Safety <strong>Report</strong> <strong>June</strong> <strong>2020</strong><br />
Issued July <strong>2020</strong><br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
ANTHONY<br />
TORRES<br />
DEMOLTION<br />
ANTHONY TORRES DEMOLITION CORP | 1807 MOUNT VERNON AVE POMONA CA 91768
<strong>Anthony</strong> <strong>Torres</strong><br />
<strong>Demolition</strong><br />
<strong>June</strong> <strong>2020</strong><br />
SAFETY COMMITTEE MEETINGS
www.thepriceofsafety.com<br />
info@thepriceofsafety.com<br />
The Price of Safety Inc - Safety Committee Meeting Minutes<br />
JULY 21, <strong>2020</strong><br />
1807 MOUNT VERNON AVE,<br />
POMONA CA 91768<br />
MEETING CALLED BY<br />
TYPE OF MEETING<br />
FACILITATOR<br />
NOTE TAKER<br />
NEXT MEETING<br />
ATTENDEES<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong> & The Price of Safety, Inc.<br />
Safety Committee Meeting<br />
Mayra Martinez<br />
Mayra Martinez<br />
TBD<br />
Mayra Martinez, Sandra Castillo, Susan <strong>Torres</strong>, John <strong>Torres</strong>, Erica Pompa<br />
Old Business<br />
COMMUNICATION &<br />
COORDINATION<br />
MAYRA MARTINEZ<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong> management opted to not hold a Safety Committee Meeting and address<br />
important topics via email.<br />
Please see below New Business Section below.<br />
6.1 The Safety Committee Meeting for the month of April has been postponed by ATD Management until<br />
further notice.<br />
DISCUSSION<br />
New Business to be discussed:<br />
• COVID 19 Meeting and Training Adjustments<br />
• Bobcat and/ or Heavy Machinery fire extinguisher placement.<br />
Update:<br />
• Abel Castro Operator Certification for Earthmoving equipment. (Pending)<br />
• OSHA-300 Log Submittal Process with Sandra and Erica. ATD Management Team was interested in<br />
knowing the process for submitting the OSHA-300 Log for future reference. (OSHA-300 Log was submitted<br />
in March <strong>2020</strong>)<br />
ACTION ITEMS PERSON RESPONSIBLE DEADLINE<br />
First Aid Kit Inspection and Standards<br />
Mayra Martinez<br />
Onsite<br />
July <strong>2020</strong><br />
Fuel Storage with Proper Housekeeping and Signage ATD Complete<br />
Forklift #268B Back-up Alarm ATD Complete<br />
Certify Forklift Operators in Yard (Victor Escobar: Pending) John <strong>Torres</strong> July <strong>2020</strong><br />
Prepared by The Price of Safety on behalf of <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
Re-certify/Certify employees involved in Boom-lift Incident John <strong>Torres</strong> July <strong>2020</strong><br />
OSHA-300 Log Submittal Process w/ Sandra and Erica ATD/ Mayra Martinez July <strong>2020</strong><br />
Asuncion Corona: Dental Appointments<br />
Asuncion Corona/ATD<br />
Appointment<br />
Pending<br />
SAFETY EVALUATIONS REVIEW<br />
6.2The Price of Safety Performed the following Safety Evaluations for the month of May <strong>2020</strong>:<br />
1. 5/12/<strong>2020</strong> Mayra Martinez performed SER @ Chino Hills /Foreman: Abel Castro<br />
(Please Review SER) 2 Failed items | 2 Abated items | Inspection Score: 95.65%<br />
2. 5/14//<strong>2020</strong> Mayra Martinez performed SER @ Chino Hills / Foreman: Sixtos Molina<br />
(Please Review SER) 0 Failed items | 0 Abated items | Inspection Score: 100%<br />
3. 5/14/<strong>2020</strong> Mayra Martinez performed SER @ Miramonte / Foreman: Juan Duarte<br />
(Please Review SER) 2 Failed items | 2 Abated items| Inspection Score: 94.87%<br />
4. 5/18/<strong>2020</strong> Mayra Martinez performed SER @ Glendale /Foreman: Jesus Pineda<br />
(Please Review SER) 4 Failed item | 4 Abated items | Inspection Score: 90.24%<br />
5. 5/18/<strong>2020</strong> Mayra Martinez performed SER @ Irvine / Foreman: Juan Duarte<br />
(Please Review SER) 3 Failed items | 2 Abated items | Inspection Score: 90.91%<br />
6. 5/18/<strong>2020</strong> Mayra Martinez performed SER @ Anaheim /Foreman: Teodocio Mendoza<br />
(Please Review SER) 1 Failed items | 1 Abated item | Inspection Score: 97.44%<br />
7. 5/20/<strong>2020</strong> Mayra Martinez performed SER @ Tarzana /Foreman: Abel Castro<br />
(Please Review SER) 2 Failed items | 2 Abated items | Inspection Score: 95.12%<br />
8. 5/27/<strong>2020</strong> Mayra Martinez performed SER @ Chino Hills /Foreman: Sixtos Molina<br />
(Please Review SER) 2 Failed items | 2 Abated items | Inspection Score: 95.12%<br />
DISCUSSION<br />
6.3 The Price of Safety Performed the following Safety Evaluations for the month of <strong>June</strong> <strong>2020</strong>:<br />
1. 6/1/<strong>2020</strong> Sean Carr performed SER @ Azusa /Foreman: Teodocio Mendoza<br />
(Please Review SER) 1 Failed items | 1 Abated item | Inspection Score: 97.3%<br />
2. 6/1/<strong>2020</strong> Sean Carr performed SER @ Pasadena / Foreman: Jesus Pineda<br />
(Please Review SER) 2 Failed items | 2 Abated items | Inspection Score: 94.74%<br />
3. 6/3/<strong>2020</strong> Sean Carr performed SER @ Lake Elsinore / Foreman: Sixtos Molina<br />
(Please Review SER) 2 Failed items | 2 Abated items| Inspection Score: 95.35%<br />
4. 6/5/<strong>2020</strong> Sean Carr performed SER @ Culver City /Foreman: Abel Castro<br />
(Please Review SER) 2 Failed item | 2 Abated items | Inspection Score: 97.14%<br />
5. 6/5/<strong>2020</strong> Sean Carr performed SER @ Inglewood / Foreman: Andrew <strong>Torres</strong><br />
(Please Review SER) 2 Failed items | 2 Abated items | Inspection Score: 94.29%<br />
6. 6/8/<strong>2020</strong> Sean Carr performed SER @ Oceanside /Foreman: Jesus Pineda<br />
(Please Review SER) 1 Failed items | 1 Abated item | Inspection Score: 94.87%<br />
7. 6/8/<strong>2020</strong> Sean Carr performed SER @ Norwalk /Foreman: Teodocio Mendoza<br />
(Please Review SER) 3 Failed items | 2 Abated items | Inspection Score: 92.31%<br />
8. 6/23/<strong>2020</strong> Mayra Martinez performed SER @ San Dimas /Foreman: Jesus Pineda<br />
(Please Review SER) 2 Failed items | 2 Abated items | Inspection Score: 95.12%<br />
Prepared by The Price of Safety on behalf of <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
Although an average score of 94.8% is great improvement, the following deficiencies were found on site. Means and<br />
methods will be put in place and implemented to reduce these deficiencies in the future. (See Synopsis)<br />
CONCLUSIONS<br />
Site Deficiencies:<br />
• Fire Extinguisher<br />
• GFCI<br />
• Tool Guards<br />
• Impalements<br />
• COIVD19<br />
• Fall Hazards<br />
• Heat Illness Protection<br />
• Floor Openings<br />
• Access to Site<br />
ACTION ITEMS PERSON RESPONSIBLE DEADLINE<br />
Abel Castro Operator Certification <strong>Anthony</strong> <strong>Torres</strong> Demo. Complete<br />
On-Site Training Mayra Martinez Ongoing<br />
TRAINING REVIEW<br />
6.4 Heat Illness Prevention<br />
Due to CDC COVID19 Social Distancing requirements, <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong> Management has postponed<br />
training until further notice.<br />
Weekly Safety Meetings were sent to Sandra Castillo on 5/29/<strong>2020</strong>.<br />
DISCUSSION<br />
The Topics included the following:<br />
1. Personal Protective Equipment: Eye Safety<br />
2. Impact Hazards<br />
3. Heat Injuries<br />
4. Chemical Injuries<br />
5. Additional Tips to Remember<br />
CONCLUSIONS All foremen have received the safety toolbox meetings and they are to be complete by 7:30am every Monday.<br />
ACTION ITEMS PERSON RESPONSIBLE DEADLINE<br />
Fall Protection Training – On Site Mayra Martinez/ ATD July <strong>2020</strong><br />
MEANS AND METHODS<br />
6.5 Virtual Evaluations and Follow-ups<br />
Virtual Evaluations were conducted in the month of May to follow-up and ensure the proper protocol and<br />
procedures were being implemented for:<br />
DISCUSSION<br />
1.) Follow up- Qualified Forklift Operator: Foreman Abel Castro did not have a Competent Peron’s Certificate<br />
for Earthmoving Equipment, while witnessed operating a bobcat.<br />
- Mayra Martinez advised ATD Management of the lack of qualification to operate the heavy machinery,<br />
and Abel received certification materials and a test.<br />
2.) A virtual evaluation was conducted with Foreman Teodocio Mendoza on <strong>June</strong> 12, <strong>2020</strong>. The crew was<br />
working Norwalk, and the weather was over 90 degrees. The crew did not have sufficient shade.<br />
-Mayra Martinez contacted the yard steward, Victor Escobar and ATD Management to advise that the crew<br />
needs to be given canopies for shade to prevent high heat illness. Pictures and suggestions were sent to<br />
Sandra Castillo.<br />
Prepared by The Price of Safety on behalf of <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
CONCLUSIONS<br />
1.) Abel completed and passed his test, resulting in becoming a certified Heavy Machinery/Earthmoving<br />
equipment competent person.<br />
2.) ATD did not have additional canopies in the yard to send out with the crew for the following day. Sandra<br />
Castillo stated she would discuss canopy purchases with the ATD Management.<br />
Mayra Martinez followed-up with Teodocio Mendoza, he stated canopies were not provided, however, they<br />
were able to find shaded areas.<br />
ACTION ITEMS PERSON RESPONSIBLE DEADLINE<br />
New Business<br />
DISCUSSION<br />
5.1<br />
• On-Site Training<br />
• Heavy Machinery Fire Extinguishers<br />
CONCLUSIONS<br />
ACTION ITEMS PERSON RESPONSIBLE DEADLINE<br />
Prepared by The Price of Safety on behalf of <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
SAFETY SYNOPSIS
ANTHONY TORRES SAFETY SYNOPSIS<br />
<strong>June</strong> <strong>2020</strong><br />
Below are our suggestions for mitigation strategies that ATD can implement during the second quarter of <strong>2020</strong>.<br />
To effectively mitigate and control workplace safety risks, we will continue training on the project- risk mitigation plans before<br />
employees are exposed to risks. Construction hazards can potentially increase risks and lead to workplace injuries. A clear<br />
understanding of hazards, risks, and types of potential impacting factors provide the foundation for developing an effective risk<br />
mitigation plan.<br />
Summary of Means<br />
The means that will be used for barrier identification<br />
include:<br />
• Virtual Safety Evaluations<br />
• Foreman Follow up/ Deficiencies and<br />
challenges<br />
These measures will help us ascertain the leading<br />
and lagging indicators to help reduce incidents and<br />
injuries<br />
Summary of Recommendations<br />
Based on data collected and forecasted scope of<br />
work, we recommend <strong>Anthony</strong> <strong>Torres</strong> implement<br />
the following mitigation strategies:<br />
• COVID19: Alternative Virtual Meetings<br />
• Heat Illness Training<br />
• Operator Certifications<br />
• Heat Illness Prevention: Canopies<br />
Analytics<br />
Prepared by The Price of Safety on behalf of <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
SAFETY<br />
PERFORMANCE
Monthly Safety Performance <strong>Report</strong><br />
Note: This report summarizes the Safe and Failed items.<br />
<strong>June</strong> <strong>2020</strong> <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong> 06.01.<strong>2020</strong>-06.30.<strong>2020</strong><br />
Jobsites Evaluated<br />
Foreman Location Results Company Notified<br />
Teodocio Mendoza Azusa 97.3%% / 1 Failled Item / 1 Abated Sandra Castillo<br />
Jesus Pineda Pasadena 94.74% / 2 Failed Items / 2 Abated Sandra Castillo<br />
Sixtos Molina Lake Elsinore 95.35% / 2 Failed Item / 2 Abated Sandra Castillo<br />
Abel Castro Culver City 98% / 1 Failed Items / 1 Abated Sandra Castillo<br />
