10.02.2020 Views

ARDIENTE

Group Work - See inside

Group Work - See inside

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DESIGN

0.16

0.16

PVC Pipes

16 CM Diameter

1

0.24 0.41 0.40 0.56

0.24 0.26 0.16

0.40

0.40

Detail 1- Bottom

1 : 10

0.16 0.30 0.30 0.16

0.09 0.11 0.16 0.59 0.16 0.11 0.09

0.05

0.07

0.07 1.15 0.07

0.45

0.07 0.35

1.01

0.14

0.42 0.46 0.42

1.30

Existing concrete column

50 X 50 CM

Existing facade

Concrete core, insulation &

finishing

U-Profile

UPA 150X75X6

Insulation 5 CM thick

Phenolic foam

Fan for air exhaust

Diameter 20 CM

Aluminum ribs (7.0 x 0.6 CM)

At every 1.65 M of module

Aluminum sheet 0.4 CM thick

Black paint finish & coating

PV Panels

0.3 CM thick

Existing concrete column

50 X 50 CM

0.02 0.51 0.51

0.02

Copper pipes 2 CM Diameter

Cold water input

Warm water output

0.40

0.16

0.50

0.24 0.26 0.16

0.40

0.14 1.02 0.14

0.09 1.13 0.09

0.07

0.45

0.07

0.07

0.35

0.15

1.15

0.41

0.07

Existing facade

Concrete core, insulation &

finishing

U-Profile

UPA 150X75X6

Insulation 5 CM thick

Phenolic foam

Tube & Shell heat exchanger

39 x 57 CM box

Cooper pipes

Aluminum ribs (7.0 x 0.6 CM)

At every 1.65 M of module

2

Detail 2- Top

1 : 10

0.42 0.46 0.42

1.30

Aluminum sheet 0.4 CM thick

Black paint finish & coating

FIGURE 24: DETAIL - BOTTOM & TOP

22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!