Emmons Roofing Service June 2020 Report
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SAFETY REPORT <strong>June</strong> <strong>2020</strong><br />
Issued July <strong>2020</strong><br />
<strong>Emmons</strong> Roof <strong>Service</strong><br />
www.roofingcontractorontarioca.com | 890 Ontario Blvd., Ontario, CA
EMMONS<br />
<strong>June</strong> <strong>2020</strong><br />
SAFETY COMMITTEE MEETINGS
www.thepriceofsafety.com<br />
info@thepriceofsafety.com<br />
The Price of Safety Inc - Safety Committee Meeting Minutes<br />
JULY 14, <strong>2020</strong><br />
1485 SPRUCE STREET, SUITE M<br />
RIVERSIDE, CA 92507<br />
MEETING CALLED BY<br />
TYPE OF MEETING<br />
FACILITATOR<br />
NOTE TAKER<br />
NEXT MEETING<br />
ATTENDEES<br />
Mayra Redmond<br />
Safety Committee Meeting<br />
Mayra Martinez<br />
Mayra Martinez<br />
TBD<br />
Miguel Bazan, Bob <strong>Emmons</strong>, Mayra Martinez<br />
Old Business<br />
COMMUNICATION<br />
& COORDINATION<br />
MAYRA MARTINEZ<br />
Due to schedule conflicts with Emmon’s Management team, the Safety Committee Meeting was cancelled.<br />
Please see below New Business Section below.<br />
5.1 Summary of Meetings, Trainings, and Action Items<br />
DISCUSSION<br />
• Mayra Martinez facilitated a Safety Committee Meeting with Emmon’s Management on May 12,<br />
<strong>2020</strong><br />
• Bob <strong>Emmons</strong>, Miguel Bazan, and Mayra Martinez were in attendance as scheduled.<br />
Summary of Topics from last meeting:<br />
• CPR recertification<br />
• Create Mitigation Plan for Damaged Equipment<br />
• On-site Training<br />
• Yard Inspection Mitigation Process<br />
CONCLUSIONS<br />
Dai/ 5.2 SCM Summary:<br />
CPR Recertification<br />
• The CPR Certifications of employees will be expiring August <strong>2020</strong>. Bob Sr. stated he would like to certify all<br />
employees on site.<br />
Create Mitigation Plan for Damaged Equipment<br />
• Challenge: Damaged equipment is not being removed from work trucks or jobsites<br />
Results of Root Cause Analysis: After speaking with Willie Diaz, we discovered that he is no longer<br />
assigned to retrieve damaged equipment from jobsites, and there is no communication between the<br />
foreman and himself regarding damaged equipment.<br />
Solution: I suggest a tagging system be implemented. For example, green and red tags to identify ‘out of<br />
service’ and ‘cleared for service’. Emmon’s has 3 evaluations per month, during these evaluations’ safety<br />
Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
On-site Training<br />
will red tag to identify damaged equipment and communicate with the Foreman and Willie to remove from<br />
service and or repair. However, for the other jobsites that safety does not evaluate, <strong>Emmons</strong> will need to<br />
determine how to manage damaged equipment.<br />
Moving forward, when The Price of Safety finds defective equipment, the mitigation place is as follows:<br />
1.) Damaged equipment will be tagged and the Foreman or Leadman will remove it from site, and it will<br />
be taken to Willie at the yard.<br />
2.) The Price of Safety will notify Emmon’s Management of the discovered damaged equipment<br />
3.) Willie will determine if the equipment needs to be repaired or replaced<br />
4.) Safety will follow up with Willie to confirm that the damaged equipment was not returned to the active<br />
job sites and was taken care of accordingly.<br />
• Training will be conducted on-site due to CDC guidelines regarding COVID 19.<br />
Yard Inspection Mitigation Process<br />
• A yard inspection was conducted on March 24, <strong>2020</strong>. Willie Diaz is in progress of mitigating the deficiencies<br />
including inspecting fire extinguishers, removing unlabeled liquids, proper storage, and housekeeping.<br />
ACTION ITEMS PERSON RESPONSIBLE DEADLINE<br />
Implement Green/Red Tagging System Miguel Bazan/Foremen <strong>June</strong> <strong>2020</strong><br />
Yard Inspection Deficiency Mitigation Follow-up Mayra Martinez/Willie Diaz July <strong>2020</strong><br />
On-site Training Mayra Martinez/ Safety Team <strong>June</strong> 8-12<br />
SAFETY EVALUATIONS REVIEW<br />
5.3 The Price of Safety Performed the following Safety Evaluations for the month of May <strong>2020</strong>:<br />
1. 5/15/<strong>2020</strong> Mayra Martinez performed SER @ Target, Redlands/Foreman: Sergio Paez (Please Review<br />
SER) 3 Failed items | 2 Abated Items | Inspection Score: 93.02%<br />
2. 5/19/<strong>2020</strong> Mayra Martinez performed SER @ Target, La Mesa / Foreman: Edgar Bazan<br />
(Please Review SER) 7 Failed Items | 6 Abated Items | Inspection Score: 84.09%<br />
3. 5/20/<strong>2020</strong> Mayra Martinez performed SER @ Long Beach: Sergio Paez<br />
(Please Review SER)1 Failed Item | 1 Abated Item | Inspection Score: 97.5%<br />
DISCUSSION<br />
5.4 The Price of Safety Performed the following Safety Evaluations for the month of <strong>June</strong> <strong>2020</strong>:<br />
1. 6/3/<strong>2020</strong> Sean Carr performed SER @ Target, La Mesa/Foreman: Edgar Bazan (Please Review SER) 5<br />
Failed items | 4 Abated Items | Inspection Score: 88.1%<br />
2. 6/9/<strong>2020</strong> Sean Carr performed SER @ San Diego / Foreman: Martin Bazan<br />
(Please Review SER) 1 Failed Items | 1 Abated Items | Inspection Score: 95.35%<br />
3. 6/30/<strong>2020</strong> Mayra Martinez performed SER @ Target, Eagle Rock/ Foreman: Edgar Bazan<br />
(Please Review SER)2 Failed Item | 2 Abated Item | Inspection Score: 97.37%<br />
CONCLUSIONS<br />
Although an average score of 91.5% for the month of May, and 93.6% for <strong>June</strong>, is great improvement, the following<br />
deficiencies were found on site. Means and methods will be put in place and implemented to reduce these<br />
deficiencies in the future. (See Synopsis)<br />
• Program Administration<br />
Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
• Fire Extinguisher<br />
• Damaged Cords/ Tools<br />
• Ladder Fall Hazards<br />
• Improper use of rails on Scissor Lift<br />
• Personal Protective Equipment<br />
• Fall hazards<br />
• Floor Openings<br />
ACTION ITEMS<br />
PERSON<br />
RESPONSIBLE<br />
DEADLINE<br />
Employee Corrective Measures for PPE Deficiencies Mayra Martinez Inspect Monthly<br />
COVID19 Safety Plan<br />
Copy of Safety Program on all jobsites – Follow up inspection<br />
<strong>Emmons</strong> Management Completed<br />
<strong>Emmons</strong> Management/<br />
Mayra Martinez<br />
<strong>June</strong> <strong>2020</strong><br />
TRAINING REVIEW<br />
5.4 Fall Protection<br />
Due to CDC COVID19 Social Distancing requirements, Emmon’s Management has postponed training until further<br />
notice.<br />
Weekly Safety Meetings were sent to Miguel Bazan on 4/24/<strong>2020</strong> for the month of May.<br />
The topics included the following:<br />
DISCUSSION<br />
1. OSHA Focus Four: Struck-By Hazards<br />
2. Tools and Training<br />
3. Prevention and Protection<br />
4. Additional Tips to Remember<br />
Weekly Safety Meetings were sent to Miguel Bazan on 5/29/<strong>2020</strong> for the month of <strong>June</strong>.<br />
The Topics included the following:<br />
1. Personal Protective Equipment: Eye Safety<br />
2. Impact Hazards<br />
3. Heat Injuries<br />
4. Chemical Injuries<br />
5. Additional Tips to Remember<br />
CONCLUSIONS Training was held at the <strong>Emmons</strong> location.<br />