Andrew <strong>Torres</strong> Ingle Wood 94.29% / 2 Failed Items / 1 Abated Sandra Castillo<br />
Jesus Pineda Oceanside 94.87% / 1 Failed Item / 1 Abated Sandra Castillo<br />
Teodocio Mendoza Norwalk 100% / 0 Failed Items / 0 Abated Sandra Castillo<br />
Abel Castro Tarzana 92.31% / 2 Failed Item / 2 Abated Sandra Castillo<br />
Prepared by The Price of Safety on behalf of <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
SITE STATISTICS
Site Statistics <strong>June</strong> <strong>2020</strong><br />
QUARTERLY SUMMARY RESU LTS<br />
This report focuses on the quarterly progress for <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong> and reflects the safety site statistics per jobsite.<br />
The criteria will help identify the leading indicators, such as training, evaluations, and surveys, and will assist in<br />
creating proactive and conceptual safety strategies that will decrease incidents and ascertain training recommendations.<br />
Foreman April May <strong>June</strong><br />
Teodocio Mendoza 100%,95%,100% 97.44% 97.3%,92.3%<br />
Abel Castro 97.62% 95.65%, 95.12% 97.14%<br />
Sixtos Molina 100%,100% 100%, 95.12% 95.35%<br />
Jesus Pineda 95%, 100% 90.24% 94.74%,94%,95%<br />
Juan Duarte N/A 90.24%,90.91% N/A<br />
Sergio Duarte N/A N/A N/A<br />
Andrew <strong>Torres</strong> N/A N/A 94.29%<br />
Prepared by The Price of Safety on behalf of <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
Prepared by The Price of Safety on behalf of <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com<br />
Site Statistics <strong>June</strong> <strong>2020</strong>
SAFETY EVALUATION<br />
REPORTS
Safety Evaluation <strong>Report</strong> (SER)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong>/ Inglewood / 5 Jun <strong>2020</strong><br />
/ Sean Carr Complete<br />
Score 94.29% Failed items 2 Actions<br />
0<br />
Client / Site<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong>/<br />
Inglewood<br />
Date of Audit 5th Jun, <strong>2020</strong><br />
Prepared by<br />
Location<br />
Sean Carr<br />
700–728 W Spruce Ave<br />
Inglewood CA 90301<br />
United States<br />
(33.95500479734871, -<br />
118.36817300889489)<br />
Private & Confidential 1/20
Failed Items<br />
2 failed<br />
C. Daily pre-use inspections done and documented.1926.601(b)(14),<br />
Cal/Osha Article 10. Haulage and Earth Moving §1593.<br />
DEFICIENT<br />
2)Hazard: Bobcat and Excavator without a fire extinguisher. Maintenance Manual SMCS Code: 7000;7419 reads,<br />
"Make sure that a fire extinguisher is on the machine. Make sure that you are familiar with the operation of the fire<br />
extinguisher... Mount the fire extinguisher on the left side of the cab behind the seat."<br />
Corrective Action: I recommended to Andrew to keep extinguisher at least 10ft from the working area until the proper<br />
extinguisher is purchased and mounted.<br />
Photo 19 Photo 20<br />
Corona Virus (COVID-19) Procedures In Place<br />
No<br />
No written documentation of Covid-19 awareness on site.<br />
Photo 30 Photo 31<br />
Private & Confidential 2/20
Audit 2 failed, 94.29%<br />
CONTRACTOR AND PROJECT INFORMATION<br />
Contractor<br />
Safety Manager<br />
Project Name<br />
Project Number<br />
Project Manager<br />
Superintendent<br />
Inspector of Record (IOR)<br />
Today's Weather Conditions (include 5 day forecast)<br />
ATD<br />
Sean Carr<br />
Oak St Elementary<br />
Inglewood<br />
John <strong>Torres</strong><br />
Andrew <strong>Torres</strong><br />
N/A<br />
Cloudy<br />
Photo 1<br />
1. PROGRAM ADMINISTRATION 100%<br />
A. Attach photo of Safety Program YES<br />
Photo 2<br />
B. Attach photo of Weekly Safety Meeting NO<br />
C. Were any Safety Orientations performed today NO<br />
D. Safety Violation Notifications issued? NO<br />
E. Are emergency procedures established? Contact list, First Aid Kit in<br />
waterproof container. §1512. Emergency Medical Services.<br />
YES<br />
Private & Confidential 3/20
Photo 3 Photo 4<br />
F. Attach photos to identify contractor's on site first aid and CPR certified<br />
workers.<br />
YES<br />
Photo 5<br />
G. Attach photos of OSHA required posters. YES<br />
Photo 6 Photo 7<br />
H. Did Owner's Safety Representative perform a job walk today? if so, list<br />
all safety concerns along with photos accompanied by your abated photos.<br />
I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />
and along with your abated photos.<br />
NO<br />
NO<br />
2. HEAT ILLNESS PREVENTION 100%<br />
A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />
Photo 8<br />
B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />
canopy)<br />
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
N/A<br />
SAFE<br />
Private & Confidential 4/20
Photo 9<br />
D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />
for workers with sign in sheet?<br />
N/A<br />
3. FIRE PREVENTION & PROTECTION 100%<br />
A. Approved gas containers<br />
SAFE<br />
Photo 10<br />
B. Fire extinguishers available and inspected SAFE<br />
Photo 11 Photo 12 Photo 13<br />
3a Protection from Wildfire Smoke<br />
A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />
B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />
considered unhealthy)<br />
N/A<br />
C. Was Wildfire Smoke Training provided for workers? N/A<br />
4. PERSONAL PROTECTIVE EQUIPMENT 100%<br />
A. Approved hard hats SAFE<br />
Photo 14<br />
Private & Confidential 5/20
B. Safety glasses SAFE<br />
Photo 15<br />
D. Are respirators required for any work being performed on site? If so,<br />
were they provided by the employer in conjunction with the required<br />
controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />
Are respirators voluntarily being used? If so, are worker trained on<br />
hazards associated with the environment?<br />
N/A<br />
N/A<br />
E. Proper foot wear SAFE<br />
Photo 16<br />
F. Proper clothing/hand protection/reflective vests SAFE<br />
Photo 17<br />
• Do you have hoists, cranes, derricks & rigging on your site?<br />
• Do you have heavy equipment in your site?<br />
NO<br />
YES<br />
6. HEAVY EQUIPMENT 1 failed, 50%<br />
A. Seat belts used correctly N/A<br />
B. Operators properly trained and authorized SAFE<br />
Photo 18<br />
Private & Confidential 6/20
C. Daily pre-use inspections done and documented.1926.601(b)(14),<br />
Cal/Osha Article 10. Haulage and Earth Moving §1593.<br />
DEFICIENT<br />
2)Hazard: Bobcat and Excavator without a fire extinguisher. Maintenance Manual SMCS Code: 7000;7419 reads,<br />
"Make sure that a fire extinguisher is on the machine. Make sure that you are familiar with the operation of the fire<br />
extinguisher... Mount the fire extinguisher on the left side of the cab behind the seat."<br />
Corrective Action: I recommended to Andrew to keep extinguisher at least 10ft from the working area until the proper<br />
extinguisher is purchased and mounted.<br />
Photo 19 Photo 20<br />
D. Backup alarms and signal men N/A<br />
7. ELECTRICAL TOOLS 100%<br />
A. Terminal boxes covered N/A<br />
B. Ground prong in place N/A<br />
C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />
removed<br />
N/A<br />
D. Temp / permanent lighting adequate and protected N/A<br />
E. GFCI’s in place N/A<br />
F. Mechanical guards in place N/A<br />
G. Proper tools for each job SAFE<br />
Photo 21<br />
H. Powder actuated tools operated by qualified persons N/A<br />
I. Tools inspected. Defected tools removed from service N/A<br />
8. FALL PROTECTION<br />
A. Fall protection policy in effect (6’) N/A<br />
B. PFAS worn correctly N/A<br />
Private & Confidential 7/20
C. Inspection and maintenance of PFAS conducted N/A<br />
D. Employees trained in fall protection and fall hazard recognition N/A<br />
9. BARRICADES / GUARD RAILS / STAIRS 100%<br />
A. Floor / wall openings covered & labeled SAFE<br />
Photo 22 Photo 23 Photo 24 Photo 25<br />
B. Roadways, walkways and stairs free of obstacles SAFE<br />
Photo 26 Photo 27 Photo 28<br />
C. Adequate lighting SAFE<br />
Photo 29<br />
D. Trenches and excavations N/A<br />
• Do you have ladders in your site?<br />
• Is their scaffolding on site?<br />
• Is welding or cutting being performed on site?<br />
• Are their any excavations or shoring on site?<br />
• Is their any concrete work being performed on site?<br />
• Is any steel erection work being performed on site?<br />
• Is their any mobile equipment on site?<br />
• Do you have any confined space work being performed on site?<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
CONTRACTORS (List our client first) 1 failed, 50%<br />
Private & Confidential 8/20
Please click "Add Contractor" button.<br />
Contractor 1 failed, 50%<br />
Contractor 1 1 failed, 50%<br />
Name of Contractor/Company<br />
ATD<br />
Corona Virus (COVID-19) Procedures In Place<br />
No<br />
No written documentation of Covid-19 awareness on site.<br />
Photo 30 Photo 31<br />
JHA Verified<br />
Yes<br />
Photo 32<br />
Toolbox<br />
N/A<br />
Head Count 3<br />
DAILY SAFETY NARRATIVE (DSN)<br />
Please put your Daily Safety Narrative here<br />
Private & Confidential 9/20
Safety Evaluation <strong>Report</strong> at Oaks Elementary School Inglewood.<br />
Met with Foreman Andrew for job walk. The crew is executing demolition of asphalt at the rear parking lot of school.<br />
Removing debris and spoils off site with pick up truck.<br />
Good dust hazard mitigation with water hose in place.<br />
All spoils separated neatly throughout job site.<br />
Andrew did not have a copy of Covid-19 documentation or copy of weekly safety meeting.<br />
The fire extinguisher was inspected for the following:<br />
1.) Valid monthly and yearly dates<br />
2.) The safety pin is in place<br />
3.) Pressure gauge reads 'charged'<br />
4.) Good condition without damage<br />
During the evaluation, I noted the following safety concerns:<br />
1) Hazard: Bobcat and Excavator without a fire extinguisher. Maintenance Manual SMCS Code: 7000;7419 reads,<br />
"Make sure that a fire extinguisher is on the machine. Make sure that you are familiar with the operation of the fire<br />
extinguisher... Mount the fire extinguisher on the left side of the cab behind the seat."<br />
Corrective Action: I recommended to Andrew to make sure extinguisher is inside of moving equipment at all times<br />
per manufacturer requirements. Also informed him to keep extinguisher within 10ft while working until the proper<br />
extinguisher is purchased and mounted.<br />
No injures were reported during my evaluation. This concludes my report.<br />
COMPLETION AND SIGN-OFF<br />
Auditor<br />
Name and Signature<br />
Sean Carr<br />
5th Jun, <strong>2020</strong> 10:34 AM PDT<br />
Private & Confidential 10/20
Safety Evaluation <strong>Report</strong> (SER)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong>/ Norwalk / 08 Jun <strong>2020</strong><br />
/ Sean Carr Complete<br />
Score 92.31% Failed items 3 Actions<br />
0<br />
Client / Site<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong>/ Norwalk<br />
Date of Audit 8th Jun, <strong>2020</strong><br />
Prepared by<br />
Location<br />
Sean Carr<br />
10930 Rosecrans Ave<br />
Norwalk CA 90650<br />
United States<br />
(33.90137180689154, -<br />
118.10122213337394)<br />
Private & Confidential 1/24
Failed Items<br />
3 failed<br />
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
DEFICIENT<br />
Hazard: Not enough water bottles on site for 12 workers with weather reaching 80 degrees and above.<br />
Corrective Action: I spoke with Chris he informed me that he would get guys more water during lunch break. From<br />
grocery store across the street from job site.<br />
Photo 12<br />
B. Safety glasses DEFICIENT<br />
Hazard: Worker without any safety glasses on site.<br />
