16.12.2012 Views

Prisma II Chassis 56-Port Upgrade Technical Bulletin - DNIP . NET

Prisma II Chassis 56-Port Upgrade Technical Bulletin - DNIP . NET

Prisma II Chassis 56-Port Upgrade Technical Bulletin - DNIP . NET

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Chassis</strong> <strong>Upgrade</strong> Procedure, Continued<br />

12. Tighten the 10 captive screws that secure the RF connector back panel to the<br />

chassis.<br />

Result: The <strong>Prisma</strong> <strong>II</strong> <strong>Chassis</strong> has been upgraded to a <strong>56</strong>-port chassis.<br />

6 <strong>Prisma</strong> <strong>II</strong> <strong>Chassis</strong> <strong>56</strong>-<strong>Port</strong> <strong>Upgrade</strong> <strong>Technical</strong> <strong>Bulletin</strong> 4010254 Rev C

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!