27.10.2018 Views

CONSTITUENCY 5

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DENTAL OUTREACH<br />

The Constituency Office of<br />

Constituency 5 assisted in spearing<br />

the first dental outreach for 2018.<br />

This outreach targeted students from<br />

the schools in the constituency and<br />

residents.<br />

UNIVERSITY OF GUYANA STUDENTS<br />

INTERVENTION PROJECTS<br />

2 Groups of Final Year University of<br />

Guyana Students completed projects<br />

within the Constuency as part of their<br />

final year studies at the University<br />

Their project would have covered 3<br />

main areas of focus<br />

*Pregnant Teens Support &<br />

Empowerment<br />

*Safety and Environment<br />

12<br />

FOCAL SESSION WITH TIPS UNIT –<br />

Min. of Social Protection<br />

The Constituency benefited from<br />

a Public Education session on<br />

Trafficking In Persons (TIPS) which<br />

was conducted by the Ministry of<br />

Social Protection<br />

SQUATTERS ENGAGEMENT / REGISTER<br />

OF PERSONS ON THE RESERVE.<br />

As a result of the Ministry of<br />

Communities Department of Housing<br />

operations to resettle squatters from<br />

the reserves in Constituency 5 a<br />

register of persons on the reserve<br />

was drafted as the engagement were<br />

steered via the engagement of the<br />

Constituency Office which resolved<br />

to have the untenable situation com<br />

to a resolution where all the residents<br />

were satisfied and the Ministry was<br />

able to exercise their mandate<br />

TRAINING – PROJECT<br />

WRITING BY ANTOL (CSSP)<br />

Several person from the communities<br />

in Constituency 5 were trained<br />

in Project Writing, Community<br />

Crime Prevention and Confliction<br />

Management.<br />

INFRASTRUCTURAL ASSESSMENT –<br />

ROAD & DRAINAGE NETWORK<br />

An evaluation assessment was<br />

done and consultation initiated<br />

on the infrastructural needs and<br />

sustainability works on the drainage<br />

system and the road network system.<br />

The Constituency Representative<br />

has been making periodic visits to<br />

review the status of all interceptive<br />

works being carried out by the<br />

engineers from the Ministry of Public<br />

Infrastructure<br />

S<br />

(<br />

P<br />

T<br />

T<br />

t<br />

“<br />

m<br />

“<br />

l<br />

i<br />

b<br />

C<br />

a<br />

L<br />

e<br />

T<br />

L<br />

T<br />

P<br />

a

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!