.<br />
D. The Development <strong>Code</strong> Administrator reserves the right<br />
to approve a Concept Plan with conditions, assuming<br />
that such conditions serve to bring the project into<br />
compliance with this <strong>Code</strong>.<br />
E. If approval is conditional, the applicant may request a<br />
meeting with the Development <strong>Code</strong> Administrator to<br />
discuss the conditions and request reconsideration.<br />
Following further review, the Development <strong>Code</strong><br />
Administrator shall notify the applicant of revisions, if<br />
any, to the final action.<br />
9.03.03. Time<br />
A. The Development <strong>Code</strong> Administrator shall approve or<br />
deny a Concept Plan within 10 working days of receipt<br />
of the application and determination of completeness.<br />
Notification of approval or denial shall be made within<br />
5 working days of final action, for a total of 15 working<br />
days.<br />
B. Upon approval, the applicant shall have no more than<br />
3 months to submit a Site Plan application. Following 3<br />
months, a Concept Plan shall be considered expired. An<br />
extension of time may be granted by Jumeirah Village<br />
LLC upon request.<br />
C. If approval is conditional, the applicant shall be deemed<br />
to have agreed with all conditions unless, within 15<br />
working days, the applicant requests a meeting with the<br />
Development <strong>Code</strong> Administrator to review the decision.<br />
D. Within 15 working days of meeting the applicant to<br />
discuss the conditional approval, the Development <strong>Code</strong><br />
Administrator shall notify the applicant of revisions, if<br />
any, to the final action.<br />
Section 9.04. Site Plan<br />
9.04.01. Submission of Materials<br />
A. The applicant shall submit to Jumeirah Village LLC<br />
two sets of all design materials required in Application<br />
Checklists as well as the Site Plan Application.<br />
B. Generally, the Site Plan shall accurately show to scale<br />
property boundaries, location and dimensions of all<br />
structures, all building wall elevations and setbacks,<br />
parking areas, entryways, topography, north orientation,<br />
Figure 9.03,<br />
Concept Plan Review Process<br />
Pre-Application<br />
Meeting Stage<br />
Concept Plan<br />
Stage<br />
(Optional)<br />
Site Plan<br />
Stage<br />
Building Permit<br />
Stage<br />
Yes<br />
Yes with<br />
Conditions<br />
Concept Plan<br />
Application and<br />
Materials Submitted<br />
Review for<br />
Completeness<br />
Application Review<br />
Is More Information<br />
Needed?<br />
No<br />
Yes<br />
Is the Application<br />
Approved?<br />
No<br />
Letter of<br />
Rejection<br />
a d m i n i s t r at i o n a n d p r o c e d u r e s