13.12.2018 Views

E & G Real Estate office market report Stuttgart 2017-2018

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Wangen/Hedelfingen<br />

Low vacancy rates and a lack of new<br />

space meant the Wangen/Hedelfingen<br />

sub<strong>market</strong> was not particularly<br />

dynamic. At approx. 11 000 m² total<br />

take-up was significantly below<br />

the 10-year average of 20 500 m².<br />

Southern <strong>Stuttgart</strong> – a popular area. Development worthwhile.<br />

Degerloch<br />

In <strong>2017</strong> take-up in the area was 9 700<br />

m², representing an increase of 27 % over<br />

2016. All of the corresponding contracts<br />

were, however, for properties around<br />

the Albplatz square, since space in the<br />

rest of the district remains very scarce.<br />

Thanks to its good infrastructure Degerloch<br />

continues to offer potential and<br />

probably a decisive factor in the new letting<br />

transactions which took place. Development<br />

projects in the Albplatz area,<br />

which have remained at the planning<br />

stage for some years now, seem to be<br />

making progress and the first changes<br />

can be expected in the next few years.<br />

The recent announcement that law firm<br />

CMS Hasche Siegle has signed a contract<br />

for premises in <strong>Stuttgart</strong>’s central business<br />

district will result in further changes<br />

around Albplatz; they will, however,<br />

only have an impact from approx. 2022<br />

onwards. Overall, thanks to its good infrastructure<br />

and local shopping amenities<br />

the district remains popular with a<br />

wide range of users and further positive<br />

development is expected.<br />

Leinfelden-Echterdingen<br />

At the end of <strong>2017</strong> the new-build space<br />

created by the “SkyLoop” and “SkyPort”<br />

projects at <strong>Stuttgart</strong> Airport had been<br />

almost fully let. In response to this, the<br />

possibility of further development of currently<br />

vacant plots around the airport is<br />

under consideration. A number of development<br />

projects in recent years have<br />

resulted in a significant upgrading of Echterdingen’s<br />

industrial park. January <strong>2017</strong>,<br />

for example, saw the opening of the<br />

Moxy Hotel in Dieselstrasse, while the<br />

neighbouring former “Brixner Complex”,<br />

located directly adjacent to the Leinfelden-Echterdingen<br />

motorway exit, was<br />

<strong>Stuttgart</strong> – Central I 23<br />

In previous years take-up has been tes will allow higher-quality use in<br />

characterized by projects which are the form of modern <strong>office</strong> space to<br />

currently under construction. Changes<br />

take place.<br />

in take-up are not expected to A further project, whose industrial<br />

occur until new projects commence. character makes it unusual, is underway<br />

Two developments are currently foreseeable<br />

in neighbouring Obertürk-<br />

in Ulmer Strasse, where heim – the “Hammerwerk”.<br />

the demolition of old production si-<br />

Degerloch < 500 m 2 501 - 1,000 m 2 1,001 - 2,000 m 2 2,001 - 5,000 m 2 > 5,001 m 2<br />

% share of space 0 % 0 % 15 % 0 % 85 %<br />

m 2 0 0 1,466 0 8,190<br />

Ø rental price 11.90 €/m 2<br />

With rental take-up of 18 600 m² in <strong>2017</strong><br />

Fasanenhof’s industrial park was able to<br />

achieve almost match its performance of<br />

the previous year. The upturn which was<br />

already being forecast some years ago appears<br />

to be making steady progress, with<br />

the co-working concept established in<br />

2016 proving very popular. In combination<br />

with the GFT AG start-up incubator Fasanenhof<br />

now has two buildings serving<br />

young start-up companies at different stages<br />

of their development. A diverse range<br />

of restaurants offer many options for workers’<br />

daily needs.<br />

At 22 the number of contracts concluded<br />

is similar to the statistics for previous ye-<br />

Leinfelden-<br />

Echterdingen<br />

sold in 2016. Scheduled for completion<br />

in <strong>2018</strong> the modern new <strong>office</strong> complex,<br />

comprising three buildings with a total<br />

area of approx. 26 000 m², will function<br />

as a “gateway” to the industrial park and<br />

looks set to give the area a smarter appearance.<br />

One building, accounting for<br />

some 30 % of the total area, has already<br />

been fully let even before construction<br />

has begun. Completion of the campus is<br />

scheduled for 2020/2021.<br />

In <strong>2017</strong> Daimler AG acquired a plot in<br />

the Leinfelden area, with the objective<br />

of developing the “Daimler Truck Campus”,<br />

a central site for its entire truck division<br />

which will have a total of some 50<br />

000 m² floor space and is scheduled for<br />

completion by 2021. A total of 63 100<br />

m² of <strong>office</strong> space was let in the entire<br />

Leinfelden-Echterdingen district, which<br />

also includes <strong>Stuttgart</strong> Airport, in <strong>2017</strong>.<br />

This represents an increase of 76 % over<br />

the previous year, whereby the 10-year<br />

< 500 m 2 501 - 1,000 m 2 1,001 - 2,000 m 2 2,001 - 5,000 m 2 > 5,001 m 2<br />

% share of space 1 % 4 % 13 % 0 % 82 %<br />

m 2 257 2,561 8,671 0 51,500<br />

Ø rental price 12.20 €/m 2<br />

Prime rent 15.90 €/m 2<br />

Fasanenhof < 500 m 2 501 - 1,000 m 2 1,001 - 2,000 m 2 2,001 - 5,000 m 2 > 5,001 m 2<br />

% share of space 22 % 0 % 26 % 0 % 52 %<br />

m 2 3,985 0 4,807 0 9,648<br />

Ø rental price 12.20 €/m 2<br />

Prime rent 13.50 €/m 2<br />

average for the district is around 16 400<br />

m². Pressure on the <strong>market</strong> makes shortterm<br />

development in this location an interesting<br />

option.<br />

Fasanenhof

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!