ACTION ITEMS PERSON RESPONSIBLE DEADLINE<br />
COVID 19 Training Adjustments Mayra Martinez/Miguel Bazan <strong>June</strong> <strong>2020</strong><br />
Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
New Business<br />
6.1<br />
• COVID19 Training Adjustments<br />
• Implement Tagging System for Damaged Equipment<br />
• CPR Certification Training<br />
DISCUSSION<br />
CONCLUSIONS<br />
ACTION ITEMS PERSON RESPONSIBLE DEADLINE<br />
Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
SAFETY SYNOPSIS
EMMON’S ROOFING SVC SAFETY SYNOPSIS<br />
<strong>June</strong> <strong>2020</strong><br />
Below are our suggestions for mitigation strategies that ATD can implement during the second quarter of <strong>2020</strong>.<br />
To effectively mitigate and control workplace safety risks, we will continue training on the project- risk mitigation plans before<br />
employees are exposed to risks. Construction hazards can potentially increase risks and lead to workplace injuries. A clear<br />
understanding of hazards, risks, and types of potential impacting factors provide the foundation for developing an effective risk<br />
mitigation plan.<br />
Summary of Means<br />
The means that will be used for barrier identification<br />
include:<br />
• Virtual Safety Evaluations<br />
• Foreman Follow up/ Deficiencies and<br />
challenges<br />
These measures will help us ascertain the leading<br />
and lagging indicators to help reduce incidents and<br />
injuries<br />
Summary of Recommendations<br />
Based on data collected and forecasted scope of<br />
work, we recommend Anthony Torres implement<br />
the following mitigation strategies:<br />
• COVID19: Alternative Virtual Meetings<br />
• Continue Foreman Training<br />
• Operator Certifications<br />
Analytic Overview<br />
Prepared by The Price of Safety on behalf of <strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
SITE STATISTICS
Site Statistics <strong>June</strong> <strong>2020</strong><br />
QUARTERLY SUMMARY RESULTS<br />
This report is focused on the quarterly progress for <strong>Emmons</strong> Roof <strong>Service</strong> and reflects the safety site statistics per<br />
job-site. The criteria will help identify the leading indicators and will assist in creating proactive and conceptual<br />
safety strategies that will decrease incidents and ascertain training recommendations.<br />
Foreman April May <strong>June</strong><br />
Martin Bazan N/A N/A 97.37%<br />
Edgar Bazan 95.45% 84.09% 88.1%, 95.35<br />
Bob Crawford N/A N/A N/A<br />
Sergio Paez 97.5% 93.02%,97.5% N/A<br />
Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong>s, Inc.<br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
SAFETY<br />
PERFORMANCE
Monthly Safety Performance <strong>Report</strong><br />
<strong>June</strong> <strong>2020</strong> <strong>Emmons</strong> Roof <strong>Service</strong> 06.01.<strong>2020</strong> - 06.30.<strong>2020</strong><br />
Jobsites Evaluated<br />
Foreman Location Results <strong>Emmons</strong> Notified<br />
Edgar Bazan La Mesa, CA 5 Failed Responses / 4 Abated / 88.1% Miguel Bazan<br />
Martin Bazan San Diego, CA 1 Failed Responses / 1 Abated / 97.37%% Miguel Bazan<br />
Edgar Bazan Eagle Rock, CA 2 Failed Response / 2 Abated / 95.35% Miguel Bazan<br />
Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
SAFETY EVALUATION<br />
REPORTS
Safety Evaluation <strong>Report</strong> (SER)<br />
<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong> / 30 Jun <strong>2020</strong> / Mayra<br />
Martinez<br />
Complete<br />
Score 95.35% Failed items 2 Actions<br />
0<br />
Client / Site<br />
<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />
Date of Audit 30th Jun, <strong>2020</strong><br />
Prepared by<br />
Location<br />
Mayra Martinez<br />
2626 Colorado Blvd<br />
Los Angeles CA 90041<br />
United States<br />
(34.14111509655074, -<br />
118.22382297597734)<br />
Private & Confidential 1/24
Failed Items<br />
2 failed<br />
C. Inspection and maintenance of PFAS conducted DEFICIENT<br />
Fall Protection Equipment Hazard: The fall protection harnesses were not up to date on their inspections.<br />
On one harness, the last inspection was conducted in January <strong>2020</strong>. The second harness has not yet been signed.<br />
Per the manufacturers instructions, the harness is to be inspected and signed by a competent person every 6<br />
months.<br />
Corrective action: I showed Foreman Edgar Bazan the inspection tags and advised that they one harness would be<br />
due for a formal inspection and the other had not been signed. He stated the harnesses were not in use today as the<br />
crew was only unloading today and the roof hatch access had been closed by a Target Representative. However, he<br />
will sign them tomorrow and send pictures for a follow-up.<br />
Photo 28 Photo 29<br />
B. Side rails extend 36” above top of landing, tied off and secured. DEFICIENT<br />
Fall hazard: The side rails did not extend 36” above the top of the landing on an extension ladder.<br />
Corrective Action: I advised Foreman Edgar of the ladder hazard and explained to him that the ladder needed to<br />
extend 36” Above the landing to be in compliance. Foreman Edgar lowered and removed the ladder and stated he<br />
needed a ladder extension and would request one from management.<br />
Photo 34<br />
Private & Confidential 2/24
Audit 2 failed, 95.35%<br />
CONTRACTOR AND PROJECT INFORMATION<br />
Contractor <strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />
Safety Manager Mayra Martinez<br />
Project Name Target Eagle Rock<br />
Project Number Eagle Rock<br />
Project Manager Miguel Bazan<br />
Superintendent Edgar Bazan<br />
Inspector of Record (IOR) N/A<br />
Today's Weather Conditions (include 5 day forecast)<br />
Clear<br />
Photo 1<br />
1. PROGRAM ADMINISTRATION 100%<br />
A. Attach photo of Safety Program YES<br />
Photo 2<br />
B. Attach photo of Weekly Safety Meeting YES<br />
Photo 3 Photo 4<br />
C. Were any Safety Orientations performed today NO<br />
D. Safety Violation Notifications issued? NO<br />
Private & Confidential 3/24
E. Are emergency procedures established? Contact list, First Aid Kit in<br />
waterproof container. §1512. Emergency Medical <strong>Service</strong>s.<br />
YES<br />
Photo 5<br />
F. Attach photos to identify contractor's on site first aid and CPR certified<br />
workers.<br />
YES<br />
Photo 6<br />
G. Attach photos of OSHA required posters. YES<br />
Photo 7<br />
H. Did Owner's Safety Representative perform a job walk today? if so, list<br />
all safety concerns along with photos accompanied by your abated photos.<br />
I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />
and along with your abated photos.<br />
NO<br />
NO<br />
2. HEAT ILLNESS PREVENTION 100%<br />
A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />
Photo 8<br />
B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />
canopy)<br />
N/A<br />
Private & Confidential 4/24
Photo 9 Photo 10<br />
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
SAFE<br />
Photo 11 Photo 12<br />
D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />
for workers with sign in sheet?<br />
N/A<br />
3. FIRE PREVENTION & PROTECTION 100%<br />
A. Approved gas containers<br />
SAFE<br />
Photo 13<br />
B. Fire extinguishers available and inspected SAFE<br />
