consulting services for a technical assessment of the stills at the ...
consulting services for a technical assessment of the stills at the ...
consulting services for a technical assessment of the stills at the ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4. Recommend<strong>at</strong>ions<br />
4.1 General facility<br />
The facility, being built be<strong>for</strong>e <strong>the</strong> actual arrival and install<strong>at</strong>ion <strong>of</strong> <strong>the</strong> <strong>stills</strong>, will need some minor<br />
changes to cre<strong>at</strong>e a user-friendly and safe working environment, based on <strong>the</strong> findings <strong>of</strong> this<br />
<strong>assessment</strong> it is <strong>the</strong>re<strong>for</strong>e recommended th<strong>at</strong>:<br />
1. The 5KA r<strong>at</strong>ing electrical breaker in distill<strong>at</strong>ion room and in <strong>the</strong> main box needs to be upgraded to a<br />
breaker with a 15KA r<strong>at</strong>ing due to <strong>the</strong> type <strong>of</strong> boiler used as it causes fluctu<strong>at</strong>ions in Amperage, this<br />
change was discussed with <strong>the</strong> contractor in Opuwo,<br />
2. The w<strong>at</strong>er supply system be modified to facilit<strong>at</strong>e <strong>the</strong> movement <strong>of</strong> <strong>the</strong> boiler which has already<br />
been discussed with a contractor in Opuwo,<br />
3. Depending on <strong>the</strong> results <strong>of</strong> <strong>the</strong> w<strong>at</strong>er analysis a w<strong>at</strong>er purific<strong>at</strong>ion unit (such as w<strong>at</strong>er s<strong>of</strong>tener to<br />
remove lime and Reverse Osmosis to bring down <strong>the</strong> TDS) to supply <strong>the</strong> boiler with suitable quality<br />
w<strong>at</strong>er needs to be installed,<br />
4. Upgrading <strong>of</strong> w<strong>at</strong>er tanks from 5000 ℓ -10000ℓ <strong>for</strong> sufficient w<strong>at</strong>er supply <strong>for</strong> cooling as <strong>the</strong>re is not<br />
sufficient supply <strong>for</strong> a full day’s worth <strong>of</strong> oper<strong>at</strong>ing <strong>the</strong> <strong>stills</strong>,<br />
5. After discussions with contractor in Opuwo a suitable solution was reached to modify <strong>the</strong> floor by<br />
cutting channels into so th<strong>at</strong> <strong>the</strong> excess w<strong>at</strong>er (from <strong>the</strong> boiler and cleaning) can drain out <strong>of</strong> <strong>the</strong><br />
processing room thus cre<strong>at</strong>ing a safer working environment,<br />
6. Cre<strong>at</strong>e a simple method <strong>for</strong> removing spent plant m<strong>at</strong>erial from <strong>the</strong> facility and floor to a waste or<br />
composting site after each distill<strong>at</strong>ion procedure by cre<strong>at</strong>ing some ramps <strong>for</strong> a fl<strong>at</strong> bed wheel<br />
barrow type vehicle which can <strong>the</strong>n be tipped into a waiting trailer <strong>for</strong> removal from <strong>the</strong> site, if<br />
necessary, not withstanding th<strong>at</strong> this “waste m<strong>at</strong>erial” could also be valuable on its own. Ei<strong>the</strong>r way<br />
a suitable storage area or dump area will need to be identified;<br />
7. Standard oper<strong>at</strong>ing procedures will have to be established to produce a product <strong>of</strong> uni<strong>for</strong>m quality<br />
and to determine <strong>the</strong> cost <strong>of</strong> production in order to be able to calcul<strong>at</strong>e a sales price;<br />
8. A business plan should be put toge<strong>the</strong>r <strong>for</strong> future changes to improve productivity and <strong>for</strong> <strong>the</strong><br />
marketing <strong>of</strong> <strong>the</strong> oil.<br />
4.2 Mopane distill<strong>at</strong>ion<br />
The mopane distill<strong>at</strong>ion system seems to functioning well and only a couple <strong>of</strong> minor changes needs to<br />
be implemented on <strong>the</strong> pre-processing and on <strong>the</strong> baskets <strong>for</strong> loading and unloading, based on <strong>the</strong><br />
findings <strong>of</strong> this <strong>assessment</strong> it is <strong>the</strong>re<strong>for</strong>e recommended th<strong>at</strong>:<br />
1. The crushed Mopane seeds are <strong>the</strong> best <strong>for</strong> distill<strong>at</strong>ion in yield/weight and ease and speed <strong>of</strong><br />
processing, although more trials should be done with size <strong>of</strong> pre-processing,<br />
2. Oil samples should be tested <strong>for</strong> quality and also be sent to prospective buyers,<br />
Report on <strong>the</strong> Technical Assessment <strong>of</strong> <strong>the</strong> Stills <strong>at</strong> <strong>the</strong> Opuwo Processing Facility (April 2011) Page 7