taken to ensure the proper polymer<br />

would be selected to optimize the<br />

dewatering process once it had begun.<br />

As the sludge is being dredged from the<br />

lagoon bottom, an environmentally<br />

friendly polymer is added prior to the<br />

Geotube to promote sludge thickening.<br />

In this case, there were 2850 kg’s of a<br />

cationic ‘CA475’ polymer used. After all<br />

the preliminary groundwork was done, it<br />

was time to get the process underway.<br />

-textile tube that allows the<br />

ving the biosolids trapped<br />

solidate biosolids, silts, and<br />

d industrial).” -<br />

on-desludging/dewatering/<br />

The dewatering crew was scheduled to<br />

be on site in late September. This gave<br />

City staff ample time to prepare a<br />

detailed ‘laydown area’ for the Geotubes.<br />

A location was chosen directly west of<br />

the lagoon bank, between the lagoon<br />

cell and the SC Creek. The laydown area<br />

was bladed to the proper grade to allow<br />

drainage of the decanted water, and the<br />

City crews were careful to build a berm<br />

around the perimeter so as not to allow<br />

any of the water to mistakenly run into<br />

the creek. To ensure there wouldn’t be