Corrective Action: Recommenced worker to get prescription safety glasses to help protect from him from an eye<br />
injury.<br />
Photo 18<br />
C. Daily pre-use inspections done and documented.1926.601(b)(14),<br />
Cal/Osha Article 10. Haulage and Earth Moving §1593.<br />
DEFICIENT<br />
1) Hazard: Bobcat, Front end loader and Excavator without a fire extinguisher. Maintenance Manual SMCS Code:<br />
7000;7419 reads, "Make sure that a fire extinguisher is on the machine. Make sure that you are familiar with the<br />
operation of the fire extinguisher... Mount the fire extinguisher on the left side of the cab behind the seat."<br />
Corrective Action: I recommended to Chris to make sure extinguisher is inside of moving equipment at all times per<br />
manufacturer requirements. Also informed him to keep extinguisher within 10ft while working until the proper<br />
extinguisher is purchased and mounted.<br />
Photo 24 Photo 25 Photo 26<br />
Private & Confidential 2/24
Audit 3 failed, 92.31%<br />
CONTRACTOR AND PROJECT INFORMATION<br />
Contractor<br />
Safety Manager<br />
Project Name<br />
Project Number<br />
Project Manager<br />
Superintendent<br />
Inspector of Record (IOR)<br />
Today's Weather Conditions (include 5 day forecast)<br />
ATD<br />
Sean Carr<br />
Tacos Galivan<br />
Norwalk<br />
John <strong>Torres</strong><br />
Teodocio Mendoza<br />
N/A<br />
Clear<br />
Photo 1<br />
1. PROGRAM ADMINISTRATION 100%<br />
A. Attach photo of Safety Program YES<br />
Photo 2<br />
B. Attach photo of Weekly Safety Meeting YES<br />
Photo 3<br />
C. Were any Safety Orientations performed today NO<br />
D. Safety Violation Notifications issued? NO<br />
Private & Confidential 3/24
E. Are emergency procedures established? Contact list, First Aid Kit in<br />
waterproof container. §1512. Emergency Medical Services.<br />
YES<br />
Photo 4 Photo 5<br />
F. Attach photos to identify contractor's on site first aid and CPR certified<br />
workers.<br />
YES<br />
Photo 6 Photo 7<br />
G. Attach photos of OSHA required posters. YES<br />
Photo 8 Photo 9<br />
H. Did Owner's Safety Representative perform a job walk today? if so, list<br />
all safety concerns along with photos accompanied by your abated photos.<br />
I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />
and along with your abated photos.<br />
NO<br />
NO<br />
2. HEAT ILLNESS PREVENTION 1 failed, 66.67%<br />
A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />
Photo 10<br />
B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />
canopy)<br />
SAFE<br />
Private & Confidential 4/24
Photo 11<br />
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
DEFICIENT<br />
Hazard: Not enough water bottles on site for 12 workers with weather reaching 80 degrees and above.<br />
Corrective Action: I spoke with Chris he informed me that he would get guys more water during lunch break. From<br />
grocery store across the street from job site.<br />
Photo 12<br />
D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />
for workers with sign in sheet?<br />
N/A<br />
3. FIRE PREVENTION & PROTECTION 100%<br />
A. Approved gas containers<br />
SAFE<br />
Photo 13<br />
B. Fire extinguishers available and inspected SAFE<br />
The fire extinguisher was inspected for the following:<br />
1.) Valid monthly and yearly dates<br />
2.) The safety pin is in place<br />
3.) Pressure gauge reads 'charged'<br />
4.) Good condition without damage<br />
Private & Confidential 5/24
Photo 14 Photo 15 Photo 16<br />
3a Protection from Wildfire Smoke<br />
A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />
B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />
considered unhealthy)<br />
N/A<br />
C. Was Wildfire Smoke Training provided for workers? N/A<br />
4. PERSONAL PROTECTIVE EQUIPMENT 1 failed, 80%<br />
A. Approved hard hats SAFE<br />
Photo 17<br />
B. Safety glasses DEFICIENT<br />
Hazard: Worker without any safety glasses on site.<br />
Corrective Action: Recommenced worker to get prescription safety glasses to help protect from him from an eye<br />
injury.<br />
Photo 18<br />
D. Are respirators required for any work being performed on site? If so,<br />
were they provided by the employer in conjunction with the required<br />
controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />
Are respirators voluntarily being used? If so, are worker trained on<br />
hazards associated with the environment?<br />
N/A<br />
SAFE<br />
Private & Confidential 6/24
Photo 19<br />
E. Proper foot wear SAFE<br />
Photo 20<br />
F. Proper clothing/hand protection/reflective vests SAFE<br />
Photo 21<br />
• Do you have hoists, cranes, derricks & rigging on your site?<br />
• Do you have heavy equipment in your site?<br />
NO<br />
YES<br />
6. HEAVY EQUIPMENT 1 failed, 66.67%<br />
A. Seat belts used correctly N/A<br />
B. Operators properly trained and authorized SAFE<br />
Photo 22 Photo 23<br />
C. Daily pre-use inspections done and documented.1926.601(b)(14),<br />
Cal/Osha Article 10. Haulage and Earth Moving §1593.<br />
DEFICIENT<br />
Private & Confidential 7/24
1) Hazard: Bobcat, Front end loader and Excavator without a fire extinguisher. Maintenance Manual SMCS Code:<br />
7000;7419 reads, "Make sure that a fire extinguisher is on the machine. Make sure that you are familiar with the<br />
operation of the fire extinguisher... Mount the fire extinguisher on the left side of the cab behind the seat."<br />
Corrective Action: I recommended to Chris to make sure extinguisher is inside of moving equipment at all times per<br />
manufacturer requirements. Also informed him to keep extinguisher within 10ft while working until the proper<br />
extinguisher is purchased and mounted.<br />
Photo 24 Photo 25 Photo 26<br />
D. Backup alarms and signal men SAFE<br />
Photo 27<br />
7. ELECTRICAL TOOLS 100%<br />
A. Terminal boxes covered N/A<br />
B. Ground prong in place N/A<br />
C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />
removed<br />
N/A<br />
D. Temp / permanent lighting adequate and protected N/A<br />
E. GFCI’s in place N/A<br />
F. Mechanical guards in place N/A<br />
G. Proper tools for each job SAFE<br />
Photo 28<br />
H. Powder actuated tools operated by qualified persons N/A<br />
I. Tools inspected. Defected tools removed from service N/A<br />
Private & Confidential 8/24
8. FALL PROTECTION<br />
A. Fall protection policy in effect (6’) N/A<br />
B. PFAS worn correctly N/A<br />
C. Inspection and maintenance of PFAS conducted N/A<br />
D. Employees trained in fall protection and fall hazard recognition N/A<br />
9. BARRICADES / GUARD RAILS / STAIRS 100%<br />
A. Floor / wall openings covered & labeled SAFE<br />
Storm Water Pollution Prevention Straw waddles and sand bags in position Incase dust and debris run off site.<br />
Photo 29 Photo 30<br />
B. Roadways, walkways and stairs free of obstacles SAFE<br />
Photo 31 Photo 32 Photo 33 Photo 34 Photo 35 Photo 36<br />
C. Adequate lighting SAFE<br />
Photo 37<br />
D. Trenches and excavations N/A<br />
• Do you have ladders in your site?<br />
• Is their scaffolding on site?<br />
• Is welding or cutting being performed on site?<br />
• Are their any excavations or shoring on site?<br />
• Is their any concrete work being performed on site?<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
Private & Confidential 9/24
• Is any steel erection work being performed on site?<br />
• Is their any mobile equipment on site?<br />
• Do you have any confined space work being performed on site?<br />
NO<br />
NO<br />
NO<br />
CONTRACTORS (List our client first) 100%<br />
Please click "Add Contractor" button.<br />
Contractor 100%<br />
Contractor 1 100%<br />
Name of Contractor/Company<br />
ATD<br />
Corona Virus (COVID-19) Procedures In Place<br />
Yes<br />
Photo 38 Photo 39 Photo 40 Photo 41<br />
JHA Verified<br />
Yes<br />
Photo 42<br />
Toolbox<br />
Yes<br />
Photo 43<br />
Head Count 12<br />
DAILY SAFETY NARRATIVE (DSN)<br />
Private & Confidential 10/24
Please put your Daily Safety Narrative here<br />
Safety Evaluation <strong>Report</strong> at Tacos Galivan<br />
Met with Forman Chris and Siixtoe for job walk. The crew is executing demolition of entire building and asphalt<br />
inside of construction fence. Removing debris and spoils off site with multiple pick up trucks.<br />
Dust hazard mitigation performed with water hose.<br />
All spoils separated neatly throughout job site.<br />
During the evaluation, I noted the following safety concerns:<br />
1) Hazard: Bobcat, Front end loader and Excavator without a fire extinguisher. Maintenance Manual SMCS Code:<br />
7000;7419 reads, "Make sure that a fire extinguisher is on the machine. Make sure that you are familiar with the<br />
operation of the fire extinguisher... Mount the fire extinguisher on the left side of the cab behind the seat."<br />
Corrective Action: I recommended to Chris to make sure extinguisher is inside of moving equipment at all times per<br />
manufacturer requirements. Also informed him to keep extinguisher within 10ft while working until the proper<br />
extinguisher is purchased and mounted.<br />
2) Hazard: Worker without any safety glasses on site.<br />
Corrective Action: Recommenced worker to get prescription safety glasses to help protect from him from an eye<br />
injury.<br />
3) Hazard: Not enough water bottles on site for 12 workers with weather reaching 80 degrees and above.<br />
Corrective Action: I spoke with Chris he informed me that he would get guys more water during lunch break.<br />
No injures were reported during my evaluation. This concludes my report.<br />
COMPLETION AND SIGN-OFF<br />
Auditor<br />
Name and Signature<br />
Sean Carr<br />
8th Jun, <strong>2020</strong> 12:01 PM PDT<br />
Private & Confidential 11/24
Safety Evaluation <strong>Report</strong> (SER)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong> / 8 Jun <strong>2020</strong> / Sean Carr<br />
Complete<br />
Score 94.87% Failed items 1 Actions<br />
0<br />
Client / Site<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
Date of Audit 8th Jun, <strong>2020</strong><br />
Prepared by<br />
Location<br />
Sean Carr<br />
483 College Blvd<br />
Oceanside CA 92057<br />
United States<br />
(33.24592516760644, -<br />
117.29106433700517)<br />
Private & Confidential 1/24
Failed Items<br />
1 failed<br />
B. PFAS worn correctly DEFICIENT<br />
1) Hazard: Improper lanyard being used to tie off to anchor also snaphook not attached to anchor. Lanyard was<br />
looped around and connected back on its integral lanyard.<br />
Corrective Action: Per Title 8 Section 1670<br />
& Subpart M App C (2) As required by 1926.502(d)(6), the following connections must be avoided (unless properly<br />
designed locking snaphooks are used) because they are conditions which can result in roll-out when a nonlocking<br />
snaphook is used:<br />
(iv) A snaphook connected back on its integral lanyard.<br />
(v) A snaphook connected to a webbing loop or webbing lanyard.<br />
I informed Jesus of hazard and he went to his truck and replaced with correct lanyard and proper snaphook<br />
connection.<br />
Photo 27 Photo 28 Photo 29 Photo 30<br />
Private & Confidential 2/24
Audit 1 failed, 94.87%<br />
CONTRACTOR AND PROJECT INFORMATION<br />
Contractor<br />
Safety Manager<br />
Project Name<br />
Project Number<br />
Project Manager<br />
Superintendent<br />
Inspector of Record (IOR)<br />
Today's Weather Conditions (include 5 day forecast)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
Sean Carr<br />
Mc Donald’s Oceanside<br />
Oceanside<br />
Johns <strong>Torres</strong><br />
Jesus Pineda<br />
N/A<br />
Clear<br />
Photo 1<br />
1. PROGRAM ADMINISTRATION 100%<br />
A. Attach photo of Safety Program YES<br />
