The Commiphora hydro still<br />

The Commiphora still was originally designed to work as a hydro still where <strong>the</strong> product is submersed in<br />

w<strong>at</strong>er in a single basket. After trials it was decide th<strong>at</strong> this method was not sufficient <strong>for</strong> oil extraction<br />

and cre<strong>at</strong>ed gre<strong>at</strong> difficulty during <strong>the</strong> cleaning process. The modific<strong>at</strong>ions will allow <strong>the</strong> still to oper<strong>at</strong>e<br />

as a steam still; although not ideal it is a workable solution <strong>for</strong> <strong>the</strong> immedi<strong>at</strong>e future.<br />

3. Main Findings<br />

3.1 General<br />

During <strong>the</strong> inspection, cleaning and steam cleaning (running <strong>the</strong> distill<strong>at</strong>ion units with empty pots and<br />

no cooling) it was established th<strong>at</strong>:<br />

1. The electric breaker in <strong>the</strong> actual distill<strong>at</strong>ion room and on <strong>the</strong> main box was insufficient and will<br />

need to be upgraded,<br />

2. The quality <strong>of</strong> <strong>the</strong> w<strong>at</strong>er feeding <strong>the</strong> boiler is not good enough and some <strong>for</strong>m <strong>of</strong> purific<strong>at</strong>ion will be<br />

needed. A w<strong>at</strong>er sample was taken and analysed by a lab where it was noted th<strong>at</strong> it has a high lime<br />

content and Total Dissolved Solids (TDS) level, pending subsequent discussions with experts a<br />

solution needs to be implemented,<br />

3. Changes to <strong>the</strong> plumbing <strong>of</strong> <strong>the</strong> feed w<strong>at</strong>er to <strong>the</strong> boiler and to <strong>the</strong> cooling w<strong>at</strong>er <strong>for</strong> <strong>the</strong> condenser<br />

will be required,<br />

4. Drainage measures need to be taken to cre<strong>at</strong>e a safe and clean working environment.<br />

Report on <strong>the</strong> Technical Assessment <strong>of</strong> <strong>the</strong> Stills <strong>at</strong> <strong>the</strong> Opuwo Processing Facility (April 2011) Page 5