Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
If <strong>Mackenzie</strong> & <strong>Ebert</strong>’s <strong>2013</strong> is anything to go by, it may well be the year that the<br />
golf world began to shrug off the world recession.<br />
It was a year dominated by reconstruction work<br />
with projects underway in Canada, Denmark, Finl<strong>and</strong>, Engl<strong>and</strong>,<br />
Luxembourg, Scotl<strong>and</strong>, Wales, Holl<strong>and</strong> <strong>and</strong> Spain.<br />
15 of the Top 50 Courses in Great Britain & Irel<strong>and</strong> were advised.<br />
Advice continued to be provided at 5 of the 9 Open venues<br />
Turnberry, Royal St. George’s, Royal Lytham & St. Annes, Royal Troon <strong>and</strong> Carnoustie<br />
50 greens or green surrounds were reworked or rebuilt <strong>and</strong> more than<br />
300 bunkers reshaped or added.<br />
<strong>2013</strong> <strong>Review</strong>
Once again this year, we have been entrusted to work on many of the great courses across<br />
Europe. Working sensitively on courses where the great old architects have worked is part of<br />
what we have always done in our careers.<br />
Architect<br />
Harry Colt<br />
Herbert Fowler<br />
Dr A MacKenzie<br />
Philip <strong>Mackenzie</strong> Ross<br />
Old Tom Morris<br />
John Morrison<br />
Tom Simpson<br />
Courses With Direct M&E Involvement In <strong>2013</strong> Where The Great Old<br />
Architect s Worked<br />
Effingham, Royal Portrush, Royal Porthcawl, Royal Worlington & Newmarket,<br />
Ganton, Royal Belfast, Burnham <strong>and</strong> Berrow, Royal Lytham <strong>and</strong> St. Annes, Formby<br />
The Berkshire, Delamere Forest, Saunton (East), Ganton<br />
Royal Troon (Old <strong>and</strong> Portl<strong>and</strong>), Ganton<br />
Turnberry (Ailsa)<br />
Royal County Down, Royal Dornoch,<br />
Kedleston Park<br />
Club de Golf Terramar<br />
James Braid<br />
Edzell, Goodwood, Southport & Ainsdale, Panmure<br />
<strong>2013</strong> <strong>Review</strong>
Courses Worked On In <strong>2013</strong> From The Golf Monthly Top 100 GB&I<br />
2nd Turnberry (Ailsa) Ongoing advice 1<br />
4th Royal County Down Three new holes for the Annersley Links <strong>and</strong> new practice ground 2<br />
10th Royal Lytham & St Annes Dune construction <strong>and</strong> input on bunker styles 3<br />
12th Royal St. George's Ongoing advice 4<br />
16th Royal Portrush (Dunluce) Ongoing advice 5<br />
17th Royal Dornoch Revisions to 3rd Hole undertaken 6<br />
24th Royal Troon (Old) Extensive works in preparation for 2016 Open 7<br />
25th Ganton Ongoing advice 8<br />
29th Portmarnock Long term planning advice 9<br />
30th Saunton East Course Advice on 5th, 14th <strong>and</strong> 16th 10<br />
31st Royal Porthcawl Works in preparation for 2014 Senior Open 11<br />
40th The Berkshire Red General course advice 12<br />
41st Formby Ongoing advice 13<br />
47th Burnham & Berrow Extension of 16th Green 14<br />
50th Southport <strong>and</strong> Ainsdale Bunkering Input 15<br />
53rd Royal Cinque Ports Ongoing input 16<br />
63rd The Berkshire Red General course advice 17<br />
76th Rye Advise on practice facilities <strong>and</strong> Jubilee Course 18<br />
98th Panmure Ongoing advice 19<br />
100th Royal Worlington & Newmarket Preparation of a masterplan 20<br />
<strong>2013</strong> <strong>Review</strong>
Every project is important but <strong>2013</strong> marked some projects that merit special mention.<br />
South Course, Angus Glen, Ontario, Canada<br />
Almost unbelievably the entire course was rebuilt in 12 weeks, starting on 30th August <strong>2013</strong>.<br />
At the peak of the work, there were 30 machines <strong>and</strong> 70 people working on the site.<br />
Royal Troon, Ayrshire, Scotl<strong>and</strong><br />
An extensive package of work is underway at Royal Troon in preparation for the 2016 Open<br />
Championship. It includes tees <strong>and</strong> bunkers as well as extensive dune construction on the 9th <strong>and</strong><br />