Photo 2<br />
B. Attach photo of Weekly Safety Meeting YES<br />
Photo 3<br />
C. Were any Safety Orientations performed today NO<br />
D. Safety Violation Notifications issued? NO<br />
Private & Confidential 3/24
E. Are emergency procedures established? Contact list, First Aid Kit in<br />
waterproof container. §1512. Emergency Medical Services.<br />
YES<br />
Photo 4 Photo 5 Photo 6<br />
F. Attach photos to identify contractor's on site first aid and CPR certified<br />
workers.<br />
YES<br />
Photo 7<br />
G. Attach photos of OSHA required posters. YES<br />
Photo 8 Photo 9<br />
H. Did Owner's Safety Representative perform a job walk today? if so, list<br />
all safety concerns along with photos accompanied by your abated photos.<br />
I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />
and along with your abated photos.<br />
NO<br />
NO<br />
2. HEAT ILLNESS PREVENTION 100%<br />
A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />
Photo 10<br />
B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />
canopy)<br />
SAFE<br />
Private & Confidential 4/24
Photo 11<br />
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
SAFE<br />
Photo 12<br />
D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />
for workers with sign in sheet?<br />
N/A<br />
3. FIRE PREVENTION & PROTECTION 100%<br />
A. Approved gas containers<br />
SAFE<br />
Photo 13<br />
B. Fire extinguishers available and inspected SAFE<br />
Photo 14 Photo 15 Photo 16<br />
3a Protection from Wildfire Smoke<br />
A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />
B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />
considered unhealthy)<br />
N/A<br />
C. Was Wildfire Smoke Training provided for workers? N/A<br />
Private & Confidential 5/24
4. PERSONAL PROTECTIVE EQUIPMENT 100%<br />
A. Approved hard hats SAFE<br />
Photo 17<br />
B. Safety glasses SAFE<br />
Photo 18<br />
D. Are respirators required for any work being performed on site? If so,<br />
were they provided by the employer in conjunction with the required<br />
controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />
SAFE<br />
Photo 19<br />
Are respirators voluntarily being used? If so, are worker trained on<br />
hazards associated with the environment?<br />
N/A<br />
E. Proper foot wear SAFE<br />
Photo 20<br />
F. Proper clothing/hand protection/reflective vests SAFE<br />
Photo 21<br />
Private & Confidential 6/24
• Do you have hoists, cranes, derricks & rigging on your site?<br />
• Do you have heavy equipment in your site?<br />
NO<br />
NO<br />
7. ELECTRICAL TOOLS 100%<br />
A. Terminal boxes covered N/A<br />
B. Ground prong in place N/A<br />
C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />
removed<br />
N/A<br />
D. Temp / permanent lighting adequate and protected N/A<br />
E. GFCI’s in place N/A<br />
F. Mechanical guards in place N/A<br />
G. Proper tools for each job SAFE<br />
Photo 22 Photo 23<br />
H. Powder actuated tools operated by qualified persons N/A<br />
I. Tools inspected. Defected tools removed from service SAFE<br />
Photo 24<br />
8. FALL PROTECTION 1 failed, 50%<br />
A. Fall protection policy in effect (6’) SAFE<br />
Photo 25 Photo 26<br />
B. PFAS worn correctly DEFICIENT<br />
Private & Confidential 7/24
1) Hazard: Improper lanyard being used to tie off to anchor also snaphook not attached to anchor. Lanyard was<br />
looped around and connected back on its integral lanyard.<br />
Corrective Action: Per Title 8 Section 1670<br />
& Subpart M App C (2) As required by 1926.502(d)(6), the following connections must be avoided (unless properly<br />
designed locking snaphooks are used) because they are conditions which can result in roll-out when a nonlocking<br />
snaphook is used:<br />
(iv) A snaphook connected back on its integral lanyard.<br />
(v) A snaphook connected to a webbing loop or webbing lanyard.<br />
I informed Jesus of hazard and he went to his truck and replaced with correct lanyard and proper snaphook<br />
connection.<br />
Photo 27 Photo 28 Photo 29 Photo 30<br />
C. Inspection and maintenance of PFAS conducted N/A<br />
D. Employees trained in fall protection and fall hazard recognition N/A<br />
9. BARRICADES / GUARD RAILS / STAIRS 100%<br />
A. Floor / wall openings covered & labeled N/A<br />
B. Roadways, walkways and stairs free of obstacles SAFE<br />
Photo 31<br />
C. Adequate lighting SAFE<br />
Photo 32 Photo 33<br />
D. Trenches and excavations N/A<br />
• Do you have ladders in your site?<br />
YES<br />
Private & Confidential 8/24
10. LADDERS 100%<br />
A. Secured to prevent slipping, sliding or falling SAFE<br />
Photo 34<br />
B. Side rails extend 36” above top of landing, tied off and secured. N/A<br />
C. Step ladders fully open when in use. N/A<br />
• Is their scaffolding on site?<br />
• Is welding or cutting being performed on site?<br />
• Are their any excavations or shoring on site?<br />
• Is their any concrete work being performed on site?<br />
• Is any steel erection work being performed on site?<br />
• Is their any mobile equipment on site?<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
YES<br />
Scissor lift onsite not in use during safety evaluation.<br />
Photo 35<br />
16. MOBILE EQUIPMENT<br />
A. Are imposed loads exerted on the life basket. N/A<br />
B. Are lifts operated within load capacities N/A<br />
C. Are lift occupants tied off to the designated anchorage points. N/A<br />
• Do you have any confined space work being performed on site?<br />
CONTRACTORS (List our client first) 100%<br />
Please click "Add Contractor" button.<br />
Contractor 100%<br />
Private & Confidential 9/24
Contractor 1 100%<br />
Name of Contractor/Company<br />
ATD<br />
Corona Virus (COVID-19) Procedures In Place<br />
Yes<br />
Photo 36 Photo 37 Photo 38 Photo 39<br />
JHA Verified<br />
Yes<br />
Photo 40<br />
Toolbox<br />
Yes<br />
Photo 41<br />
Head Count 5<br />
DAILY SAFETY NARRATIVE (DSN)<br />
Please put your Daily Safety Narrative here<br />
Private & Confidential 10/24
Safety Evaluation <strong>Report</strong> in Oceanside Mc Donald’s.<br />
Met with Foreman Jesus for job walk and documentation. The crew in the process of demolition the roof canopy<br />
above drive through window. Workers using Sawzall and grinder to remove stucco/roofing tile and metal caps.<br />
Working around open and active drive through barricades in place to protect workers from ongoing traffic.<br />
All workers wearing proper PPE and proper respiratory protection.<br />
The fire extinguisher was inspected for the following:<br />
1.) Valid monthly and yearly dates<br />
2.) The safety pin is in place<br />
3.) Pressure gauge reads 'charged'<br />
4.) Good condition without damage<br />
During the evaluation, I noted the following safety concerns:<br />
1) Hazard: Improper lanyard being used to tie off to anchor also snaphook not attached to anchor. Lanyard was<br />
looped around and connected back on its integral lanyard.<br />
Corrective Action: Per Title 8 Section 1670 & Subpart M App C (2) As required by 1926.502(d)(6), the following<br />
connections must be avoided (unless properly designed locking snaphooks are used) because they are conditions<br />
which can result in roll-out when a nonlocking snaphook is used:<br />
(iv) A snaphook connected back on its integral lanyard.<br />
(v) A snaphook connected to a webbing loop or webbing lanyard.<br />
I informed Jesus of hazard and he went to his truck and replaced with correct lanyard and proper snaphook<br />
connection.<br />
No injures were reported during my evaluation. This concludes my report.<br />
COMPLETION AND SIGN-OFF<br />
Auditor<br />
Name and Signature<br />
Sean Carr<br />
8th Jun, <strong>2020</strong> 9:37 AM PDT<br />
Private & Confidential 11/24
Safety Evaluation <strong>Report</strong> (SER)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong> / 23 Jun <strong>2020</strong> / Mayra<br />
Martinez<br />
Complete<br />
Score 95.12% Failed items 2 Actions<br />
0<br />
Client / Site<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
Date of Audit 23rd Jun, <strong>2020</strong><br />
Prepared by<br />
Location<br />
Mayra Martinez<br />
444 N Amelia Ave<br />
San Dimas CA 91773<br />
United States<br />
(34.10959857245667, -<br />
117.81946472630624)<br />
Private & Confidential 1/21
Failed Items<br />
2 failed<br />
C. Inspection and maintenance of PFAS conducted DEFICIENT<br />
Photo 30<br />
A. Floor / wall openings covered & labeled DEFICIENT<br />
Photo 31 Photo 32<br />
Private & Confidential 2/21
Audit 2 failed, 95.12%<br />
CONTRACTOR AND PROJECT INFORMATION<br />
Contractor <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
Safety Manager Mayra Martinez<br />
Project Name San Dimas<br />
Project Number San Dimas<br />
Project Manager Jesus Pineda<br />
Superintendent John <strong>Torres</strong><br />
Inspector of Record (IOR) N/A<br />
Today's Weather Conditions (include 5 day forecast)<br />
Clear<br />
Photo 1<br />
1. PROGRAM ADMINISTRATION 100%<br />
A. Attach photo of Safety Program YES<br />
Photo 2<br />
B. Attach photo of Weekly Safety Meeting YES<br />
Photo 3<br />
C. Were any Safety Orientations performed today NO<br />
D. Safety Violation Notifications issued? NO<br />
Private & Confidential 3/21
E. Are emergency procedures established? Contact list, First Aid Kit in<br />
waterproof container. §1512. Emergency Medical Services.<br />
YES<br />
Photo 4 Photo 5 Photo 6<br />
F. Attach photos to identify contractor's on site first aid and CPR certified<br />
workers.<br />
YES<br />
Photo 7<br />
G. Attach photos of OSHA required posters. YES<br />
Photo 8 Photo 9<br />
H. Did Owner's Safety Representative perform a job walk today? if so, list<br />
all safety concerns along with photos accompanied by your abated photos.<br />
I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />
and along with your abated photos.<br />
NO<br />
NO<br />
2. HEAT ILLNESS PREVENTION 100%<br />
A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />
Photo 10 Photo 11<br />
B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />
canopy)<br />
SAFE<br />
Private & Confidential 4/21
Photo 12 Photo 13<br />
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
SAFE<br />
The water supply<br />
Photo 14 Photo 15<br />
D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />
for workers with sign in sheet?<br />
N/A<br />
3. FIRE PREVENTION & PROTECTION 100%<br />
A. Approved gas containers<br />
N/A<br />
B. Fire extinguishers available and inspected SAFE<br />
Photo 16 Photo 17 Photo 18 Photo 19<br />
3a Protection from Wildfire Smoke<br />
A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />
B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />
considered unhealthy)<br />
N/A<br />
C. Was Wildfire Smoke Training provided for workers? N/A<br />
4. PERSONAL PROTECTIVE EQUIPMENT 100%<br />
A. Approved hard hats SAFE<br />
Private & Confidential 5/21
Photo 20<br />
B. Safety glasses SAFE<br />
Photo 21<br />
D. Are respirators required for any work being performed on site? If so,<br />
were they provided by the employer in conjunction with the required<br />
controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />
Are respirators voluntarily being used? If so, are worker trained on<br />
hazards associated with the environment?<br />
N/A<br />
N/A<br />
E. Proper foot wear SAFE<br />
Photo 22<br />
F. Proper clothing/hand protection/reflective vests SAFE<br />
Photo 23<br />
• Do you have hoists, cranes, derricks & rigging on your site?<br />
• Do you have heavy equipment in your site?<br />
NO<br />
NO<br />
7. ELECTRICAL TOOLS 100%<br />
A. Terminal boxes covered N/A<br />
B. Ground prong in place N/A<br />
Private & Confidential 6/21
C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />
removed<br />
SAFE<br />
Photo 24<br />
D. Temp / permanent lighting adequate and protected SAFE<br />
Photo 25<br />
E. GFCI’s in place N/A<br />
F. Mechanical guards in place N/A<br />
G. Proper tools for each job SAFE<br />
Photo 26 Photo 27 Photo 28<br />
H. Powder actuated tools operated by qualified persons N/A<br />
I. Tools inspected. Defected tools removed from service SAFE<br />
8. FALL PROTECTION 1 failed, 75%<br />
A. Fall protection policy in effect (6’) SAFE<br />
Photo 29<br />
B. PFAS worn correctly SAFE<br />
C. Inspection and maintenance of PFAS conducted DEFICIENT<br />
Private & Confidential 7/21
Photo 30<br />
D. Employees trained in fall protection and fall hazard recognition SAFE<br />
9. BARRICADES / GUARD RAILS / STAIRS 1 failed, 66.67%<br />
A. Floor / wall openings covered & labeled DEFICIENT<br />
Photo 31 Photo 32<br />
B. Roadways, walkways and stairs free of obstacles SAFE<br />
Photo 33 Photo 34 Photo 35<br />
C. Adequate lighting SAFE<br />
D. Trenches and excavations N/A<br />
• Do you have ladders in your site?<br />
• Is their scaffolding on site?<br />
• Is welding or cutting being performed on site?<br />
• Are their any excavations or shoring on site?<br />
• Is their any concrete work being performed on site?<br />
• Is any steel erection work being performed on site?<br />
• Is their any mobile equipment on site?<br />
• Do you have any confined space work being performed on site?<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
CONTRACTORS (List our client first) 100%<br />
Please click "Add Contractor" button.<br />
Private & Confidential 8/21
Contractor 100%<br />
Contractor 1 100%<br />
Name of Contractor/Company<br />
ATD<br />
Corona Virus (COVID-19) Procedures In Place<br />
Yes<br />
Photo 36 Photo 37 Photo 38<br />
JHA Verified<br />
Yes<br />
Photo 39<br />
Toolbox<br />
Yes<br />
Photo 40 Photo 41<br />
Head Count 6<br />
DAILY SAFETY NARRATIVE (DSN)<br />
Please put your Daily Safety Narrative here<br />
COMPLETION AND SIGN-OFF<br />
Auditor<br />
Name and Signature<br />
Mayra Martinez<br />
23rd Jun, <strong>2020</strong> 1:08 PM PDT<br />
Private & Confidential 9/21
Safety Evaluation <strong>Report</strong> (SER)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong> / 1 Jun <strong>2020</strong> / Sean Carr<br />
Complete<br />
Score 97.3% Failed items 1 Actions<br />
0<br />
Client / Site<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
Date of Audit 1st Jun, <strong>2020</strong><br />
Prepared by<br />
Location<br />
Sean Carr<br />
1552 S Azusa Ave<br />
Industry CA 91748<br />
United States<br />
(33.99481317962892, -<br />
117.9304058198984)<br />
Private & Confidential 1/21
Failed Items<br />
1 failed<br />
C. Daily pre-use inspections done and documented.1926.601(b)(14),<br />
Cal/Osha Article 10. Haulage and Earth Moving §1593.<br />
DEFICIENT<br />
Hazard: No Fire Extinguisher inside of Bobcat.<br />
Corrective Action: Informed Mike and Teodocio to put extinguisher inside of cab. Foreman let me know that<br />
extinguisher is to big to fit inside and it would compromise his operating space. I recommended that they keep<br />
extinguisher at least 10ft from working area until proper extinguisher is purchased and mounted.<br />
Photo 22 Photo 23 Photo 24<br />
Private & Confidential 2/21
Audit 1 failed, 97.3%<br />
CONTRACTOR AND PROJECT INFORMATION<br />
Contractor<br />
Safety Manager<br />
Project Name<br />
Project Number<br />
Project Manager<br />
Superintendent<br />
Inspector of Record (IOR)<br />
Today's Weather Conditions (include 5 day forecast)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
Sean Carr<br />
Azusa Raising Canes<br />
Azusa<br />
John<strong>Torres</strong><br />
Teodocio Mendoza<br />
N/A<br />
Clear<br />
Photo 1<br />
1. PROGRAM ADMINISTRATION 100%<br />
A. Attach photo of Safety Program YES<br />
Photo 2<br />
B. Attach photo of Weekly Safety Meeting NO<br />
C. Were any Safety Orientations performed today NO<br />
D. Safety Violation Notifications issued? NO<br />
E. Are emergency procedures established? Contact list, First Aid Kit in<br />
waterproof container. §1512. Emergency Medical Services.<br />
YES<br />
Private & Confidential 3/21
Photo 3 Photo 4<br />
F. Attach photos to identify contractor's on site first aid and CPR certified<br />
workers.<br />
YES<br />
Photo 5 Photo 6<br />
G. Attach photos of OSHA required posters. YES<br />
Photo 7 Photo 8<br />
H. Did Owner's Safety Representative perform a job walk today? if so, list<br />
all safety concerns along with photos accompanied by your abated photos.<br />
I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />
and along with your abated photos.<br />
NO<br />
NO<br />
2. HEAT ILLNESS PREVENTION 100%<br />
A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />
Photo 9<br />
B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />
canopy)<br />
SAFE<br />
Private & Confidential 4/21
Photo 10<br />
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
SAFE<br />
Photo 11<br />
D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />
for workers with sign in sheet?<br />
N/A<br />
3. FIRE PREVENTION & PROTECTION 100%<br />
A. Approved gas containers<br />
SAFE<br />
Photo 12<br />
B. Fire extinguishers available and inspected SAFE<br />
Photo 13 Photo 14 Photo 15<br />
3a Protection from Wildfire Smoke<br />
A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />
B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />
considered unhealthy)<br />
N/A<br />
C. Was Wildfire Smoke Training provided for workers? N/A<br />
Private & Confidential 5/21
4. PERSONAL PROTECTIVE EQUIPMENT 100%<br />
A. Approved hard hats SAFE<br />
Photo 16<br />
B. Safety glasses SAFE<br />
Photo 17<br />
D. Are respirators required for any work being performed on site? If so,<br />
were they provided by the employer in conjunction with the required<br />
controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />
Are respirators voluntarily being used? If so, are worker trained on<br />
hazards associated with the environment?<br />
N/A<br />
N/A<br />
E. Proper foot wear SAFE<br />
Photo 18<br />
F. Proper clothing/hand protection/reflective vests SAFE<br />
Photo 19<br />
• Do you have hoists, cranes, derricks & rigging on your site?<br />
• Do you have heavy equipment in your site?<br />
NO<br />
YES<br />
6. HEAVY EQUIPMENT 1 failed, 75%<br />
Private & Confidential 6/21
A. Seat belts used correctly SAFE<br />
Photo 20<br />
B. Operators properly trained and authorized SAFE<br />
Photo 21<br />
C. Daily pre-use inspections done and documented.1926.601(b)(14),<br />
Cal/Osha Article 10. Haulage and Earth Moving §1593.<br />
DEFICIENT<br />
Hazard: No Fire Extinguisher inside of Bobcat.<br />
Corrective Action: Informed Mike and Teodocio to put extinguisher inside of cab. Foreman let me know that<br />
extinguisher is to big to fit inside and it would compromise his operating space. I recommended that they keep<br />
extinguisher at least 10ft from working area until proper extinguisher is purchased and mounted.<br />
Photo 22 Photo 23 Photo 24<br />
D. Backup alarms and signal men SAFE<br />
Back up alarm witnessed working while grading landscape.<br />
Photo 25<br />
7. ELECTRICAL TOOLS<br />
A. Terminal boxes covered N/A<br />
B. Ground prong in place N/A<br />
Private & Confidential 7/21
C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />
removed<br />
N/A<br />
D. Temp / permanent lighting adequate and protected N/A<br />
E. GFCI’s in place N/A<br />
F. Mechanical guards in place N/A<br />
G. Proper tools for each job N/A<br />
H. Powder actuated tools operated by qualified persons N/A<br />
I. Tools inspected. Defected tools removed from service N/A<br />
8. FALL PROTECTION<br />
A. Fall protection policy in effect (6’) N/A<br />
B. PFAS worn correctly N/A<br />
C. Inspection and maintenance of PFAS conducted N/A<br />
D. Employees trained in fall protection and fall hazard recognition N/A<br />
9. BARRICADES / GUARD RAILS / STAIRS 100%<br />
A. Floor / wall openings covered & labeled N/A<br />
B. Roadways, walkways and stairs free of obstacles SAFE<br />
Photo 26 Photo 27 Photo 28<br />
C. Adequate lighting SAFE<br />
Photo 29<br />
D. Trenches and excavations SAFE<br />
All trenches and excavations back filled with proper technique and mitigation of dust hazards.<br />
Private & Confidential 8/21
Photo 30 Photo 31 Photo 32 Photo 33<br />
• Do you have ladders in your site?<br />
• Is their scaffolding on site?<br />
• Is welding or cutting being performed on site?<br />
• Are their any excavations or shoring on site?<br />
• Is their any concrete work being performed on site?<br />
• Is any steel erection work being performed on site?<br />
• Is their any mobile equipment on site?<br />
• Do you have any confined space work being performed on site?<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
CONTRACTORS (List our client first) 100%<br />
Please click "Add Contractor" button.<br />
Contractor 100%<br />
Contractor 1 100%<br />
Name of Contractor/Company<br />
ATD<br />
Corona Virus (COVID-19) Procedures In Place<br />
Yes<br />
Photo 34 Photo 35 Photo 36 Photo 37<br />
JHA Verified<br />
Yes<br />
Photo 38<br />
Toolbox<br />
N/A<br />
Private & Confidential 9/21
Head Count 2<br />
DAILY SAFETY NARRATIVE (DSN)<br />
Please put your Daily Safety Narrative here<br />
Met with Chris Mendoza on-site of Raising Cane at 11am for site evaluation.<br />
Workers grading landscape and removing dirt off-site with pick up truck. Also compacting soil in preparation for<br />
asphalt.<br />
All workers wearing gloves and proper PPE efficiently.<br />
Covid-19 hazard awareness in place 6ft social distancing in place hand wash station and gloves provided.<br />
During my evaluation, I noted the following safety concerns:<br />
1.)Hazard: Bobcat without a fire extinguisher. Maintenance Manual SMCS Code: 7000;7419 reads, "Make sure that<br />
a fire extinguisher is on the machine. Make sure that you are familiar with the operation of the fire extinguisher...<br />
Mount the fire extinguisher on the left side of the cab behind the seat."<br />
Corrective Action: Informed Mike and Teodocio to put extinguisher inside of the cab. Foreman let me know that<br />
extinguisher is too big to fit inside and it would compromise his operating space. I recommended that they keep<br />
extinguisher at least 10ft from the working area until the proper extinguisher is purchased and mounted.<br />
No injuries were reported during my evaluation. This concludes my report.<br />
COMPLETION AND SIGN-OFF<br />
Auditor<br />
Name and Signature<br />
Sean Carr<br />
1st Jun, <strong>2020</strong> 12:49 PM PDT<br />
Private & Confidential 10/21
Safety Evaluation <strong>Report</strong> (SER)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong> / 5 Jun <strong>2020</strong> / Sean Carr<br />
Complete<br />
Score 97.14% Failed items 1 Actions<br />
0<br />
Client / Site<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
Date of Audit 5th Jun, <strong>2020</strong><br />
Prepared by<br />
Location<br />
Sean Carr<br />
10780 Jefferson Blvd<br />
Culver City CA 90230<br />
United States<br />
(34.00301051329263, -<br />
118.39350119244158)<br />
Private & Confidential 1/25
Failed Items<br />
1 failed<br />
A. Floor / wall openings covered & labeled DEFICIENT<br />
Hazard: Impalement hazard in work area. Nails not removed or secured to prevent impalement Incase of a slit or<br />
fall.<br />
Corrective Action: Spoke with Forman Able and he mitigated the hazard immediately by flipping over all wood with<br />
nails and removing wood off site into trash bend.<br />
Photo 27 Photo 28<br />
Private & Confidential 2/25
Audit 1 failed, 97.14%<br />
