11.04.2018 Views

2017 Annual Report of the Delaware River Basin Commission

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Review<br />

Withdrawals<br />

& Discharges<br />

The <strong>Delaware</strong> <strong>River</strong> <strong>Basin</strong> Compact provides in<br />

Section 3.8 that no project having a substantial<br />

effect on <strong>the</strong> water resources <strong>of</strong> <strong>the</strong> <strong>Basin</strong> shall<br />

be undertaken unless it shall have been first<br />

submitted to and approved by <strong>the</strong> <strong>Commission</strong>.<br />

These projects generally fall into one <strong>of</strong> two<br />

categories: water withdrawals (ground and/or<br />

surface water) or discharges (wastewater<br />

treatment). Occasionally, a project may be a<br />

combination <strong>of</strong> <strong>the</strong>se, or a project falls under<br />

ano<strong>the</strong>r category, such as pipelines.<br />

WITHDRAWAL<br />

Groundwater<br />

Ground & Surface<br />

Water<br />

Surface Water<br />

COMBINED DOCKETS<br />

IWTP and Groundwater<br />

Withdrawal<br />

DOCKET TYPES<br />

DISCHARGE<br />

Industrial<br />

Wastewater Treatment<br />

Plant (IWTP)<br />

Wastewater<br />

Treatment Plant<br />

OTHER DOCKETS<br />

O<strong>the</strong>r<br />

Pipeline<br />

26 VALUE<br />

THROUGHOUT THE YEAR<br />

88<br />

In <strong>2017</strong>, DRBC approved<br />

dockets.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!