10th holes <strong>and</strong> relocating the first part of the 15th hole.<br />
Furesø, Copenhagen Denmark<br />
Phase One of the reconstruction of every bunker <strong>and</strong> green surround at Furesø was completed<br />
with this year’s work extending to 10 greens out of 27, the remainder of which will be rebuilt in 2014.<br />
Royal Mid-Surrey, Surrey, Engl<strong>and</strong><br />
The reconstruction of the front nine on the Outer Course at Royal Mid-Surrey was undertaken,<br />
involving extensive work in The River Thames flood plain. This work follows the successful<br />
reconstruction of the back nine in 2009.<br />
Delamere Forest, Cheshire, Engl<strong>and</strong><br />
Many clubs are re-working their bunkers, but Delamere Forest has rebuilt all 81 of theirs<br />
in 14 months, hiring a shaper <strong>and</strong> doing all turfing in house.<br />
Major Projects
Delamere Forest Cheshire, Engl<strong>and</strong><br />
Phase One of course work<br />
completed<br />
New 11 th tee underway<br />
January
Delamere Forest Cheshire, Engl<strong>and</strong><br />
Phase One of course work<br />
completed<br />
11 th tee in summer <strong>2013</strong><br />
January
Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />
Appointed to advise<br />
this renowned links<br />
January
Carnoustie Angus, Scotl<strong>and</strong><br />
Assessment of offshore cable<br />
route through Buddon Course<br />
January
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
Planning visit for Old Course<br />
2016 Open improvements<br />
January
Portmarnock Dublin, Irel<strong>and</strong><br />
Advice provided on long term<br />
development plans<br />
January
Portmarnock Dublin, Irel<strong>and</strong><br />
Assessing old photos<br />
for bunker style inspiration<br />
January
The Warren Essex, Engl<strong>and</strong><br />
Appointed to advise on course<br />
re-routing <strong>and</strong> upgrade<br />
February
Kibworth Leicester, Engl<strong>and</strong><br />
Bunkers on 14 th hole<br />
finished off<br />
February
Hindhead Surrey, Engl<strong>and</strong><br />
14 th tees rebuilt with<br />
extensive reshaping<br />
Photo courtesy of Steve Holmes<br />
February
Royal Lytham & St. Annes Lancashire, Engl<strong>and</strong><br />
Low dunes constructed<br />
around 2 nd green<br />
March
Exeter Devon, Engl<strong>and</strong><br />
Helping with safety problems<br />
arising from new development<br />
March
Royal Worlington Bury St Edmunds, Engl<strong>and</strong><br />
Updated masterplan<br />
<strong>and</strong> bunker relocation<br />
March
Royal Portrush Antrim, Northern Irel<strong>and</strong><br />
Dunluce <strong>and</strong> Valley<br />
Course projects<br />
March
Royal Porthcawl Mid Glamorgan, Wales<br />
Bunker restoration<br />
on the 5 th hole<br />
April
Furesø Copenhagen, Denmark<br />
Planning meeting for summer<br />
reconstruction contract<br />
April
Angus Glen Toronto, Canada<br />
Full 18 hole reconstruction<br />
planning visit<br />
April
Goodwood Ontario, Canada<br />
18th Hole fairway<br />
alignment adjustment<br />
April
Kedleston Park Derbyshire, Engl<strong>and</strong><br />
Appointed to prepare<br />
course audit<br />
April
Real Tenerife Canary Isl<strong>and</strong>s, Spain<br />
Detailed plans completed for<br />
Phase One construction<br />
April
Malmø Sweden<br />
European Institute of Golf Course<br />
Architects Annual Meeting<br />
Tom appointed as<br />
EIGCA Vice President<br />
April
Malmø Sweden<br />
European Institute of Golf Course<br />
Architects Annual Meeting<br />
Tom launches EIGCA<br />
Sustainability Register &<br />
Education Programme<br />
April
Gullane No 1 East Lothian, Scotl<strong>and</strong><br />
Appointed to advise Gullane<br />
on their No 1 Course<br />
April
Portmarnock Dublin, Irel<strong>and</strong><br />
Presentation of proposals<br />
to the Committee<br />
April
Vierumäki Finl<strong>and</strong><br />
Green reconstruction<br />
planning visit<br />
May
Vierumäki Finl<strong>and</strong><br />