CONTRACTOR AND PROJECT INFORMATION<br />
Contractor<br />
Safety Manager<br />
Project Name<br />
Project Number<br />
Project Manager<br />
Superintendent<br />
Inspector of Record (IOR)<br />
Today's Weather Conditions (include 5 day forecast)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
Sean Carr<br />
Denny’s Culver City<br />
Culver City<br />
John <strong>Torres</strong><br />
Abel Castro<br />
N/A<br />
Cloudy<br />
Photo 1<br />
1. PROGRAM ADMINISTRATION 100%<br />
A. Attach photo of Safety Program YES<br />
Photo 2<br />
B. Attach photo of Weekly Safety Meeting YES<br />
Photo 3<br />
C. Were any Safety Orientations performed today NO<br />
D. Safety Violation Notifications issued? NO<br />
Private & Confidential 3/25
E. Are emergency procedures established? Contact list, First Aid Kit in<br />
waterproof container. §1512. Emergency Medical Services.<br />
YES<br />
Photo 4 Photo 5<br />
F. Attach photos to identify contractor's on site first aid and CPR certified<br />
workers.<br />
YES<br />
Photo 6<br />
G. Attach photos of OSHA required posters. YES<br />
Photo 7 Photo 8<br />
H. Did Owner's Safety Representative perform a job walk today? if so, list<br />
all safety concerns along with photos accompanied by your abated photos.<br />
I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />
and along with your abated photos.<br />
NO<br />
NO<br />
2. HEAT ILLNESS PREVENTION 100%<br />
A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />
Photo 9<br />
B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />
canopy)<br />
N/A<br />
Private & Confidential 4/25
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
SAFE<br />
Photo 10 Photo 11<br />
D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />
for workers with sign in sheet?<br />
N/A<br />
3. FIRE PREVENTION & PROTECTION 100%<br />
A. Approved gas containers<br />
N/A<br />
B. Fire extinguishers available and inspected SAFE<br />
Photo 12 Photo 13 Photo 14<br />
3a Protection from Wildfire Smoke<br />
A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />
B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />
considered unhealthy)<br />
N/A<br />
C. Was Wildfire Smoke Training provided for workers? N/A<br />
4. PERSONAL PROTECTIVE EQUIPMENT 100%<br />
A. Approved hard hats SAFE<br />
Photo 15<br />
B. Safety glasses SAFE<br />
Private & Confidential 5/25
Photo 16<br />
D. Are respirators required for any work being performed on site? If so,<br />
were they provided by the employer in conjunction with the required<br />
controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />
SAFE<br />
Photo 17<br />
Are respirators voluntarily being used? If so, are worker trained on<br />
hazards associated with the environment?<br />
N/A<br />
E. Proper foot wear SAFE<br />
Photo 18 Photo 19<br />
F. Proper clothing/hand protection/reflective vests SAFE<br />
Photo 20 Photo 21<br />
• Do you have hoists, cranes, derricks & rigging on your site?<br />
• Do you have heavy equipment in your site?<br />
NO<br />
YES<br />
6. HEAVY EQUIPMENT 100%<br />
A. Seat belts used correctly N/A<br />
B. Operators properly trained and authorized N/A<br />
C. Daily pre-use inspections done and documented.1926.601(b)(14),<br />
Cal/Osha Article 10. Haulage and Earth Moving §1593.<br />
N/A<br />
Private & Confidential 6/25
D. Backup alarms and signal men SAFE<br />
Photo 22 Photo 23<br />
7. ELECTRICAL TOOLS 100%<br />
A. Terminal boxes covered N/A<br />
B. Ground prong in place N/A<br />
C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />
removed<br />
N/A<br />
D. Temp / permanent lighting adequate and protected N/A<br />
E. GFCI’s in place N/A<br />
F. Mechanical guards in place N/A<br />
G. Proper tools for each job SAFE<br />
Photo 24 Photo 25 Photo 26<br />
H. Powder actuated tools operated by qualified persons N/A<br />
I. Tools inspected. Defected tools removed from service N/A<br />
8. FALL PROTECTION<br />
A. Fall protection policy in effect (6’) N/A<br />
B. PFAS worn correctly N/A<br />
C. Inspection and maintenance of PFAS conducted N/A<br />
D. Employees trained in fall protection and fall hazard recognition N/A<br />
9. BARRICADES / GUARD RAILS / STAIRS 1 failed, 50%<br />
A. Floor / wall openings covered & labeled DEFICIENT<br />
Private & Confidential 7/25
Hazard: Impalement hazard in work area. Nails not removed or secured to prevent impalement Incase of a slit or<br />
fall.<br />
Corrective Action: Spoke with Forman Able and he mitigated the hazard immediately by flipping over all wood with<br />
nails and removing wood off site into trash bend.<br />
Photo 27 Photo 28<br />
B. Roadways, walkways and stairs free of obstacles SAFE<br />
Photo 29 Photo 30 Photo 31 Photo 32<br />
C. Adequate lighting N/A<br />
D. Trenches and excavations N/A<br />
• Do you have ladders in your site?<br />
• Is their scaffolding on site?<br />
• Is welding or cutting being performed on site?<br />
• Are their any excavations or shoring on site?<br />
• Is their any concrete work being performed on site?<br />
• Is any steel erection work being performed on site?<br />
• Is their any mobile equipment on site?<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
YES<br />
16. MOBILE EQUIPMENT 100%<br />
A. Are imposed loads exerted on the life basket. N/A<br />
B. Are lifts operated within load capacities SAFE<br />
Photo 33<br />
Private & Confidential 8/25
C. Are lift occupants tied off to the designated anchorage points. N/A<br />
• Do you have any confined space work being performed on site?<br />
NO<br />
CONTRACTORS (List our client first) 100%<br />
Please click "Add Contractor" button.<br />
Contractor 100%<br />
Contractor 1 100%<br />
Name of Contractor/Company<br />
ATD<br />
Corona Virus (COVID-19) Procedures In Place<br />
Yes<br />
Photo 34 Photo 35 Photo 36 Photo 37<br />
JHA Verified<br />
Yes<br />
Photo 38<br />
Toolbox<br />
Yes<br />
Photo 39<br />
Head Count 8<br />
DAILY SAFETY NARRATIVE (DSN)<br />
Private & Confidential 9/25
Please put your Daily Safety Narrative here<br />
Safety Evaluation <strong>Report</strong> at Denny’s Culver City.<br />
Met with Foreman Able for job walk and documentation. The crew in the process of demolition of walls, tile, carpet,<br />
and ceiling. Good dust control water method in place setting a safe environment for workers.<br />
All workers wearing proper PPE working productivity.<br />
Workers do not have a hand wash station on-site but did have hand sanitizer mounted on the wall for proper<br />
sanitation. Able informed me that water will be back on inside of the building later today when the plumber arrives<br />
and workers will use sinks inside if need be.<br />
The fire extinguisher was inspected for the following:<br />
1.) Valid monthly and yearly dates<br />
2.) The safety pin is in place<br />
3.) Pressure gauge reads 'charged'<br />
4.) Good condition without damage<br />
During the evaluation, I noted the following safety concerns:<br />
1) Hazard: Impalement hazard in the work area. Nails not removed or secured to prevent impalement In case of a<br />
slip or fall.<br />
Corrective Action: Spoke with Forman Able and he mitigated the hazard immediately by flipping over all the wood<br />
with nails and removing wood off-site into trash bend. I informed Albert that nails should be removed or bent<br />
immediately once the hazard is present to protect workers. He informed me that it slows down production to remove<br />
or bend nails.<br />
“Recommendations moving forward all impalement hazards should be mitigated by removing, bending nails, or<br />
take wood directly to trash bend clear from the work area.<br />
CFR 1926.25(a)<br />
During the course of construction, alteration, or repairs, form, and scrap lumber with protruding nails, and all other<br />
debris, shall be kept cleared from work areas, passageways, and stairs, in and around buildings or other structures.<br />
No injures were reported during my evaluation. This concludes my report.<br />
COMPLETION AND SIGN-OFF<br />
Private & Confidential 10/25
Auditor<br />
Name and Signature<br />
Sean Carr<br />
5th Jun, <strong>2020</strong> 8:41 AM PDT<br />
Private & Confidential 11/25
Safety Evaluation <strong>Report</strong> (SER)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong> / Lake Elsinore / 3 Jun<br />
<strong>2020</strong> / Sean Carr Complete<br />
Score 95.35% Failed items 2 Actions<br />
0<br />
Client / Site<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong> / Lake<br />
Elsinore<br />
Date of Audit 3rd Jun, <strong>2020</strong><br />
Prepared by<br />
Location<br />
Sean Carr<br />
25361 Railroad Canyon Rd<br />
Lake Elsinore CA 92532<br />
United States<br />
(33.667374090322916, -<br />
117.26532083015634)<br />
Private & Confidential 1/24
Failed Items<br />
2 failed<br />
C. Daily pre-use inspections done and documented.1926.601(b)(14),<br />
Cal/Osha Article 10. Haulage and Earth Moving §1593.<br />
DEFICIENT<br />
Photo 26<br />
B. Roadways, walkways and stairs free of obstacles DEFICIENT<br />
Hazard: impalement hazard no caps on metal stakes in work area.<br />
Corrective Action: Informed Forman to remove or cover with caps or cones. Forman removed all metal stakes upon<br />
request.<br />
Photo 36 Photo 37 Photo 38 Photo 39<br />
Private & Confidential 2/24
Audit 2 failed, 95.35%<br />
CONTRACTOR AND PROJECT INFORMATION<br />
Contractor<br />
Safety Manager<br />
Project Name<br />
Project Number<br />
Project Manager<br />
Superintendent<br />
Inspector of Record (IOR)<br />
Today's Weather Conditions (include 5 day forecast)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
Sean Carr<br />
ATD Lake Elsinore<br />
Lake Elsinore ATD<br />
Sean Carr<br />
Sixtos Molina<br />
N/A<br />
Clear<br />
Photo 1<br />
1. PROGRAM ADMINISTRATION 100%<br />
A. Attach photo of Safety Program YES<br />
Photo 2<br />
B. Attach photo of Weekly Safety Meeting YES<br />
Photo 3 Photo 4<br />
C. Were any Safety Orientations performed today NO<br />
D. Safety Violation Notifications issued? NO<br />
Private & Confidential 3/24
E. Are emergency procedures established? Contact list, First Aid Kit in<br />
waterproof container. §1512. Emergency Medical Services.<br />
YES<br />
Photo 5 Photo 6 Photo 7<br />
F. Attach photos to identify contractor's on site first aid and CPR certified<br />
workers.<br />
YES<br />
Photo 8<br />
G. Attach photos of OSHA required posters. YES<br />
Photo 9 Photo 10<br />
H. Did Owner's Safety Representative perform a job walk today? if so, list<br />
all safety concerns along with photos accompanied by your abated photos.<br />
I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />
and along with your abated photos.<br />
NO<br />
NO<br />
2. HEAT ILLNESS PREVENTION 100%<br />
A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />
Photo 11<br />
B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />
canopy)<br />
SAFE<br />
Private & Confidential 4/24
Photo 12<br />
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
SAFE<br />
Photo 13<br />
D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />
for workers with sign in sheet?<br />
SAFE<br />
Photo 14<br />
3. FIRE PREVENTION & PROTECTION 100%<br />
A. Approved gas containers<br />
SAFE<br />
Photo 15<br />
B. Fire extinguishers available and inspected SAFE<br />
Photo 16 Photo 17 Photo 18<br />
Private & Confidential 5/24
3a Protection from Wildfire Smoke<br />
A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />
B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />
considered unhealthy)<br />
N/A<br />
C. Was Wildfire Smoke Training provided for workers? N/A<br />
4. PERSONAL PROTECTIVE EQUIPMENT 100%<br />
A. Approved hard hats SAFE<br />
Photo 19<br />
B. Safety glasses SAFE<br />
