If <strong>Mackenzie</strong> & <strong>Ebert</strong>’s <strong>2013</strong> is anything to go by, it may well be the year that the<br />

golf world began to shrug off the world recession.<br />

It was a year dominated by reconstruction work<br />

with projects underway in Canada, Denmark, Finl<strong>and</strong>, Engl<strong>and</strong>,<br />

Luxembourg, Scotl<strong>and</strong>, Wales, Holl<strong>and</strong> <strong>and</strong> Spain.<br />

15 of the Top 50 Courses in Great Britain & Irel<strong>and</strong> were advised.<br />

Advice continued to be provided at 5 of the 9 Open venues<br />

Turnberry, Royal St. George’s, Royal Lytham & St. Annes, Royal Troon <strong>and</strong> Carnoustie<br />

50 greens or green surrounds were reworked or rebuilt <strong>and</strong> more than<br />

300 bunkers reshaped or added.<br />

<strong>2013</strong> <strong>Review</strong>


Once again this year, we have been entrusted to work on many of the great courses across<br />

Europe. Working sensitively on courses where the great old architects have worked is part of<br />

what we have always done in our careers.<br />

Architect<br />

Harry Colt<br />

Herbert Fowler<br />

Dr A MacKenzie<br />

Philip <strong>Mackenzie</strong> Ross<br />

Old Tom Morris<br />

John Morrison<br />

Tom Simpson<br />

Courses With Direct M&E Involvement In <strong>2013</strong> Where The Great Old<br />

Architect s Worked<br />

Effingham, Royal Portrush, Royal Porthcawl, Royal Worlington & Newmarket,<br />

Ganton, Royal Belfast, Burnham <strong>and</strong> Berrow, Royal Lytham <strong>and</strong> St. Annes, Formby<br />

The Berkshire, Delamere Forest, Saunton (East), Ganton<br />

Royal Troon (Old <strong>and</strong> Portl<strong>and</strong>), Ganton<br />

Turnberry (Ailsa)<br />

Royal County Down, Royal Dornoch,<br />

Kedleston Park<br />

Club de Golf Terramar<br />

James Braid<br />

Edzell, Goodwood, Southport & Ainsdale, Panmure<br />

<strong>2013</strong> <strong>Review</strong>


Courses Worked On In <strong>2013</strong> From The Golf Monthly Top 100 GB&I<br />

2nd Turnberry (Ailsa) Ongoing advice 1<br />

4th Royal County Down Three new holes for the Annersley Links <strong>and</strong> new practice ground 2<br />

10th Royal Lytham & St Annes Dune construction <strong>and</strong> input on bunker styles 3<br />

12th Royal St. George's Ongoing advice 4<br />

16th Royal Portrush (Dunluce) Ongoing advice 5<br />

17th Royal Dornoch Revisions to 3rd Hole undertaken 6<br />

24th Royal Troon (Old) Extensive works in preparation for 2016 Open 7<br />

25th Ganton Ongoing advice 8<br />

29th Portmarnock Long term planning advice 9<br />

30th Saunton East Course Advice on 5th, 14th <strong>and</strong> 16th 10<br />

31st Royal Porthcawl Works in preparation for 2014 Senior Open 11<br />

40th The Berkshire Red General course advice 12<br />

41st Formby Ongoing advice 13<br />

47th Burnham & Berrow Extension of 16th Green 14<br />

50th Southport <strong>and</strong> Ainsdale Bunkering Input 15<br />

53rd Royal Cinque Ports Ongoing input 16<br />

63rd The Berkshire Red General course advice 17<br />

76th Rye Advise on practice facilities <strong>and</strong> Jubilee Course 18<br />

98th Panmure Ongoing advice 19<br />

100th Royal Worlington & Newmarket Preparation of a masterplan 20<br />

<strong>2013</strong> <strong>Review</strong>


Every project is important but <strong>2013</strong> marked some projects that merit special mention.<br />

South Course, Angus Glen, Ontario, Canada<br />

Almost unbelievably the entire course was rebuilt in 12 weeks, starting on 30th August <strong>2013</strong>.<br />

At the peak of the work, there were 30 machines <strong>and</strong> 70 people working on the site.<br />

Royal Troon, Ayrshire, Scotl<strong>and</strong><br />

An extensive package of work is underway at Royal Troon in preparation for the 2016 Open<br />