Visualisation of conversion of<br />
sleepers to bunker<br />
May
Hill Side Finl<strong>and</strong><br />
Course assessment <strong>and</strong><br />
safety advisory visit<br />
May
Southport & Ainsdale Lancashire, Engl<strong>and</strong><br />
Bunker style conversion<br />
Before Photo<br />
May
Southport & Ainsdale Lancashire, Engl<strong>and</strong><br />
Bunker style conversion<br />
Visualisation<br />
May
Southport & Ainsdale Lancashire, Engl<strong>and</strong><br />
Bunker s<strong>and</strong> line<br />
marking out<br />
November
Southport & Ainsdale Lancashire, Engl<strong>and</strong><br />
The finished result<br />
December
Effingham Surrey, Engl<strong>and</strong><br />
New 5 th Green <strong>and</strong> 18 th Hole<br />
open on schedule<br />
Photo courtesy of Paul Hutchinson<br />
May
Cannes Mougin Côte d’Azur, France<br />
Visit to review tree removal work<br />
<strong>and</strong> masterplan proposals<br />
May
The Berkshire Berkshire, Engl<strong>and</strong><br />
Appointed to advise on various<br />
holes on the Red Course<br />
May
Fulford York, Engl<strong>and</strong><br />
Appointed to draw up<br />
a masterplan<br />
May
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
Concept plans prepared<br />
for future projects<br />
May
Royal Dornoch Sutherl<strong>and</strong> Scotl<strong>and</strong><br />
3 rd hole proposals presented<br />
to the members<br />
June
Royal St. George’s S<strong>and</strong>wich, Engl<strong>and</strong><br />
Advice regarding specific<br />
projects to a number of holes<br />
May
Rye East Sussex, Engl<strong>and</strong><br />
Jubilee Course proposals<br />
finalised<br />
May
Royal Mid-Surrey Surrey, Engl<strong>and</strong><br />
Reconstruction of the front nine<br />
on the Outer Course begins<br />
June
Royal County Down Newcastle, Northern Irel<strong>and</strong><br />
Three stunning new holes<br />
planned for the Annesley Links<br />
June
Royal County Down Newcastle, Northern Irel<strong>and</strong><br />
The new holes near the coast<br />
make room for a practice ground<br />
June
The Warren Essex, Engl<strong>and</strong><br />
Technical feasibility<br />
work underway<br />
June
Carnoustie Angus, Scotl<strong>and</strong><br />
Checking on the new<br />
Buddon Course holes<br />
June
Edzell Angus, Scotl<strong>and</strong><br />
A new 4 th green for this<br />
James Braid course<br />
July
Royal Mid-Surrey Surrey, Engl<strong>and</strong><br />
Work is well underway<br />
in excellent weather<br />
July
The Open at Muirfield<br />
A festival<br />
of true links golf<br />
July
The Open at Muirfield<br />
A worthy winner<br />
with a Champion’s final round<br />
July
Furesø Copenhagen, Denmark<br />
The 1 st on Parkvej Nine<br />
shapes up<br />
Original hole<br />
July
Furesø Copenhagen, Denmark<br />
The 1 st on Parkvej Nine<br />
shapes up<br />
After shaping<br />
July
Furesø Copenhagen, Denmark<br />
The 1 st on Parkvej Nine<br />
shapes up<br />
During establishment<br />
July
South Herts Hertfordshire, Engl<strong>and</strong><br />
Reshapes 8 th green surrounds<br />
New short game green<br />
CHANGE PICTURE<br />
July
Maidenhead Berkshire, Engl<strong>and</strong><br />
Appointed to prepare<br />
full course audit<br />
July
Calcot Park Berkshire, Engl<strong>and</strong><br />
Appointed to advise<br />
on 14 th hole<br />
July
Saunton Devon, Engl<strong>and</strong><br />
Appointed to advise on<br />
various holes on East Course<br />
July
Vierumäki Finl<strong>and</strong><br />
Masterplan for the Classic<br />
Course commissioned<br />
August
Imatran Golf Imatra, Finl<strong>and</strong><br />
Follow up visit after<br />
masterplan drawn up<br />
August
Golf At Goodwood Sussex, Engl<strong>and</strong><br />
Appointed to revamp bunkers<br />
<strong>and</strong> review course<br />
August
Grafarholt Reykjavik, Icel<strong>and</strong><br />
Appointed to advise Reykjavik<br />
The oldest club in Icel<strong>and</strong><br />
August
Burnham & Berrow Somerset, Engl<strong>and</strong><br />