The fire protection on site is adequate. I inspected the extinguishers for the following:<br />
1.) good condition without damage<br />
2.) Valid inspection dates including yearly and monthly inspections<br />
3.) pressure gauge reads “charged”<br />
4.) safety pin is secured and in place<br />
Photo 14 Photo 15 Photo 16 Photo 17<br />
3a Protection from Wildfire Smoke<br />
Private & Confidential 5/24
A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />
B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />
considered unhealthy)<br />
N/A<br />
C. Was Wildfire Smoke Training provided for workers? N/A<br />
4. PERSONAL PROTECTIVE EQUIPMENT 100%<br />
A. Approved hard hats SAFE<br />
Photo 18<br />
B. Safety glasses SAFE<br />
Photo 19<br />
D. Are respirators required for any work being performed on site? If so,<br />
were they provided by the employer in conjunction with the required<br />
controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />
Are respirators voluntarily being used? If so, are worker trained on<br />
hazards associated with the environment?<br />
N/A<br />
N/A<br />
E. Proper foot wear SAFE<br />
Photo 20<br />
F. Proper clothing/hand protection/reflective vests SAFE<br />
Photo 21<br />
Private & Confidential 6/24
• Do you have hoists, cranes, derricks & rigging on your site?<br />
• Do you have heavy equipment in your site?<br />
NO<br />
NO<br />
7. ELECTRICAL TOOLS 100%<br />
A. Terminal boxes covered SAFE<br />
B. Ground prong in place SAFE<br />
Photo 22 Photo 23<br />
C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />
removed<br />
N/A<br />
D. Temp / permanent lighting adequate and protected SAFE<br />
E. GFCI’s in place SAFE<br />
Photo 24<br />
F. Mechanical guards in place N/A<br />
G. Proper tools for each job SAFE<br />
H. Powder actuated tools operated by qualified persons N/A<br />
I. Tools inspected. Defected tools removed from service SAFE<br />
Photo 25<br />
8. FALL PROTECTION 1 failed, 66.67%<br />
A. Fall protection policy in effect (6’) SAFE<br />
Private & Confidential 7/24
Photo 26 Photo 27<br />
B. PFAS worn correctly N/A<br />
C. Inspection and maintenance of PFAS conducted DEFICIENT<br />
Fall Protection Equipment Hazard: The fall protection harnesses were not up to date on their inspections.<br />
On one harness, the last inspection was conducted in January <strong>2020</strong>. The second harness has not yet been signed.<br />
Per the manufacturers instructions, the harness is to be inspected and signed by a competent person every 6<br />
months.<br />
Corrective action: I showed Foreman Edgar Bazan the inspection tags and advised that they one harness would be<br />
due for a formal inspection and the other had not been signed. He stated the harnesses were not in use today as the<br />
crew was only unloading today and the roof hatch access had been closed by a Target Representative. However, he<br />
will sign them tomorrow and send pictures for a follow-up.<br />
Photo 28 Photo 29<br />
D. Employees trained in fall protection and fall hazard recognition SAFE<br />
9. BARRICADES / GUARD RAILS / STAIRS 100%<br />
A. Floor / wall openings covered & labeled N/A<br />
B. Roadways, walkways and stairs free of obstacles SAFE<br />
Photo 30 Photo 31<br />
C. Adequate lighting SAFE<br />
Private & Confidential 8/24
Photo 32<br />
D. Trenches and excavations N/A<br />
• Do you have ladders in your site?<br />
YES<br />
10. LADDERS 1 failed, 50%<br />
A. Secured to prevent slipping, sliding or falling SAFE<br />
Photo 33<br />
B. Side rails extend 36” above top of landing, tied off and secured. DEFICIENT<br />
Fall hazard: The side rails did not extend 36” above the top of the landing on an extension ladder.<br />
Corrective Action: I advised Foreman Edgar of the ladder hazard and explained to him that the ladder needed to<br />
extend 36” Above the landing to be in compliance. Foreman Edgar lowered and removed the ladder and stated he<br />
needed a ladder extension and would request one from management.<br />
Photo 34<br />
C. Step ladders fully open when in use. N/A<br />
• Is their scaffolding on site?<br />
• Is welding or cutting being performed on site?<br />
• Are their any excavations or shoring on site?<br />
• Is their any concrete work being performed on site?<br />
• Is any steel erection work being performed on site?<br />
• Is their any mobile equipment on site?<br />
• Do you have any confined space work being performed on site?<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
Private & Confidential 9/24
CONTRACTORS (List our client first) 100%<br />
Please click "Add Contractor" button.<br />
Contractor 100%<br />
Contractor 1 100%<br />
Name of Contractor/Company<br />
Corona Virus (COVID-19) Procedures In Place<br />
<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />
Yes<br />
Photo 35 Photo 36 Photo 37 Photo 38<br />
JHA Verified<br />
Yes<br />
Photo 39<br />
Toolbox<br />
Yes<br />
Photo 40 Photo 41<br />
Head Count 12<br />
DAILY SAFETY NARRATIVE (DSN)<br />
Private & Confidential 10/24
Please put your Daily Safety Narrative here<br />
I arrived on site at Target Eagle Rock while the crew was taking their lunch break. I accessed the roof by roof hatch<br />
and began my evaluation.<br />
We have a 12-man crew and they are loading onto the site.<br />
Upon their arrival back from lunch, the crew was preparing to depart the site. They gathered all equipment and<br />
ensured the job boxes were locked and secured.<br />
During my evaluation, I observed the following safety concerns:<br />
1.) Fall Protection Equipment Hazard: The fall protection harnesses were not up to date on their inspections.<br />
On one harness, the last inspection was conducted in January <strong>2020</strong>. The second harness has not yet been signed.<br />
Per the manufacturers instructions, the harness is to be inspected and signed by a competent person every 6<br />
months.<br />
Corrective action: I showed Foreman Edgar Bazan the inspection tags and advised that they one harness would be<br />
due for a formal inspection and the other had not been signed. He stated the harnesses were not in use today as the<br />
crew was only unloading today and the roof hatch access had been closed by a Target Representative. However, he<br />
will sign them tomorrow and send pictures for a follow-up.<br />
2.) Fall hazard: The side rails did not extend 36” above the top of the landing on an extension ladder.<br />
Corrective Action: I advised Foreman Edgar of the ladder hazard and explained to him that the ladder needed to<br />
extend 36” Above the landing to be in compliance. Foreman Edgar lowered and removed the ladder and stated he<br />
needed a ladder extension and would request one from management.<br />
The COVID19 procedures were in place with hand sanitizer available as soon as we got back into the target<br />
stockroom and also inside the portable restroom. The restroom was clean and stocked. The last maintenance was<br />
conducted on 6/23. All crew members were wearing masks and gloves.<br />
I also gave Foreman Edgar 5 red-tags to begin implementing a Tagging System for deficient equipment.<br />
No injuries were reported during my evaluation.<br />
This concludes my report.<br />
COMPLETION AND SIGN-OFF<br />
Auditor<br />
Name and Signature<br />
Mayra Martinez<br />
30th Jun, <strong>2020</strong> 2:15 PM PDT<br />
Private & Confidential 11/24
Safety Evaluation <strong>Report</strong> (SER)<br />