Photo 20<br />
D. Are respirators required for any work being performed on site? If so,<br />
were they provided by the employer in conjunction with the required<br />
controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />
SAFE<br />
Photo 21<br />
Are respirators voluntarily being used? If so, are worker trained on<br />
hazards associated with the environment?<br />
N/A<br />
E. Proper foot wear SAFE<br />
Private & Confidential 6/24
Photo 22<br />
F. Proper clothing/hand protection/reflective vests SAFE<br />
Photo 23<br />
• Do you have hoists, cranes, derricks & rigging on your site?<br />
• Do you have heavy equipment in your site?<br />
NO<br />
YES<br />
6. HEAVY EQUIPMENT 1 failed, 75%<br />
A. Seat belts used correctly SAFE<br />
Photo 24<br />
B. Operators properly trained and authorized SAFE<br />
Photo 25<br />
C. Daily pre-use inspections done and documented.1926.601(b)(14),<br />
Cal/Osha Article 10. Haulage and Earth Moving §1593.<br />
DEFICIENT<br />
Photo 26<br />
D. Backup alarms and signal men SAFE<br />
Private & Confidential 7/24
Photo 27<br />
7. ELECTRICAL TOOLS 100%<br />
A. Terminal boxes covered N/A<br />
B. Ground prong in place N/A<br />
C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />
removed<br />
N/A<br />
D. Temp / permanent lighting adequate and protected N/A<br />
E. GFCI’s in place N/A<br />
F. Mechanical guards in place SAFE<br />
Photo 28<br />
G. Proper tools for each job SAFE<br />
Photo 29 Photo 30 Photo 31 Photo 32 Photo 33<br />
H. Powder actuated tools operated by qualified persons N/A<br />
I. Tools inspected. Defected tools removed from service N/A<br />
8. FALL PROTECTION<br />
A. Fall protection policy in effect (6’) N/A<br />
B. PFAS worn correctly N/A<br />
C. Inspection and maintenance of PFAS conducted N/A<br />
D. Employees trained in fall protection and fall hazard recognition N/A<br />
Private & Confidential 8/24
9. BARRICADES / GUARD RAILS / STAIRS 1 failed, 75%<br />
A. Floor / wall openings covered & labeled SAFE<br />
Good Storm water pollution protection with straw wattles in place.<br />
Photo 34 Photo 35<br />
B. Roadways, walkways and stairs free of obstacles DEFICIENT<br />
Hazard: impalement hazard no caps on metal stakes in work area.<br />
Corrective Action: Informed Forman to remove or cover with caps or cones. Forman removed all metal stakes upon<br />
request.<br />
Photo 36 Photo 37 Photo 38 Photo 39<br />
C. Adequate lighting SAFE<br />
Photo 40<br />
D. Trenches and excavations SAFE<br />
Worker watering dirt to remove any dust hazards.<br />
Photo 41<br />
• Do you have ladders in your site?<br />
• Is their scaffolding on site?<br />
• Is welding or cutting being performed on site?<br />
NO<br />
NO<br />
NO<br />
Private & Confidential 9/24
• Are their any excavations or shoring on site?<br />
• Is their any concrete work being performed on site?<br />
• Is any steel erection work being performed on site?<br />
• Is their any mobile equipment on site?<br />
• Do you have any confined space work being performed on site?<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
CONTRACTORS (List our client first) 100%<br />
Please click "Add Contractor" button.<br />
Contractor 100%<br />
Contractor 1 100%<br />
Name of Contractor/Company<br />
ATD<br />
Corona Virus (COVID-19) Procedures In Place<br />
Yes<br />
Photo 42 Photo 43 Photo 44<br />
JHA Verified<br />
Yes<br />
Photo 45<br />
Toolbox<br />
Yes<br />
Photo 46<br />
Head Count 5<br />
DAILY SAFETY NARRATIVE (DSN)<br />
Private & Confidential 10/24
Please put your Daily Safety Narrative here<br />
Safety Evaluation <strong>Report</strong> at Target Chase Bank Lake Elsinore.<br />
Met with Foreman Sixtoes and Chris. The crew is landscaping parking lot in preparation for asphalt. Also removing<br />
dirt off site with pick up truck.<br />
The fire extinguisher was inspected for the following:<br />
1.) Valid monthly and yearly dates<br />
2.) The safety pin is in place<br />
3.) Pressure gauge reads 'charged'<br />
4.) Good condition without damage<br />
During the evaluation, I noted the following safety concerns:<br />
1) Hazard: impalement hazard no caps on metal stakes in work area.<br />
Corrective Action: Informed Forman to remove or cover with caps or cones. Forman removed all metal stakes upon<br />
request.<br />
2)Hazard: Bobcat without a fire extinguisher. Maintenance Manual SMCS Code: 7000;7419 reads, "Make sure that<br />
a fire extinguisher is on the machine. Make sure that you are familiar with the operation of the fire extinguisher...<br />
Mount the fire extinguisher on the left side of the cab behind the seat."<br />
Corrective Action: Informed Mike and Teodocio to put extinguisher inside of the cab. Foreman let me know that<br />
extinguisher is too big to fit inside and it would compromise his operating space. I recommended that they keep<br />
extinguisher at least 10ft from the working area until the proper extinguisher is purchased and mounted.<br />
No injures were reported during my evaluation. This concludes my report.<br />
COMPLETION AND SIGN-OFF<br />
Auditor<br />
Name and Signature<br />
Sean Carr<br />
3rd Jun, <strong>2020</strong> 1:05 PM PDT<br />
Private & Confidential 11/24
Safety Evaluation <strong>Report</strong> (SER)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong>/ Pasadena / 1 Jun <strong>2020</strong><br />
/ Sean Carr Complete<br />
Score 94.74% Failed items 2 Actions<br />
0<br />
Client / Site<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong>/<br />
Pasadena<br />
Date of Audit 1st Jun, <strong>2020</strong><br />
Prepared by<br />
Location<br />
Sean Carr<br />
233–263 S Mentor Ave<br />
Pasadena CA 91106<br />
United States<br />
(34.14192165716937, -<br />
118.1310954039154)<br />
Private & Confidential 1/21
Failed Items<br />
2 failed<br />
E. GFCI’s in place DEFICIENT<br />
Hazard: No GFCI or generator used for power tools.<br />
Corrective Action: Foreman abated the hazard with use of GFCI.<br />
Photo 23 Photo 24<br />
F. Mechanical guards in place DEFICIENT<br />
Hazard: No guard on grinder on site.<br />
Corrective Action: Foreman removed grinder off site and replaced it with one with guard and protection for workers.<br />
Photo 25 Photo 26<br />
Private & Confidential 2/21
Audit 2 failed, 94.74%<br />
CONTRACTOR AND PROJECT INFORMATION<br />
Contractor<br />
Safety Manager<br />
Project Name<br />
Project Number<br />
Project Manager<br />
Superintendent<br />
Inspector of Record (IOR)<br />
Today's Weather Conditions (include 5 day forecast)<br />
<strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
Sean Carr<br />
Randy’s Donut Pasadena<br />
Pasadena<br />
John <strong>Torres</strong><br />
Jesus Pineda<br />
N/A<br />
Clear<br />
Photo 1<br />
1. PROGRAM ADMINISTRATION 100%<br />
A. Attach photo of Safety Program YES<br />
Photo 2<br />
B. Attach photo of Weekly Safety Meeting NO<br />
C. Were any Safety Orientations performed today NO<br />
D. Safety Violation Notifications issued? NO<br />
E. Are emergency procedures established? Contact list, First Aid Kit in<br />
waterproof container. §1512. Emergency Medical Services.<br />
YES<br />
Private & Confidential 3/21
Photo 3 Photo 4<br />
F. Attach photos to identify contractor's on site first aid and CPR certified<br />
workers.<br />
YES<br />
Photo 5<br />
G. Attach photos of OSHA required posters. YES<br />
Photo 6 Photo 7<br />
H. Did Owner's Safety Representative perform a job walk today? if so, list<br />
all safety concerns along with photos accompanied by your abated photos.<br />
I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />
and along with your abated photos.<br />
NO<br />
NO<br />
2. HEAT ILLNESS PREVENTION 100%<br />
A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />
Photo 8<br />
B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />
canopy)<br />
SAFE<br />
Private & Confidential 4/21
Photo 9<br />
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
SAFE<br />
Photo 10<br />
D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />
for workers with sign in sheet?<br />
N/A<br />
3. FIRE PREVENTION & PROTECTION 100%<br />
A. Approved gas containers<br />
N/A<br />
B. Fire extinguishers available and inspected SAFE<br />
The fire extinguisher was inspected for the following:<br />
1.) Valid monthly and yearly dates<br />
2.) The safety pin is in place<br />
3.) Pressure gauge reads 'charged'<br />
4.) Good condition without damage<br />
Photo 11 Photo 12 Photo 13<br />
3a Protection from Wildfire Smoke<br />
A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />
B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />
considered unhealthy)<br />
N/A<br />
C. Was Wildfire Smoke Training provided for workers? N/A<br />
Private & Confidential 5/21
4. PERSONAL PROTECTIVE EQUIPMENT 100%<br />
A. Approved hard hats SAFE<br />
Photo 14<br />
B. Safety glasses SAFE<br />
Photo 15<br />
D. Are respirators required for any work being performed on site? If so,<br />
were they provided by the employer in conjunction with the required<br />
controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />
SAFE<br />
Photo 16<br />
Are respirators voluntarily being used? If so, are worker trained on<br />
hazards associated with the environment?<br />
N/A<br />
E. Proper foot wear SAFE<br />
Photo 17<br />
F. Proper clothing/hand protection/reflective vests SAFE<br />
Photo 18 Photo 19<br />
Private & Confidential 6/21
• Do you have hoists, cranes, derricks & rigging on your site?<br />
• Do you have heavy equipment in your site?<br />
NO<br />
NO<br />
7. ELECTRICAL TOOLS 2 failed, 50%<br />
A. Terminal boxes covered N/A<br />
B. Ground prong in place SAFE<br />
Photo 20 Photo 21 Photo 22<br />
C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />
removed<br />
N/A<br />
D. Temp / permanent lighting adequate and protected N/A<br />
E. GFCI’s in place DEFICIENT<br />
Hazard: No GFCI or generator used for power tools.<br />
Corrective Action: Foreman abated the hazard with use of GFCI.<br />
Photo 23 Photo 24<br />
F. Mechanical guards in place DEFICIENT<br />
Hazard: No guard on grinder on site.<br />
Corrective Action: Foreman removed grinder off site and replaced it with one with guard and protection for workers.<br />
Photo 25 Photo 26<br />
G. Proper tools for each job SAFE<br />
Private & Confidential 7/21
Photo 27 Photo 28<br />
H. Powder actuated tools operated by qualified persons N/A<br />
I. Tools inspected. Defected tools removed from service N/A<br />
8. FALL PROTECTION<br />
A. Fall protection policy in effect (6’) N/A<br />
B. PFAS worn correctly N/A<br />
C. Inspection and maintenance of PFAS conducted N/A<br />
D. Employees trained in fall protection and fall hazard recognition N/A<br />
9. BARRICADES / GUARD RAILS / STAIRS 100%<br />
A. Floor / wall openings covered & labeled N/A<br />
B. Roadways, walkways and stairs free of obstacles SAFE<br />
Photo 29 Photo 30<br />
C. Adequate lighting SAFE<br />
Photo 31<br />
D. Trenches and excavations N/A<br />
• Do you have ladders in your site?<br />
YES<br />
10. LADDERS 100%<br />
A. Secured to prevent slipping, sliding or falling SAFE<br />
Private & Confidential 8/21
Photo 32<br />
B. Side rails extend 36” above top of landing, tied off and secured. N/A<br />
C. Step ladders fully open when in use. SAFE<br />
Photo 33<br />
• Is their scaffolding on site?<br />
• Is welding or cutting being performed on site?<br />
• Are their any excavations or shoring on site?<br />
• Is their any concrete work being performed on site?<br />
• Is any steel erection work being performed on site?<br />
• Is their any mobile equipment on site?<br />
• Do you have any confined space work being performed on site?<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