Planning visit to extend<br />
the wonderful 16 th green<br />
August
The Berkshire Berkshire, Engl<strong>and</strong><br />
Further input on Red<br />
<strong>and</strong> Blue Courses<br />
August
Royal Lytham & St. Annes Lancashire, Engl<strong>and</strong><br />
Testing the course<br />
from The Open tees!<br />
August
Askernish South Uist, Outer Herbrides, Scotl<strong>and</strong><br />
Another visit made<br />
for The Askernish Open<br />
August
Royal Mid-Surrey Surrey, Engl<strong>and</strong><br />
The new wetl<strong>and</strong><br />
at the 8 th hole<br />
August
Angus Glen Toronto, Canada<br />
A flying start to the South<br />
Course reconstruction project<br />
August
National Golf Links of America Long Isl<strong>and</strong><br />
Walker Cup visit to this<br />
exceptional course<br />
August
Royal Belfast Northern Irel<strong>and</strong><br />
Ongoing advice<br />
on bunkering programme<br />
September
Gr<strong>and</strong> Ducal Luxembourg<br />
Phase 4 of bunker <strong>and</strong> green<br />
surrounds project starts<br />
September
Furesø Copenhagen, Denmark<br />
The 7 th on Parkvej Nine<br />
Original hole<br />
September
Furesø Copenhagen, Denmark<br />
The 7 th on Parkvej Nine<br />
During establishment<br />
September
Angus Glen Toronto, Canada<br />
A cycling architect on his<br />
morning inspection tour<br />
September
Angus Glen Toronto, Canada<br />
How many men <strong>and</strong> machines<br />
can work on one hole?<br />
September
Goodwood Ontario, Canada<br />
Martin’s first ever round<br />
over the course!<br />
September
Royal Mid-Surrey Surrey, Engl<strong>and</strong><br />
All front nine greens seeded<br />
<strong>and</strong> growing in<br />
September
Delamere Forest Cheshire, Engl<strong>and</strong><br />
Ridge lowered to make<br />
fairway visible on 3 rd hole<br />
September
Askernish South Uist, Scotl<strong>and</strong><br />
Teaching R&A Scholarship<br />
students about design<br />
September
Carnegie Abbey Rhode Isl<strong>and</strong>, USA<br />
5 year review of course<br />
September
Carnegie Abbey Rhode Isl<strong>and</strong>, USA<br />
Design <strong>and</strong> course<br />
presentation issues<br />
Its closely mown, firm<br />
green surrounds<br />
September
Angus Glen Toronto, Canada<br />
The 1st hole<br />
nearing completion<br />
October
Gr<strong>and</strong> Ducal Luxembourg<br />
Works completed on schedule<br />
October
Keilir Nr Reykjavik, Icel<strong>and</strong><br />
Advising on layout changes<br />
on back nine<br />
October
Keilir Nr Reykjavik, Icel<strong>and</strong><br />
The front nine me<strong>and</strong>ers<br />
through a lava field<br />
October
Vierumäki Finl<strong>and</strong><br />
4 th green reconstruction<br />
underway<br />
October
Angus Glen Toronto, Canada<br />
The 18 th green all put<br />
back together again<br />
October
Myopia Hunt & Golf Club Massachusetts, USA<br />
Not a client but 2 rounds<br />
played over this great course<br />
October
Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />
Works start on revision<br />
to 3 rd hole<br />
3 rd Tee Existing View<br />
October
Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />
To restore old view<br />
<strong>and</strong> alleviate a safety problem<br />
3 rd Tee Visualisation<br />
October
Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />
The bunkers are back in view<br />
<strong>and</strong> the fairway is rotated<br />
3 rd Tee Completed Works<br />
November
Furesø Copenhagen, Denmark<br />
The 6 th on Parkvej Nine<br />
Original hole<br />
October
Furesø Copenhagen, Denmark<br />
The 6 th on Parkvej Nine<br />
During shaping<br />
October
Furesø Copenhagen, Denmark<br />
The 6 th on Parkvej Nine<br />
After seeding<br />
October
Furesø Copenhagen, Denmark<br />
The 6 th on Parkvej Nine<br />
During establishment<br />
October
Angus Glen Toronto, Canada<br />
The 16 th hole illustrating the<br />
new bunker style<br />
October
Fulford York, Engl<strong>and</strong><br />
Restoration of the full bunker<br />