<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong>/ La Mesa / 3 Jun <strong>2020</strong> /<br />
Sean Carr<br />
Complete<br />
Score 88.1% Failed items 5 Actions<br />
0<br />
Client / Site<br />
<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong>/ La Mesa<br />
Date of Audit 3rd Jun, <strong>2020</strong><br />
Prepared by<br />
Location<br />
Sean Carr<br />
5500 Grossmont Center Dr<br />
La Mesa CA 91942<br />
United States<br />
(32.779607456208, -<br />
117.0114798379289)<br />
Private & Confidential 1/29
Failed Items<br />
5 failed<br />
A. Approved hard hats DEFICIENT<br />
Hazard: Worker without hard hat on while onsite.<br />
Corrective Action: Worker put hard on when notified.<br />
Photo 17 Photo 18 Photo 19 Photo 20 Photo 21<br />
B. Safety glasses DEFICIENT<br />
Hazard: Worker wearing Oakley sunglasses.<br />
Corrective Action: Foreman supplied worker with proper Z87 safety glasses.<br />
Photo 22 Photo 23<br />
A. Fall protection policy in effect (6’) DEFICIENT<br />
Parapet above 42 inches around working area preventing fall hazard for workers.<br />
Hazard: Worker witnessed working above 6ft without any fall protection or guardrail system in place.<br />
Corrective Action: Forman notified immediately worker was provided with Fall protection Harness to prevent fall<br />
hazard.<br />
Photo 34 Photo 35 Photo 36 Photo 37 Photo 38<br />
Corona Virus (COVID-19) Procedures In Place<br />
No<br />
Workers did not have any Covid-19 sign in sheet onsite.<br />
Private & Confidential 2/29
Photo 47 Photo 48 Photo 49<br />
JHA Verified<br />
No<br />
Workers did not have JHA documentation on site.<br />
Private & Confidential 3/29
Audit 5 failed, 88.1%<br />
CONTRACTOR AND PROJECT INFORMATION<br />
Contractor<br />
Safety Manager<br />
Project Name<br />
Project Number<br />
Project Manager<br />
Superintendent<br />
Inspector of Record (IOR)<br />
Today's Weather Conditions (include 5 day forecast)<br />
<strong>Emmons</strong> <strong>Roofing</strong><br />
Sean Carr<br />
Target San Diego<br />
Target<br />
Miguel Bazan<br />
Edgar Bazan<br />
N/A<br />
Clear<br />
Photo 1<br />
1. PROGRAM ADMINISTRATION 100%<br />
A. Attach photo of Safety Program YES<br />
Photo 2<br />
B. Attach photo of Weekly Safety Meeting YES<br />
Photo 3 Photo 4<br />
C. Were any Safety Orientations performed today NO<br />
D. Safety Violation Notifications issued? NO<br />
Private & Confidential 4/29
E. Are emergency procedures established? Contact list, First Aid Kit in<br />
waterproof container. §1512. Emergency Medical <strong>Service</strong>s.<br />
YES<br />
Photo 5 Photo 6<br />
F. Attach photos to identify contractor's on site first aid and CPR certified<br />
workers.<br />
YES<br />
Photo 7<br />
G. Attach photos of OSHA required posters. YES<br />
Edgar provided a few posters that he had but does not have complete packet of OSHA required posters on site.<br />
Photo 8 Photo 9<br />
H. Did Owner's Safety Representative perform a job walk today? if so, list<br />
all safety concerns along with photos accompanied by your abated photos.<br />
I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />
and along with your abated photos.<br />
NO<br />
NO<br />
2. HEAT ILLNESS PREVENTION 100%<br />
A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />
Photo 10<br />
B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />
canopy)<br />
SAFE<br />
Private & Confidential 5/29
Photo 11<br />
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
SAFE<br />
Photo 12<br />
D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />
for workers with sign in sheet?<br />
N/A<br />
3. FIRE PREVENTION & PROTECTION 100%<br />
A. Approved gas containers<br />
SAFE<br />
Photo 13<br />
B. Fire extinguishers available and inspected SAFE<br />
The fire extinguisher was inspected for the following:<br />
1.) Valid monthly and yearly dates<br />
2.) The safety pin is in place<br />
3.) Pressure gauge reads 'charged'<br />
4.) Good condition without damage<br />
Photo 14 Photo 15 Photo 16<br />
3a Protection from Wildfire Smoke<br />
Private & Confidential 6/29
A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />
B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />
considered unhealthy)<br />
N/A<br />
C. Was Wildfire Smoke Training provided for workers? N/A<br />
4. PERSONAL PROTECTIVE EQUIPMENT 2 failed, 60%<br />
A. Approved hard hats DEFICIENT<br />
Hazard: Worker without hard hat on while onsite.<br />
Corrective Action: Worker put hard on when notified.<br />
Photo 17 Photo 18 Photo 19 Photo 20 Photo 21<br />
B. Safety glasses DEFICIENT<br />
Hazard: Worker wearing Oakley sunglasses.<br />
Corrective Action: Foreman supplied worker with proper Z87 safety glasses.<br />
Photo 22 Photo 23<br />
D. Are respirators required for any work being performed on site? If so,<br />
were they provided by the employer in conjunction with the required<br />
controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />
Are respirators voluntarily being used? If so, are worker trained on<br />
hazards associated with the environment?<br />
N/A<br />
SAFE<br />
Photo 24<br />
E. Proper foot wear SAFE<br />
Private & Confidential 7/29
Photo 25<br />
F. Proper clothing/hand protection/reflective vests SAFE<br />
Photo 26<br />
• Do you have hoists, cranes, derricks & rigging on your site?<br />
• Do you have heavy equipment in your site?<br />
NO<br />
NO<br />
7. ELECTRICAL TOOLS 100%<br />
A. Terminal boxes covered N/A<br />
B. Ground prong in place SAFE<br />
Photo 27 Photo 28 Photo 29<br />
C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />
removed<br />
N/A<br />
D. Temp / permanent lighting adequate and protected N/A<br />
E. GFCI’s in place SAFE<br />
Photo 30<br />
F. Mechanical guards in place N/A<br />
G. Proper tools for each job SAFE<br />
Private & Confidential 8/29
Photo 31 Photo 32 Photo 33<br />
H. Powder actuated tools operated by qualified persons N/A<br />
I. Tools inspected. Defected tools removed from service N/A<br />
8. FALL PROTECTION 1 failed, 0%<br />
A. Fall protection policy in effect (6’) DEFICIENT<br />
Parapet above 42 inches around working area preventing fall hazard for workers.<br />
Hazard: Worker witnessed working above 6ft without any fall protection or guardrail system in place.<br />
Corrective Action: Forman notified immediately worker was provided with Fall protection Harness to prevent fall<br />
hazard.<br />
Photo 34 Photo 35 Photo 36 Photo 37 Photo 38<br />
B. PFAS worn correctly N/A<br />
C. Inspection and maintenance of PFAS conducted N/A<br />
D. Employees trained in fall protection and fall hazard recognition N/A<br />
9. BARRICADES / GUARD RAILS / STAIRS 100%<br />
A. Floor / wall openings covered & labeled SAFE<br />
Photo 39<br />
B. Roadways, walkways and stairs free of obstacles SAFE<br />
Private & Confidential 9/29
Photo 40<br />
C. Adequate lighting SAFE<br />
Photo 41<br />
D. Trenches and excavations N/A<br />
• Do you have ladders in your site?<br />
YES<br />
10. LADDERS 100%<br />
A. Secured to prevent slipping, sliding or falling SAFE<br />
Photo 42<br />
B. Side rails extend 36” above top of landing, tied off and secured. SAFE<br />
Photo 43 Photo 44 Photo 45<br />
C. Step ladders fully open when in use. N/A<br />
• Is their scaffolding on site?<br />
YES<br />
11. SCAFFOLDING 100%<br />
A. Erected and dismantled properly. Scaffold tag procedure followed. N/A<br />