Championship. It includes tees <strong>and</strong> bunkers as well as extensive dune construction on the 9th <strong>and</strong><br />

10th holes <strong>and</strong> relocating the first part of the 15th hole.<br />

Furesø, Copenhagen Denmark<br />

Phase One of the reconstruction of every bunker <strong>and</strong> green surround at Furesø was completed<br />

with this year’s work extending to 10 greens out of 27, the remainder of which will be rebuilt in 2014.<br />

Royal Mid-Surrey, Surrey, Engl<strong>and</strong><br />

The reconstruction of the front nine on the Outer Course at Royal Mid-Surrey was undertaken,<br />

involving extensive work in The River Thames flood plain. This work follows the successful<br />

reconstruction of the back nine in 2009.<br />

Delamere Forest, Cheshire, Engl<strong>and</strong><br />

Many clubs are re-working their bunkers, but Delamere Forest has rebuilt all 81 of theirs<br />

in 14 months, hiring a shaper <strong>and</strong> doing all turfing in house.<br />

Major Projects


Delamere Forest Cheshire, Engl<strong>and</strong><br />

Phase One of course work<br />

completed<br />

New 11 th tee underway<br />

January


Delamere Forest Cheshire, Engl<strong>and</strong><br />

Phase One of course work<br />

completed<br />

11 th tee in summer <strong>2013</strong><br />

January


Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />

Appointed to advise<br />

this renowned links<br />

January


Carnoustie Angus, Scotl<strong>and</strong><br />

Assessment of offshore cable<br />

route through Buddon Course<br />

January


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

Planning visit for Old Course<br />

2016 Open improvements<br />

January


Portmarnock Dublin, Irel<strong>and</strong><br />

Advice provided on long term<br />

development plans<br />

January


Portmarnock Dublin, Irel<strong>and</strong><br />

Assessing old photos<br />

for bunker style inspiration<br />

January


The Warren Essex, Engl<strong>and</strong><br />

Appointed to advise on course<br />

re-routing <strong>and</strong> upgrade<br />

February


Kibworth Leicester, Engl<strong>and</strong><br />

Bunkers on 14 th hole<br />

finished off<br />

February


Hindhead Surrey, Engl<strong>and</strong><br />

14 th tees rebuilt with<br />

extensive reshaping<br />

Photo courtesy of Steve Holmes<br />

February


Royal Lytham & St. Annes Lancashire, Engl<strong>and</strong><br />

Low dunes constructed<br />

around 2 nd green<br />

March


Exeter Devon, Engl<strong>and</strong><br />

Helping with safety problems<br />

arising from new development<br />

March


Royal Worlington Bury St Edmunds, Engl<strong>and</strong><br />

Updated masterplan<br />

<strong>and</strong> bunker relocation<br />

March


Royal Portrush Antrim, Northern Irel<strong>and</strong><br />

Dunluce <strong>and</strong> Valley<br />

Course projects<br />

March


Royal Porthcawl Mid Glamorgan, Wales<br />

Bunker restoration<br />

on the 5 th hole<br />

April


Furesø Copenhagen, Denmark<br />

Planning meeting for summer<br />

reconstruction contract<br />

April


Angus Glen Toronto, Canada<br />

Full 18 hole reconstruction<br />

planning visit<br />

April


Goodwood Ontario, Canada<br />

18th Hole fairway<br />

alignment adjustment<br />

April


Kedleston Park Derbyshire, Engl<strong>and</strong><br />

Appointed to prepare<br />

course audit<br />

April


Real Tenerife Canary Isl<strong>and</strong>s, Spain<br />

Detailed plans completed for<br />

Phase One construction<br />

April


Malmø Sweden<br />

European Institute of Golf Course<br />

Architects Annual Meeting<br />

Tom appointed as<br />

EIGCA Vice President<br />

April


Malmø Sweden<br />

European Institute of Golf Course<br />

Architects Annual Meeting<br />

Tom launches EIGCA<br />

Sustainability Register &<br />

Education Programme<br />

April


Gullane No 1 East Lothian, Scotl<strong>and</strong><br />

Appointed to advise Gullane<br />

on their No 1 Course<br />

April


Portmarnock Dublin, Irel<strong>and</strong><br />

Presentation of proposals<br />

to the Committee<br />

April


Vierumäki Finl<strong>and</strong><br />

Green reconstruction<br />