size at the 7 th hole<br />
October
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
The construction work for<br />
the 2016 Open gets underway<br />
October
Burnham & Berrow Somerset, Engl<strong>and</strong><br />
We do get involved in some<br />
manual work from time to time!<br />
November
Burnham & Berrow Somerset, Engl<strong>and</strong><br />
The finished extension<br />
to the 16 th green<br />
November
Kedleston Park Derbyshire, Engl<strong>and</strong><br />
Bunker re-construction<br />
starts on 1 st , 10 th <strong>and</strong> 11 th<br />
The hole before<br />
November
Kedleston Park Derbyshire, Engl<strong>and</strong><br />
Bunker re-construction<br />
starts on 1 st , 10 th <strong>and</strong> 11 th<br />
Work underway<br />
November
Vierumäki Finl<strong>and</strong><br />
Green reconstruction<br />
continues at the 16 th<br />
November
Pickala Finl<strong>and</strong><br />
Green reconstruction<br />
planning visit<br />
November
Delamere Forest Cheshire, Engl<strong>and</strong><br />
All bunkers are reshaped<br />
in 14 months<br />
The original greenside bunker<br />
November
Delamere Forest Cheshire, Engl<strong>and</strong><br />
Softer edges of bunkers<br />
are incorporated<br />
Work underway<br />
November
Delamere Forest Cheshire, Engl<strong>and</strong><br />
More than 50 bunkers<br />
in less than 12 weeks<br />
The bunker completed<br />
November
Noordwijkse, Holl<strong>and</strong><br />
A new back tee<br />
for the 18 th hole<br />
November
Royal Cinque Ports Deal, Engl<strong>and</strong><br />
Back tee<br />
project visit<br />
November
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
Golfers taking on<br />
the rebunkered 4 th hole<br />
November
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
The cycling architect on<br />
the new part of the 15 th fairway<br />
November
Gullane No 1 East Lothian, Scotl<strong>and</strong><br />
Bunkering on 8 th <strong>and</strong> 12 th<br />
underway<br />
November
Club de Golf Terramar Sitges, Spain<br />
New 18 th tee<br />
<strong>and</strong> fairway bunkers<br />
November
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
Photograph from the new<br />
dunes behind the 9 th green<br />
December
Hayling Hampshire, Engl<strong>and</strong><br />
Bunkering work on<br />
the 9 th <strong>and</strong> 15 th holes<br />
December
Delamere Forest Cheshire, Engl<strong>and</strong><br />
The bunkers had lost their<br />
old character over the years<br />
14 th approach before<br />
December
Delamere Forest Cheshire, Engl<strong>and</strong><br />
Minor adjustments create<br />
more pin positions<br />
14 th approach after<br />
December
Noord Nederl<strong>and</strong>se Glimmen, Holl<strong>and</strong><br />
Photograph from the new<br />
dunes behind the 9 th green<br />
December
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
First batch of turf<br />
laid on the 15 th fairway<br />
December
Golf Club Scotl<strong>and</strong> Slovakia<br />
Phase 2 preparations<br />
underway for 2014 construction<br />
December
Panmure Angus, Scotl<strong>and</strong><br />
The first rough edged bunker<br />
added to the reshaped 8 th<br />
December
Carnoustie Angus, Scotl<strong>and</strong><br />
The new 12 th hole on<br />
the Buddon Course<br />
December
Edzell Angus, Scotl<strong>and</strong><br />
Local soil <strong>and</strong> s<strong>and</strong> for root<br />
zone <strong>and</strong> cores for grassing<br />
December
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
Morning dawn lighting up the<br />
new approach bunker at the 4th<br />
December
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
Dr. Alister MacKenzie’s only<br />
work at an Open venue<br />
December
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
Recreation of the bunker<br />
feature underway<br />
December
Metro House<br />
Chichester<br />
West Sussex<br />
PO191BE<br />
Telephone<br />
01243 531901<br />
pitch<strong>and</strong>run18@aol.com<br />
www.mackenzie<strong>and</strong>bert.com<br />
@golfarchitects