B. Competent person N/A<br />
C. Foot pads and mud sills provided N/A<br />
Private & Confidential 10/29
D. Workers protected from falling objects from above N/A<br />
E. Scaffolds plumb and square with full bracing SAFE<br />
Scaffold wheels locked while in use.<br />
Photo 46<br />
F. Top and mid-rails in place, toe boards and complete deck N/A<br />
G. Ladder access available for use N/A<br />
• Is welding or cutting being performed on site?<br />
• Are their any excavations or shoring on site?<br />
• Is their any concrete work being performed on site?<br />
• Is any steel erection work being performed on site?<br />
• Is their any mobile equipment on site?<br />
• Do you have any confined space work being performed on site?<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
CONTRACTORS (List our client first) 2 failed, 33.33%<br />
Please click "Add Contractor" button.<br />
Contractor 2 failed, 33.33%<br />
Contractor 1 2 failed, 33.33%<br />
Name of Contractor/Company<br />
<strong>Emmons</strong><br />
Corona Virus (COVID-19) Procedures In Place<br />
No<br />
Workers did not have any Covid-19 sign in sheet onsite.<br />
Photo 47 Photo 48 Photo 49<br />
JHA Verified<br />
No<br />
Workers did not have JHA documentation on site.<br />
Toolbox<br />
Yes<br />
Private & Confidential 11/29
Photo 50 Photo 51<br />
Head Count 5<br />
DAILY SAFETY NARRATIVE (DSN)<br />
Please put your Daily Safety Narrative here<br />
Safety Evaluation <strong>Report</strong> at Target San Diego at the Grossmont Shipping Center.<br />
Met with Foreman Edgar Bazan. The crew is finishing final touch ups of membrane installation and removing trash<br />
and debris.<br />
During the evaluation, I noted the following safety concerns:<br />
1.)Foreman Edgar Bazan did not have The completed mobile OSHA posters inside the Foreman's binder. Edgar did<br />
not have copies of Covid-19 awareness or JHA forms.<br />
Note: All proper documentation should be located on the job site at all times.<br />
2.) Hazard: Worker wearing Oakley sunglasses.<br />
Corrective Action: Foreman supplied worker with proper Z87 safety glasses.<br />
3.) Hazard: Worker without hard hat on while onsite.<br />
Corrective Action: Worker put hard on when notified.<br />
4.) Hazard: Worker witnessed working above 6ft without any fall protection or guardrail system in place.<br />
Corrective Action: Forman notified immediately worker was provided with Fall protection Harness to prevent fall<br />
hazard.<br />
No injures were reported during my evaluation. This concludes my report.<br />
COMPLETION AND SIGN-OFF<br />
Private & Confidential 12/29
Auditor<br />
Name and Signature<br />
Sean Carr<br />
3rd Jun, <strong>2020</strong> 10:29 AM PDT<br />
Private & Confidential 13/29
Safety Evaluation <strong>Report</strong> (SER)<br />
<strong>Emmons</strong> <strong>Roofing</strong> /San Diego Costco / 9 Jun <strong>2020</strong> /<br />
Sean Carr<br />
Complete<br />
Score 97.37% Failed items 1 Actions<br />
0<br />
Client / Site<br />
<strong>Emmons</strong> <strong>Roofing</strong> /San Diego Costco<br />
Date of Audit 9th Jun, <strong>2020</strong><br />
Prepared by<br />
Location<br />
Sean Carr<br />
4601–4617 Morena Blvd<br />
San Diego CA 92117<br />
United States<br />
(32.82115001234489, -<br />
117.22460498112926)<br />
Private & Confidential 1/26
Failed Items<br />
1 failed<br />
A. Fall protection policy in effect (6’) DEFICIENT<br />
Hazard: Worker was not wearing any Fall protection while on roof. Parapet around roof is about 20 inches high.<br />
Corrective Action: Informed Martin that Workers should have a 6ft warning line around the roof and or workers need<br />
to be tied off %100 while on the roof.<br />
Foreman has all the equipment on roof but was not using it. Lanyards, Roof anchors and safety harness. Martin<br />
ensures me that workers will be tied off %100 while on roof throughout the day.<br />
Per Title 8 1730 (1) Employees shall be protected from falls from roofs of a height of more than 20 feet by use of<br />
one or a combination of the methods in this section.<br />
Hazard: Access and Egress fall hazard, workers climbing on side of scissor lift to access work area.<br />
Corrective Action: Informed Foreman to turn the lift adjacent to ensure workers can access roof without climbing on<br />
side of lift. At no time should a worker stand or climb on side of a scissor lift creating a fall hazard.<br />
Recommended that workers need to use a extension ladder with extended guard rail handles to ensure proper and<br />
safe access and egress moving forward.<br />
Photo 25 Photo 26 Photo 27 Photo 28 Photo 29 Photo 30<br />
Private & Confidential 2/26
Audit 1 failed, 97.37%<br />
CONTRACTOR AND PROJECT INFORMATION<br />
Contractor<br />
Safety Manager<br />
Project Name<br />
Project Number<br />
Project Manager<br />
Superintendent<br />
Inspector of Record (IOR)<br />
Today's Weather Conditions (include 5 day forecast)<br />
<strong>Emmons</strong> <strong>Roofing</strong><br />
Sean Carr<br />
Costco San Diego<br />
Costco<br />
Miguel Bazan<br />
Martin Bazan<br />
N/A<br />
Clear<br />
Photo 1<br />
1. PROGRAM ADMINISTRATION 100%<br />
A. Attach photo of Safety Program YES<br />
Photo 2<br />
B. Attach photo of Weekly Safety Meeting YES<br />
Photo 3<br />
C. Were any Safety Orientations performed today NO<br />
D. Safety Violation Notifications issued? NO<br />
Private & Confidential 3/26
E. Are emergency procedures established? Contact list, First Aid Kit in<br />
waterproof container. §1512. Emergency Medical <strong>Service</strong>s.<br />
YES<br />
Photo 4 Photo 5 Photo 6<br />
F. Attach photos to identify contractor's on site first aid and CPR certified<br />
workers.<br />
YES<br />
Photo 7<br />
G. Attach photos of OSHA required posters. YES<br />
Photo 8 Photo 9<br />
H. Did Owner's Safety Representative perform a job walk today? if so, list<br />
all safety concerns along with photos accompanied by your abated photos.<br />
I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />
and along with your abated photos.<br />
NO<br />
NO<br />
2. HEAT ILLNESS PREVENTION 100%<br />
A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />
Photo 10<br />
B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />
canopy)<br />
SAFE<br />
Private & Confidential 4/26
Photo 11<br />
C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />
drinking water available per worker with disposable cups, and trash can?<br />
(attach photo) Title 8, 1524, 3363 or 3457<br />
SAFE<br />
Photo 12<br />
D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />
for workers with sign in sheet?<br />
N/A<br />
3. FIRE PREVENTION & PROTECTION 100%<br />
A. Approved gas containers<br />
SAFE<br />
Photo 13<br />
B. Fire extinguishers available and inspected SAFE<br />
Photo 14 Photo 15<br />
3a Protection from Wildfire Smoke<br />
A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />
B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />
considered unhealthy)<br />
N/A<br />
C. Was Wildfire Smoke Training provided for workers? N/A<br />
Private & Confidential 5/26
4. PERSONAL PROTECTIVE EQUIPMENT 100%<br />
A. Approved hard hats SAFE<br />
Photo 16<br />
B. Safety glasses SAFE<br />
Photo 17<br />
D. Are respirators required for any work being performed on site? If so,<br />
were they provided by the employer in conjunction with the required<br />
controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />
Are respirators voluntarily being used? If so, are worker trained on<br />
hazards associated with the environment?<br />
N/A<br />
SAFE<br />
Photo 18<br />
E. Proper foot wear SAFE<br />
Photo 19 Photo 20<br />
F. Proper clothing/hand protection/reflective vests SAFE<br />
Photo 21<br />
Private & Confidential 6/26
• Do you have hoists, cranes, derricks & rigging on your site?<br />
• Do you have heavy equipment in your site?<br />
NO<br />
NO<br />
7. ELECTRICAL TOOLS 100%<br />
A. Terminal boxes covered N/A<br />
B. Ground prong in place N/A<br />
C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />
removed<br />
N/A<br />
D. Temp / permanent lighting adequate and protected N/A<br />
E. GFCI’s in place SAFE<br />
Photo 22<br />
F. Mechanical guards in place SAFE<br />
Photo 23<br />
G. Proper tools for each job SAFE<br />
Photo 24<br />
H. Powder actuated tools operated by qualified persons N/A<br />
I. Tools inspected. Defected tools removed from service N/A<br />
8. FALL PROTECTION 1 failed, 50%<br />
A. Fall protection policy in effect (6’) DEFICIENT<br />
Private & Confidential 7/26
Hazard: Worker was not wearing any Fall protection while on roof. Parapet around roof is about 20 inches high.<br />
Corrective Action: Informed Martin that Workers should have a 6ft warning line around the roof and or workers need<br />
to be tied off %100 while on the roof.<br />
Foreman has all the equipment on roof but was not using it. Lanyards, Roof anchors and safety harness. Martin<br />
ensures me that workers will be tied off %100 while on roof throughout the day.<br />
Per Title 8 1730 (1) Employees shall be protected from falls from roofs of a height of more than 20 feet by use of<br />
one or a combination of the methods in this section.<br />
Hazard: Access and Egress fall hazard, workers climbing on side of scissor lift to access work area.<br />
Corrective Action: Informed Foreman to turn the lift adjacent to ensure workers can access roof without climbing on<br />
side of lift. At no time should a worker stand or climb on side of a scissor lift creating a fall hazard.<br />
Recommended that workers need to use a extension ladder with extended guard rail handles to ensure proper and<br />
safe access and egress moving forward.<br />
Photo 25 Photo 26 Photo 27 Photo 28 Photo 29 Photo 30<br />
B. PFAS worn correctly SAFE<br />
Photo 31 Photo 32 Photo 33<br />
C. Inspection and maintenance of PFAS conducted N/A<br />
D. Employees trained in fall protection and fall hazard recognition N/A<br />
9. BARRICADES / GUARD RAILS / STAIRS 100%<br />
A. Floor / wall openings covered & labeled N/A<br />
B. Roadways, walkways and stairs free of obstacles N/A<br />
C. Adequate lighting SAFE<br />
Private & Confidential 8/26
Photo 34<br />
D. Trenches and excavations N/A<br />
• Do you have ladders in your site?<br />
• Is their scaffolding on site?<br />
• Is welding or cutting being performed on site?<br />
• Are their any excavations or shoring on site?<br />
• Is their any concrete work being performed on site?<br />
• Is any steel erection work being performed on site?<br />
• Is their any mobile equipment on site?<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
YES<br />
16. MOBILE EQUIPMENT<br />
A. Are imposed loads exerted on the life basket. N/A<br />
B. Are lifts operated within load capacities N/A<br />
C. Are lift occupants tied off to the designated anchorage points. N/A<br />
• Do you have any confined space work being performed on site?<br />
NO<br />
CONTRACTORS (List our client first) 100%<br />
Please click "Add Contractor" button.<br />
Contractor 100%<br />
Contractor 1 100%<br />
Name of Contractor/Company<br />
Corona Virus (COVID-19) Procedures In Place<br />
Yes<br />
<strong>Emmons</strong> <strong>Roofing</strong><br />
Photo 35 Photo 36 Photo 37 Photo 38<br />
Private & Confidential 9/26
JHA Verified<br />
Yes<br />
Photo 39<br />
Toolbox<br />
Yes<br />
Photo 40<br />
Head Count 3<br />
DAILY SAFETY NARRATIVE (DSN)<br />
Please put your Daily Safety Narrative here<br />
Private & Confidential 10/26
Sean Carr conducted a Safety Evaluation <strong>Report</strong> at Costco San Diego.<br />
I met with Foreman Martin Bazan. The crew is installing roof membrane.<br />
Weather will reach 80° today workers were reminded to get plenty of rest water and shade if need be throughout the<br />
day. Also conduct a buddy system to help prevent any heat stroke or heat exhaustion.<br />
During the evaluation, I noted the following safety concerns:<br />
1)Foreman Martin Bazan did not have a Pre-Task planner nor was it completed prior to the start of work.<br />
Note: I supplied a Pre-Task for Martin and documents completed immediately once notified.<br />
2)Hazard: Worker was not wearing any Fall protection while on roof. Parapet around roof is about 20 inches high.<br />
Corrective Action: Informed Martin that Workers should have a 6ft warning line around the roof and or workers need<br />
to be tied off %100 while on the roof.<br />
Foreman has all the equipment on roof but was not using it. Lanyards, Roof anchors and safety harness. Martin<br />
ensures me that workers will be tied off %100 while on roof throughout the day.<br />
Per Title 8 1730 (1) Employees shall be protected from falls from roofs of a height of more than 20 feet by use of<br />
one or a combination of the methods in this section.<br />
3)Hazard: Access and Egress tip over and fall hazard, workers climbing on side of scissor lift to access work area.<br />
Corrective Action: Informed Foreman to turn the lift adjacent to ensure workers can access roof without climbing on<br />
side of lift. At no time should a worker stand or climb on side of a scissor lift creating a fall and tip over hazard.<br />
Workers will wear harness and tie off prior to exiting lift to ensure %100 secure Fall protection.<br />
Recommended that workers need to use a extension ladder with extended guard rail handles to ensure proper and<br />
safe access and egress moving forward.<br />
No injures were reported during my evaluation. This concludes my report.<br />
COMPLETION AND SIGN-OFF<br />
Auditor<br />
Name and Signature<br />
Sean Carr<br />
9th Jun, <strong>2020</strong> 11:10 AM PDT<br />
Private & Confidential 11/26
EMPLOYEE<br />
CORRECTIVE<br />
MEASURES
Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com<br />
Corrective Measures Summary<br />
<strong>June</strong> <strong>2020</strong><br />
EMPLOYEE CORRECTIVE MEASURES<br />
Infractions will receive an Employee Corrective Measures form. When an infraction is committed, a verbal warning will be<br />
issued, and the form will serve as a record. The 5 Keys implemented to assist and help with understanding are the<br />
following: 1.) Establish 2.) Enforce 3.) Monitor 4.) Train 5.) Assist.<br />
DATE & JOBSITE EMPLOYEE/WORKER VIOLATION<br />
6/3/<strong>2020</strong><br />
La Mesa<br />
6/9/<strong>2020</strong><br />
San Diego<br />
Edgar Bazan<br />
Martin Bazan<br />
Foreman Edgar Bazan had multiple hazards<br />
on site, including an IDLH deficiency:<br />
• Personal Protective Equipment<br />
• Fall Hazards without Harness<br />
• Job Hazard Analysis<br />
Foreman Martin Bazan was witnessed not<br />
having a harness by a parapet wall of 20”,<br />
also a scissor lift was utilized as a means of<br />
access by climbing over its rails.