planning visit<br />

May


Vierumäki Finl<strong>and</strong><br />

Visualisation of conversion of<br />

sleepers to bunker<br />

May


Hill Side Finl<strong>and</strong><br />

Course assessment <strong>and</strong><br />

safety advisory visit<br />

May


Southport & Ainsdale Lancashire, Engl<strong>and</strong><br />

Bunker style conversion<br />

Before Photo<br />

May


Southport & Ainsdale Lancashire, Engl<strong>and</strong><br />

Bunker style conversion<br />

Visualisation<br />

May


Southport & Ainsdale Lancashire, Engl<strong>and</strong><br />

Bunker s<strong>and</strong> line<br />

marking out<br />

November


Southport & Ainsdale Lancashire, Engl<strong>and</strong><br />

The finished result<br />

December


Effingham Surrey, Engl<strong>and</strong><br />

New 5 th Green <strong>and</strong> 18 th Hole<br />

open on schedule<br />

Photo courtesy of Paul Hutchinson<br />

May


Cannes Mougin Côte d’Azur, France<br />

Visit to review tree removal work<br />

<strong>and</strong> masterplan proposals<br />

May


The Berkshire Berkshire, Engl<strong>and</strong><br />

Appointed to advise on various<br />

holes on the Red Course<br />

May


Fulford York, Engl<strong>and</strong><br />

Appointed to draw up<br />

a masterplan<br />

May


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

Concept plans prepared<br />

for future projects<br />

May


Royal Dornoch Sutherl<strong>and</strong> Scotl<strong>and</strong><br />

3 rd hole proposals presented<br />

to the members<br />

June


Royal St. George’s S<strong>and</strong>wich, Engl<strong>and</strong><br />

Advice regarding specific<br />

projects to a number of holes<br />

May


Rye East Sussex, Engl<strong>and</strong><br />

Jubilee Course proposals<br />

finalised<br />

May


Royal Mid-Surrey Surrey, Engl<strong>and</strong><br />

Reconstruction of the front nine<br />

on the Outer Course begins<br />

June


Royal County Down Newcastle, Northern Irel<strong>and</strong><br />

Three stunning new holes<br />

planned for the Annesley Links<br />

June


Royal County Down Newcastle, Northern Irel<strong>and</strong><br />

The new holes near the coast<br />

make room for a practice ground<br />

June


The Warren Essex, Engl<strong>and</strong><br />

Technical feasibility<br />

work underway<br />

June


Carnoustie Angus, Scotl<strong>and</strong><br />

Checking on the new<br />

Buddon Course holes<br />

June


Edzell Angus, Scotl<strong>and</strong><br />

A new 4 th green for this<br />

James Braid course<br />

July


Royal Mid-Surrey Surrey, Engl<strong>and</strong><br />

Work is well underway<br />

in excellent weather<br />

July


The Open at Muirfield<br />

A festival<br />

of true links golf<br />

July


The Open at Muirfield<br />

A worthy winner<br />

with a Champion’s final round<br />

July


Furesø Copenhagen, Denmark<br />

The 1 st on Parkvej Nine<br />

shapes up<br />

Original hole<br />

July


Furesø Copenhagen, Denmark<br />

The 1 st on Parkvej Nine<br />

shapes up<br />

After shaping<br />

July


Furesø Copenhagen, Denmark<br />

The 1 st on Parkvej Nine<br />

shapes up<br />

During establishment<br />

July


South Herts Hertfordshire, Engl<strong>and</strong><br />

Reshapes 8 th green surrounds<br />

New short game green<br />

CHANGE PICTURE<br />

July


Maidenhead Berkshire, Engl<strong>and</strong><br />

Appointed to prepare<br />

full course audit<br />

July


Calcot Park Berkshire, Engl<strong>and</strong><br />

Appointed to advise<br />

on 14 th hole<br />

July


Saunton Devon, Engl<strong>and</strong><br />

Appointed to advise on<br />

various holes on East Course<br />

July


Vierumäki Finl<strong>and</strong><br />

Masterplan for the Classic<br />

Course commissioned<br />

August


Imatran Golf Imatra, Finl<strong>and</strong><br />

Follow up visit after<br />

masterplan drawn up<br />

August


Golf At Goodwood Sussex, Engl<strong>and</strong><br />

Appointed to revamp bunkers<br />

<strong>and</strong> review course<br />

August


Grafarholt Reykjavik, Icel<strong>and</strong><br />

Appointed to advise Reykjavik<br />

The oldest club in Icel<strong>and</strong><br />

August


Burnham & Berrow Somerset, Engl<strong>and</strong><br />

