DESIGN
0.16
0.16
PVC Pipes
16 CM Diameter
1
0.24 0.41 0.40 0.56
0.24 0.26 0.16
0.40
0.40
Detail 1- Bottom
1 : 10
0.16 0.30 0.30 0.16
0.09 0.11 0.16 0.59 0.16 0.11 0.09
0.05
0.07
0.07 1.15 0.07
0.45
0.07 0.35
1.01
0.14
0.42 0.46 0.42
1.30
Existing concrete column
50 X 50 CM
Existing facade
Concrete core, insulation &
finishing
U-Profile
UPA 150X75X6
Insulation 5 CM thick
Phenolic foam
Fan for air exhaust
Diameter 20 CM
Aluminum ribs (7.0 x 0.6 CM)
At every 1.65 M of module
Aluminum sheet 0.4 CM thick
Black paint finish & coating
PV Panels
0.3 CM thick
Existing concrete column
50 X 50 CM
0.02 0.51 0.51
0.02
Copper pipes 2 CM Diameter
Cold water input
Warm water output
0.40
0.16
0.50
0.24 0.26 0.16
0.40
0.14 1.02 0.14
0.09 1.13 0.09
0.07
0.45
0.07
0.07
0.35
0.15
1.15
0.41
0.07
Existing facade
Concrete core, insulation &
finishing
U-Profile
UPA 150X75X6
Insulation 5 CM thick
Phenolic foam
Tube & Shell heat exchanger
39 x 57 CM box
Cooper pipes
Aluminum ribs (7.0 x 0.6 CM)
At every 1.65 M of module
2
Detail 2- Top
1 : 10
0.42 0.46 0.42
1.30
Aluminum sheet 0.4 CM thick
Black paint finish & coating
FIGURE 24: DETAIL - BOTTOM & TOP
22