Employee Corrective Measures (ECM) <strong>Report</strong><br />
The ECM <strong>Report</strong> must be filled out by Management upon the notification of the infraction. Once it is completed please Email a copy<br />
to The Price of Safety to the following individuals: Safety Dept: info@thepriceofsafety.co; as well as a copy to the client contact<br />
WITHIN 24 HOURS.<br />
For assistance call (424) 744-1002<br />
Name of Worker/Employee<br />
Edgar Bazan<br />
Trade: Commercial Roofer<br />
Job Title:<br />
Foreman<br />
Employer/Contractor:<br />
Emmon’s <strong>Roofing</strong> <strong>Service</strong><br />
Date and Time of Incident:<br />
11:00 AM 6/3/<strong>2020</strong><br />
Location of Incident (Address):<br />
Grossmont Center, La Mesa<br />
Name of Supervisor:<br />
Miguel Bazan<br />
Supervisor's Number:<br />
Date Supervisor<br />
Notified: 6/3/<strong>2020</strong><br />
Form Completed By:<br />
Mayra Martinez<br />
Number<br />
(951)441-9230<br />
Date THE PRICE OF SAFETY notified:<br />
6/3/<strong>2020</strong><br />
Project Name and #:<br />
Was this incident in violation of a ❑ YES ❑ NO<br />
Target La Mesa<br />
company policy?<br />
Were there any witnesses? Name of Witness: Name of Witness:<br />
Yes<br />
Martin Bazan<br />
Type of Violation:<br />
No PPE<br />
Improper use of fall arrest (PFAS)<br />
Improper use of equipment<br />
Lack of Documentation<br />
Missing Required Certification<br />
Improper use of a vehicle/heavy equipment<br />
<br />
<br />
<br />
<br />
<br />
Improper guards<br />
Improper PPE<br />
Unsafe Act/Condition<br />
Failure to Secure/Warn<br />
Other:<br />
Fall Hazard<br />
Potential for<br />
Reoccurrence:<br />
Never<br />
Rare<br />
Occasional Frequent<br />
Has Employee been trained<br />
in the area violated?<br />
❑ YES ❑ NO<br />
❑ WARNED ❑ SUSPEND ❑ REMOVED FROM JOB SITE ❑ DISCHARGED<br />
Date of Previous Warning: Days Suspended: Date Removed:<br />
Dates of Suspension<br />
Full description of incident: (Please describe the occurrence- remember, this section is for facts, not<br />
opinions)<br />
Mr. Bazan had multiple deficiencies on his site. The hazards included an IDLH deficiency:<br />
• Fall Hazard without harness<br />
• No PPE (Safety Glasses)<br />
• No Job Hazard Analysis<br />
Worker's Statement:<br />
Mr. Bazan stated "I'll make sure going forward we are doing things correctly,just let me know what I need to fix."<br />
guar<br />
What Corrective Measures were taken/or suggested:<br />
• A harness was worn on the scaffold<br />
• Safety Glasses were given to employee<br />
• A job Hazard Analysis was completed<br />
What the situation defused or mitigated?<br />
Yes, all deficiencies were mitigated.<br />
Why or Why Not?<br />
Signature:<br />
Date:<br />
6//<strong>2020</strong>
Employee Corrective Measures (ECM) <strong>Report</strong><br />
The ECM <strong>Report</strong> must be filled out by Management upon the notification of the infraction. Once it is completed please Email a copy<br />
to The Price of Safety to the following individuals: Safety Dept: info@thepriceofsafety.co; as well as a copy to the client contact<br />
WITHIN 24 HOURS.<br />
For assistance call (424) 744-1002<br />
Name of Worker/Employee<br />
Martin Bazan<br />
Job Title:<br />
Roofer<br />
Employer/Contractor:<br />
<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />
Trade:<br />
Commercial <strong>Roofing</strong><br />
Date and Time of Incident:<br />
Location of Incident (Address):<br />
6/9/<strong>2020</strong><br />
Grossmont Center, La Mesa 4617 Morena BLVD, San Diego<br />
Name of Supervisor:<br />
Miguel Bazan<br />
Supervisor's Number:<br />
(909)721-2438<br />
Date Supervisor Notified:<br />
6/9/<strong>2020</strong><br />
Form Completed By:<br />
Mayra Martinez<br />
Number<br />
(951)441-9230<br />
Date THE PRICE OF SAFETY notified:<br />
6/9/<strong>2020</strong><br />
Project Name and #:<br />
Was this incident in violation of a ❑ YES ❑ NO<br />
La Mesa<br />
company policy?<br />
Were there any witnesses? Name of Witness: Name of Witness:<br />
Type of Violation:<br />
No PPE<br />
Improper use of fall arrest (PFAS)<br />
Improper use of equipment<br />
Lack of Documentation<br />
Missing Required Certification<br />
Improper use of a vehicle/heavy equipment<br />
<br />
<br />
<br />
<br />
<br />
Improper guards<br />
Improper PPE<br />
Unsafe Act/Condition<br />
Failure to Secure/Warn<br />
Other:<br />
Potential for<br />
Reoccurrence:<br />
Never<br />
Rare<br />
Occasional Frequent<br />
Has Employee been trained<br />
in the area violated?<br />
❑ YES ❑ NO<br />
❑ WARNED ❑ SUSPEND ❑ REMOVED FROM JOB SITE ❑ DISCHARGED<br />
Date of Previous Warning: Days Suspended: Date Removed:<br />
Dates of Suspension<br />
Full description of incident: (Please describe the occurrence- remember, this section is for facts, not<br />
opinions)<br />
Edgar Bazan was climbing on the rails of a scissor lift to access a roof.<br />
Worker's Statement:<br />
Mr. Bazan stated that he would wear a harness and relocate the scissor lift so it would be adjacent to the roof<br />
What Corrective Measures were taken/or suggested:<br />
Sean Carr advised that the scissor lift rails are not designed to be climbed on and hold additional weight. Mr. Bazan<br />
wore a harness and relocated the scissor lift to be adjacent to the roof to prevent climbing on the rails.<br />
What the situation defused or mitigated? Why or Why Not?<br />
Yes, the fall hazards were mitigated with proper fall protection<br />
Signature: Date: 6/9/<strong>2020</strong>
INCIDENT LOGS
Incident Log <strong>June</strong> <strong>2020</strong><br />
SUMMARY:<br />
There were no injuries or incidents observed or reported during the month of February.<br />
Note:<br />
Please continue to encourage all of our employees to report minor incidents including cuts, scratches, and<br />
bruises. As well as major incidents such as slips, falls, sprains, and broken bones as soon as possible; ensure<br />
that all foreman have incident response packets available on hand at all times.<br />
Minor Incident example: scraped knee, puncture finger with staple gun.<br />
Major Incidents include: Fall from ladder, eye puncture, circular saw cut, property damage.<br />
OPEN INCIDENTS<br />
NAME OF EMPLOYEE DATE/TIME DESCRIPTION SEVERITY OF<br />
INJURIES/ILLNESS<br />
NO INCIDENTS REPORTED FOR JUNE <strong>2020</strong><br />
CLOSED INCIDENT<br />
NAME OF EMPLOYEE BRIEF DESCRIPTION SEVERITY OF INJURY/ILLNESS CLOSING<br />
DATE<br />