Planning visit to extend<br />

the wonderful 16 th green<br />

August


The Berkshire Berkshire, Engl<strong>and</strong><br />

Further input on Red<br />

<strong>and</strong> Blue Courses<br />

August


Royal Lytham & St. Annes Lancashire, Engl<strong>and</strong><br />

Testing the course<br />

from The Open tees!<br />

August


Askernish South Uist, Outer Herbrides, Scotl<strong>and</strong><br />

Another visit made<br />

for The Askernish Open<br />

August


Royal Mid-Surrey Surrey, Engl<strong>and</strong><br />

The new wetl<strong>and</strong><br />

at the 8 th hole<br />

August


Angus Glen Toronto, Canada<br />

A flying start to the South<br />

Course reconstruction project<br />

August


National Golf Links of America Long Isl<strong>and</strong><br />

Walker Cup visit to this<br />

exceptional course<br />

August


Royal Belfast Northern Irel<strong>and</strong><br />

Ongoing advice<br />

on bunkering programme<br />

September


Gr<strong>and</strong> Ducal Luxembourg<br />

Phase 4 of bunker <strong>and</strong> green<br />

surrounds project starts<br />

September


Furesø Copenhagen, Denmark<br />

The 7 th on Parkvej Nine<br />

Original hole<br />

September


Furesø Copenhagen, Denmark<br />

The 7 th on Parkvej Nine<br />

During establishment<br />

September


Angus Glen Toronto, Canada<br />

A cycling architect on his<br />

morning inspection tour<br />

September


Angus Glen Toronto, Canada<br />

How many men <strong>and</strong> machines<br />

can work on one hole?<br />

September


Goodwood Ontario, Canada<br />

Martin’s first ever round<br />

over the course!<br />

September


Royal Mid-Surrey Surrey, Engl<strong>and</strong><br />

All front nine greens seeded<br />

<strong>and</strong> growing in<br />

September


Delamere Forest Cheshire, Engl<strong>and</strong><br />

Ridge lowered to make<br />

fairway visible on 3 rd hole<br />

September


Askernish South Uist, Scotl<strong>and</strong><br />

Teaching R&A Scholarship<br />

students about design<br />

September


Carnegie Abbey Rhode Isl<strong>and</strong>, USA<br />

5 year review of course<br />

September


Carnegie Abbey Rhode Isl<strong>and</strong>, USA<br />

Design <strong>and</strong> course<br />

presentation issues<br />

Its closely mown, firm<br />

green surrounds<br />

September


Angus Glen Toronto, Canada<br />

The 1st hole<br />

nearing completion<br />

October


Gr<strong>and</strong> Ducal Luxembourg<br />

Works completed on schedule<br />

October


Keilir Nr Reykjavik, Icel<strong>and</strong><br />

Advising on layout changes<br />

on back nine<br />

October


Keilir Nr Reykjavik, Icel<strong>and</strong><br />

The front nine me<strong>and</strong>ers<br />

through a lava field<br />

October


Vierumäki Finl<strong>and</strong><br />

4 th green reconstruction<br />

underway<br />

October


Angus Glen Toronto, Canada<br />

The 18 th green all put<br />

back together again<br />

October


Myopia Hunt & Golf Club Massachusetts, USA<br />

Not a client but 2 rounds<br />

played over this great course<br />

October


Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />

Works start on revision<br />

to 3 rd hole<br />

3 rd Tee Existing View<br />

October


Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />

To restore old view<br />

<strong>and</strong> alleviate a safety problem<br />

3 rd Tee Visualisation<br />

October


Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />

The bunkers are back in view<br />

<strong>and</strong> the fairway is rotated<br />

3 rd Tee Completed Works<br />

November


Furesø Copenhagen, Denmark<br />

The 6 th on Parkvej Nine<br />

Original hole<br />

October


Furesø Copenhagen, Denmark<br />

The 6 th on Parkvej Nine<br />

During shaping<br />

October


Furesø Copenhagen, Denmark<br />

The 6 th on Parkvej Nine<br />

After seeding<br />

October


Furesø Copenhagen, Denmark<br />

The 6 th on Parkvej Nine<br />

During establishment<br />

October


Angus Glen Toronto, Canada<br />

The 16 th hole illustrating the<br />

new bunker style<br />

October


Fulford York, Engl<strong>and</strong><br />

Restoration of the full bunker<br />

size at the 7 th hole<br />