CONTRACTORS (List our client first) 100%<br />
Please click "Add Contractor" button.<br />
Contractor 100%<br />
Contractor 1 100%<br />
Name of Contractor/Company<br />
ATD<br />
Corona Virus (COVID-19) Procedures In Place<br />
Yes<br />
Photo 34 Photo 35 Photo 36 Photo 37<br />
JHA Verified<br />
Yes<br />
Private & Confidential 9/21
Photo 38<br />
Toolbox<br />
N/A<br />
Head Count 6<br />
DAILY SAFETY NARRATIVE (DSN)<br />
Please put your Daily Safety Narrative here<br />
I arrived on-site at the Randy’s Donut in Pasadena and met with Foreman Jesus Pineda.<br />
He has a 6 man crew on site they are doing a demolition job on the interior of donut shop on the 1st floor. All<br />
workers properly attired with PPE during job walk.<br />
The fire extinguisher was inspected for the following:<br />
1.) Valid monthly and yearly dates<br />
2.) The safety pin is in place<br />
3.) Pressure gauge reads 'charged'<br />
4.) Good condition without damage<br />
During my evaluation, we identified and mitigated the following safety concerns:<br />
1.) Hazard: No GFCI or generator used for power tools.<br />
Corrective Action: Foreman abated the hazard with the use of GFCI.<br />
2.) Hazard: No guard on grinder on-site.<br />
Corrective Action: Foreman removed grinder off-site and replaced it with one with guard and protection for workers.<br />
No injuries were reported during my evaluation. This concludes my report.<br />
COMPLETION AND SIGN-OFF<br />
Auditor<br />
Name and Signature<br />
Sean Carr<br />
1st Jun, <strong>2020</strong> 10:02 AM PDT<br />
Private & Confidential 10/21
EMPLOYEE<br />
CORRECTIVE<br />
MEASURES
Corrective Measures Summary<br />
<strong>June</strong> <strong>2020</strong><br />
EMPLOYEE CORRECTIVE MEASURES<br />
Infractions will receive an Employee Corrective Measures form. When an infraction is committed, a verbal<br />
warning will be issued, and the form will serve as a record. The 5 Keys implemented to assist and help<br />
with understanding are the following: 1.) Establish 2.) Enforce 3.) Monitor 4.) Train 5.) Assist.<br />
DATE & JOBSITE EMPLOYEE/WORKER VIOLATION<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6
INCIDENT LOGS
Incident Log <strong>June</strong> <strong>2020</strong><br />
Note:<br />
Please continue to encourage all of our employees to report minor incidents including cuts, scratches, and bruises. As<br />
well as major incidents such as slips, falls, sprains, and broken bones as soon as possible; ensure that all foreman have<br />
incident response packets available on hand at all times.<br />
Minor Incident example: scraped knee, puncture finger with staple gun.<br />
Major Incidents include: Fall from ladder, eye puncture, circular saw cut, property damage.<br />
OPEN INCIDENTS<br />
NAME OF EMPLOYEE DATE/TIME DESCRIPTION SEVERITY OF<br />
INJURIES/ILLNESS<br />
NO INCIDENTS TO REPORT FOR JUNE <strong>2020</strong><br />
CLOSED INCIDENT<br />
NAME OF EMPLOYEE BRIEF DESCRIPTION SEVERITY OF INJURY/ILLNESS CLOSING<br />
DATE<br />
Prepared by The Price of Safety on behalf of <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
TRAINING SUMMARY
Strategic Training Calendar<br />
<strong>2020</strong><br />
January February March<br />
OSHA FOCUS FOUR: CAUGHT<br />
IN/BETWEEN<br />
1.) OSHA Focus Four Caught<br />
in/Caught in-between<br />
2.) Hazards<br />
3.) Prevention<br />
4.) Additional Tips<br />
OSHA FOCUS FOUR:<br />
ELECTROCUTION<br />
5.) OSHA Focus Four Electrocution<br />
6.) Hazards<br />
7.) Prevention<br />
8.) Additional Tips<br />
OSHA FOCUS FOUR: FALLS<br />
9.) OSHA Focus Four Fall<br />
Prevention<br />
10.) Hazards<br />
11.) Prevention<br />
12.) Additional Tips<br />
April May <strong>June</strong><br />
OSHA FOCUS FOUR: STRUCK BY HEAT ILLNESS PREVENTION PERSONAL PROTECTIVE<br />
EQUIPMENT<br />
13.) OSHA Focus Four Struck-By<br />
Hazards<br />
14.) Training and tools<br />
15.) Fire Extinguishers and Labels<br />
16.) Additional Tips<br />
16.) Heat Stress<br />
17.) Preventative Actions<br />
18.) Signs and Symptoms<br />
19.) Additional Tips<br />
20.) Eye Safety<br />
21.) Impact Hazards<br />
22.) Heat Injuries<br />
23.) Chemical Injuries<br />
24.) Important Tips<br />
July August September<br />
FIRE SAFETY HEAVY EQUIPMENT FALL PROTECTION<br />
25.) Fire Prevention<br />
26.) Alertness and Signs<br />
27.) Heat Injuries<br />
28.) Chemical Injuries<br />
October November December<br />
HOUSEKEEPING/SIGNS AND<br />
BARRICADES<br />
SEASONAL FLU/COLD STRESS<br />
OSHA VISITS
Strategic Training Log: <strong>June</strong> <strong>2020</strong><br />
SUMMARY:<br />
This log chronicles all training provided for the required yearly training calendar according to OSHA. It also<br />
details training that will take place this month, based upon the failed items from the previous month.<br />
Please encourage all foremen to attend to scheduled trainings.<br />
Thank you for your support!<br />
TRAINING PROVIDED THIS PERIOD<br />
TITLE COURSE DATE/TIME DESCRIPTION NOTES<br />
Weekly safety topics:<br />
Heat Illness Prevention<br />
Awareness Heat Illness<br />
Prevention<br />
Foremen to conduct<br />
Weekly Safety<br />
Meetings to be<br />
conducted every<br />
Monday, by 7:30am<br />
<strong>June</strong> 23,<strong>2020</strong><br />
1. Personal<br />
Protective<br />
Equipment: Eye<br />
Safety<br />
2. Impact Hazards<br />
3. Heat Injuries<br />
4. Chemical<br />
Injuries<br />
Additional Tips<br />
to Remember<br />
On-site training was<br />
conducted in San Dimas<br />
with Foreman Jesus<br />
Pineda and crew.<br />
Weekly Safety Topics sent to<br />
admin@anthonytorresdemolition.com<br />
Received 5/29/<strong>2020</strong><br />
Heat Illness Prevention covers Heat<br />
Stress/Illness. We identified signs and<br />
symptoms, accumulation, buddy-system,<br />
water intake, actions to take, and they<br />
were also given suggestions on how to<br />
see daily weather updates.<br />
AWARENESS LEVEL NEEDED FOR JUNE <strong>2020</strong><br />
TRAINING COURSE BRIEF DESCRIPTION DATE/TIME CLOSING DATE<br />
Fall Protection Awareness<br />
Level Training<br />
Basic guidelines and methods<br />
for Fall Protection on job-sites.<br />
Foreman’s Meeting<br />
TBD<br />
Heat Stress/ Illness<br />
Training to prevent workers from<br />
heat stress, identifying signs<br />
symptoms, accumulation,<br />
prevention, and steps to take in<br />
the event an employee<br />
experiences heat stress.<br />
Continued: On site training August <strong>2020</strong><br />
Prepared by The Price of Safety on behalf of <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
WEEKLY SAFETY TOPIC<br />
RECORDS/ROSTERS
PERSONAL PROTECTION || Eye Safety<br />
Week 1<br />
According to the Centers for Disease Control and Prevention (CDC),<br />
each day about 2000 U.S. workers have a job-related eye injury that<br />
requires medical treatment. About one third of the injuries are treated in<br />
hospital emergency departments and more than 100 of these injuries result<br />
in one or more days of lost work.<br />
Workers can get particles of<br />
• dust<br />
• metal<br />
• wood<br />
• glass<br />
• concrete<br />
• plastic or other hard substances in their eyes. In addition, chemicals,<br />
acids, sparks, hot oil, fire and steam are also eye hazards.<br />
OSHA Standard 1926.28(a) The employer is<br />
responsible for requiring the wearing of<br />
appropriate personal protective equipment in<br />
all operations where there is an exposure to<br />
hazardous conditions or where this part<br />
indicates the need for using such equipment to<br />
reduce the hazards to the employees.<br />
thepriceofsafety.com<br />
1
PERSONAL PROTECTION || Eye Safety<br />
Week 2<br />
‣ Impact hazards are those that result from flying or falling objects,<br />
or sparks striking the eye. Eye protection for these hazards are safety<br />
spectacles with side shields or goggles.<br />
OSHA Standard 1926.102(a)(1) Employees shall be provided with eye and face<br />
protection equipment when machines or operations present potential eye or face<br />
injury from physical, chemical, or radiation agents.<br />
Impact hazards can be created by grinding or cutting tools such as the bench grinder above.<br />
thepriceofsafety.com<br />
2
PERSONAL PROTECTION || Eye Safety<br />
Week 3<br />
‣ Heat injuries may occur to the eye and face when workers<br />
are exposed to high temperatures, splashes of molten<br />
metal, or hot sparks. Eye protection for these hazards are<br />
safety spectacles with special-purpose lenses and side shields<br />
or goggles.<br />
Worker properly welding with<br />
protective eye/face equipment.<br />
Prevent injuries: wear safety glasses, goggles, or other approved<br />
eye/face protection.<br />
Workers need to protect their eyes from a variety of dangers such as:<br />
• flying dust, dirt, or sand particles<br />
• slivers of metal, wood, or glass<br />
• fragments of concrete or rock<br />
• chemicals, sparks, UV light and lasers<br />
thepriceofsafety.com<br />
3
PERSONAL PROTECTION || Eye Safety<br />
Week 4<br />
‣ Chemical injuries often result from an inappropriate choice of<br />
PPE, that allows a chemical substance to enter from around or<br />
under protective eye equipment. Eye protection for these<br />
hazards are goggles, face shields and eyewash stations.<br />
Worker using proper eye and face protection.<br />
Chemical exposure could occur in everyday tasks such as<br />
pouring concrete.<br />
thepriceofsafety.com<br />
4
PERSONAL PROTECTION || Eye Safety<br />
Week 5<br />
‣ Remember these important tips to avoid eye injuries:<br />
• Always use safety glasses or goggles designed for the task.<br />
• Protect your eyes from debris and particles getting into your eyes<br />
by using goggles.<br />
• Use eye protection designed specifically for welding or cutting<br />
activities.<br />
• In addition to safety glasses or goggles wear a face shield if there<br />
is any potential for chemicals or particles causing injury to your<br />
face.<br />
• Safety glasses must be rated ANSI Z87.1.<br />
• Prescription lenses must also be rated ANSI Z87.1 or safety<br />
glasses will be required over your prescription glasses.<br />
Safety glasses must be rated American National Standards Institute, (ANSI) Z87.1.<br />
thepriceofsafety.com<br />
5
ADDITIONAL SERVICES
Additional Services: <strong>June</strong> <strong>2020</strong><br />
BELOW IS A RECORD OF THE ADDITIONAL SUPPORT PROVIDED FOR YOUR SAFETY SERVICES.<br />
TITLE DATE DESCRIPTION NOTES<br />
Virtual Evaluation and<br />
Deficiency Follow-up.<br />
Virtual Evaluation and<br />
Deficiency Follow-up.<br />
5.19.<strong>2020</strong> On 5/18/<strong>2020</strong><br />
Foreman Juan Duarte<br />
had active electrical<br />
cords exposed on his<br />
site in Irvine, CA. The<br />
following day on the<br />
site, Mayra Martinez<br />
ensured the hot wires<br />
were not posing a<br />
hazard to the crew and<br />
visitors.<br />
5.27.<strong>2020</strong> Victor Escobar, yard<br />
personnel, has been<br />
searching for suitable<br />
fire-resistant cabinets<br />
for the flammable<br />
liquids stored at the<br />
yard. Mayra Martinez<br />
followed up on the<br />
pending approval of<br />
the cabinets.<br />
Mayra Martinez<br />
requested a picture of<br />
the site where the hot<br />
wires were located to<br />
ensure they did not<br />
pose a shock hazard.<br />
Multiple fire cabinets<br />
were purchased to<br />
appropriately store all<br />
flammable liquids at the<br />
ATD Yard.
Prepared by The Price of Safety on behalf of <strong>Anthony</strong> <strong>Torres</strong> <strong>Demolition</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com