October


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

The construction work for<br />

the 2016 Open gets underway<br />

October


Burnham & Berrow Somerset, Engl<strong>and</strong><br />

We do get involved in some<br />

manual work from time to time!<br />

November


Burnham & Berrow Somerset, Engl<strong>and</strong><br />

The finished extension<br />

to the 16 th green<br />

November


Kedleston Park Derbyshire, Engl<strong>and</strong><br />

Bunker re-construction<br />

starts on 1 st , 10 th <strong>and</strong> 11 th<br />

The hole before<br />

November


Kedleston Park Derbyshire, Engl<strong>and</strong><br />

Bunker re-construction<br />

starts on 1 st , 10 th <strong>and</strong> 11 th<br />

Work underway<br />

November


Vierumäki Finl<strong>and</strong><br />

Green reconstruction<br />

continues at the 16 th<br />

November


Pickala Finl<strong>and</strong><br />

Green reconstruction<br />

planning visit<br />

November


Delamere Forest Cheshire, Engl<strong>and</strong><br />

All bunkers are reshaped<br />

in 14 months<br />

The original greenside bunker<br />

November


Delamere Forest Cheshire, Engl<strong>and</strong><br />

Softer edges of bunkers<br />

are incorporated<br />

Work underway<br />

November


Delamere Forest Cheshire, Engl<strong>and</strong><br />

More than 50 bunkers<br />

in less than 12 weeks<br />

The bunker completed<br />

November


Noordwijkse, Holl<strong>and</strong><br />

A new back tee<br />

for the 18 th hole<br />

November


Royal Cinque Ports Deal, Engl<strong>and</strong><br />

Back tee<br />

project visit<br />

November


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

Golfers taking on<br />

the rebunkered 4 th hole<br />

November


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

The cycling architect on<br />

the new part of the 15 th fairway<br />

November


Gullane No 1 East Lothian, Scotl<strong>and</strong><br />

Bunkering on 8 th <strong>and</strong> 12 th<br />

underway<br />

November


Club de Golf Terramar Sitges, Spain<br />

New 18 th tee<br />

<strong>and</strong> fairway bunkers<br />

November


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

Photograph from the new<br />

dunes behind the 9 th green<br />

December


Hayling Hampshire, Engl<strong>and</strong><br />

Bunkering work on<br />

the 9 th <strong>and</strong> 15 th holes<br />

December


Delamere Forest Cheshire, Engl<strong>and</strong><br />

The bunkers had lost their<br />

old character over the years<br />

14 th approach before<br />

December


Delamere Forest Cheshire, Engl<strong>and</strong><br />

Minor adjustments create<br />

more pin positions<br />

14 th approach after<br />

December


Noord Nederl<strong>and</strong>se Glimmen, Holl<strong>and</strong><br />

Photograph from the new<br />

dunes behind the 9 th green<br />

December


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

First batch of turf<br />

laid on the 15 th fairway<br />

December


Golf Club Scotl<strong>and</strong> Slovakia<br />

Phase 2 preparations<br />

underway for 2014 construction<br />

December


Panmure Angus, Scotl<strong>and</strong><br />

The first rough edged bunker<br />

added to the reshaped 8 th<br />

December


Carnoustie Angus, Scotl<strong>and</strong><br />

The new 12 th hole on<br />

the Buddon Course<br />

December


Edzell Angus, Scotl<strong>and</strong><br />

Local soil <strong>and</strong> s<strong>and</strong> for root<br />

zone <strong>and</strong> cores for grassing<br />

December


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

Morning dawn lighting up the<br />

new approach bunker at the 4th<br />

December


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

Dr. Alister MacKenzie’s only<br />

work at an Open venue<br />

December


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

Recreation of the bunker<br />

feature underway<br />

December


Metro House<br />

Chichester<br />

West Sussex<br />

PO191BE<br />

Telephone<br />

01243 531901<br />

pitch<strong>and</strong>run18@aol.com<br />

www.mackenzie<strong>and</strong>bert.com<br />

@golfarchitects

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!