Prepared by The Price of Safety on behalf of <strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
TRAINING SUMMARY
Strategic Training Calendar<br />
<strong>2020</strong><br />
January February March<br />
OSHA FOCUS FOUR: CAUGHT<br />
IN/BETWEEN<br />
1.) OSHA Focus Four Caught<br />
in/Caught in-between<br />
2.) Hazards<br />
3.) Prevention<br />
4.) Additional Tips<br />
OSHA FOCUS FOUR:<br />
ELECTROCUTION<br />
5.) OSHA Focus Four Electrocution<br />
6.) Hazards<br />
7.) Prevention<br />
8.) Additional Tips<br />
OSHA FOCUS FOUR: FALLS<br />
9.) OSHA Focus Four Fall<br />
Prevention<br />
10.) Hazards<br />
11.) Prevention<br />
12.) Additional Tips<br />
April May <strong>June</strong><br />
OSHA FOCUS FOUR: STRUCK BY HEAT ILLNESS PREVENTION PERSONAL PROTECTIVE<br />
EQUIPMENT<br />
13.) OSHA Focus Four Struck-By<br />
Hazards<br />
14.) Training and tools<br />
15.) Fire Extinguishers and Labels<br />
16.) Additional Tips<br />
16.) Heat Stress<br />
17.) Preventative Actions<br />
18.) Signs and Symptoms<br />
19.) Additional Tips<br />
20.) Eye Safety<br />
21.) Impact Hazards<br />
22.) Heat Injuries<br />
23.) Chemical Injuries<br />
24.) Important Tips<br />
July August September<br />
FIRE SAFETY HEAVY EQUIPMENT FALL PROTECTION<br />
25.) Fire Prevention<br />
26.) Alertness and Signs<br />
27.) Heat Injuries<br />
28.) Chemical Injuries<br />
October November December<br />
HOUSEKEEPING/SIGNS AND<br />
BARRICADES<br />
SEASONAL FLU/COLD STRESS<br />
OSHA VISITS
Strategic Training Schedule: JUNE <strong>2020</strong><br />
SUMMARY:<br />
Based upon the required yearly training calendar, as well as the failed items for the previous month, this is the<br />
suggested training schedule for the month of May.<br />
Note: please continue to encourage all of our employees to report incidents and near misses as soon as<br />
possible; ensure that all foreman have incident response packets available on hand at all times.<br />
REQUIRED TRAINING CONDUCTED<br />
TITLE COURSE DATE/TIME DESCRIPTION NOTES<br />
Weekly Safety Topics:<br />
Heat Illness Prevention<br />
Foremen to conduct<br />
Weekly Safety<br />
Meetings to be<br />
conducted every<br />
Monday, by 7:30am<br />
1.) PPE: Eye Safety<br />
2.) Impact Hazards<br />
3.) Heat Injuries<br />
4.) Chemical Injures<br />
5.) Additional Tips<br />
Weekly Safety Topics sent<br />
to<br />
miguel@emmonsroof.com<br />
Received 5/29/<strong>2020</strong><br />
Awareness Level<br />
Training:<br />
Heat Illness Prevention<br />
5/19 8:00 AM<br />
La Mesa with<br />
Foreman Edgar<br />
Bazan<br />
5/20 11:00 AM<br />
Long Beach with<br />
Foreman Sergio<br />
Paez<br />
Mayra Martinez<br />
conducted on-site training<br />
and covered the following:<br />
Heat Illness Prevention<br />
measures, signs,<br />
symptoms, accumulation,<br />
and what to do in the<br />
event of heat stress and<br />
heat stroke.<br />
Please see rosters.<br />
AWARENESS LEVEL NEEDED<br />
TRAINING COURSE BRIEF DESCRIPTION DATE/TIME CLOSING<br />
DATE<br />
Fall Protection<br />
Heat Illness ( continued)<br />
Fall protection requirements,<br />
hazard identification, systems,<br />
and donning of fall protection.<br />
Educate employers and<br />
workers on the dangers of<br />
working in the heat.<br />
Note: Foreman Martin<br />
Bazan’s Crew has not had<br />
Heat Illness Training.<br />
TBD <strong>Emmons</strong> Office<br />
August <strong>2020</strong><br />
*Postponed due to recent<br />
COVID19 outbreak and<br />
challenges<br />
TBD On-Site Training July <strong>2020</strong><br />
Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />
1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com
WEEKLY SAFETY TOPIC<br />
RECORDS/ROSTERS
PERSONAL PROTECTION || Eye Safety<br />
Week 1<br />
According to the Centers for Disease Control and Prevention (CDC),<br />
each day about 2000 U.S. workers have a job-related eye injury that<br />
requires medical treatment. About one third of the injuries are treated in<br />
hospital emergency departments and more than 100 of these injuries result<br />
in one or more days of lost work.<br />
Workers can get particles of<br />
• dust<br />
• metal<br />
• wood<br />
• glass<br />
• concrete<br />
• plastic or other hard substances in their eyes. In addition, chemicals,<br />
acids, sparks, hot oil, fire and steam are also eye hazards.<br />
OSHA Standard 1926.28(a) The employer is<br />
responsible for requiring the wearing of<br />
appropriate personal protective equipment in<br />
all operations where there is an exposure to<br />
hazardous conditions or where this part<br />
indicates the need for using such equipment to<br />
reduce the hazards to the employees.<br />
thepriceofsafety.com<br />
1
PERSONAL PROTECTION || Eye Safety<br />
Week 2<br />
‣ Impact hazards are those that result from flying or falling objects,<br />
or sparks striking the eye. Eye protection for these hazards are safety<br />
spectacles with side shields or goggles.<br />
OSHA Standard 1926.102(a)(1) Employees shall be provided with eye and face<br />
protection equipment when machines or operations present potential eye or face<br />
injury from physical, chemical, or radiation agents.<br />
Impact hazards can be created by grinding or cutting tools such as the bench grinder above.<br />
thepriceofsafety.com<br />
2
PERSONAL PROTECTION || Eye Safety<br />
Week 3<br />
‣ Heat injuries may occur to the eye and face when workers<br />
are exposed to high temperatures, splashes of molten<br />
metal, or hot sparks. Eye protection for these hazards are<br />
safety spectacles with special-purpose lenses and side shields<br />
or goggles.<br />
Worker properly welding with<br />
protective eye/face equipment.<br />
Prevent injuries: wear safety glasses, goggles, or other approved<br />
eye/face protection.<br />
Workers need to protect their eyes from a variety of dangers such as:<br />
• flying dust, dirt, or sand particles<br />
• slivers of metal, wood, or glass<br />
• fragments of concrete or rock<br />
• chemicals, sparks, UV light and lasers<br />
thepriceofsafety.com<br />
3
PERSONAL PROTECTION || Eye Safety<br />
Week 4<br />
‣ Chemical injuries often result from an inappropriate choice of<br />
PPE, that allows a chemical substance to enter from around or<br />
under protective eye equipment. Eye protection for these<br />
hazards are goggles, face shields and eyewash stations.<br />
Worker using proper eye and face protection.<br />
Chemical exposure could occur in everyday tasks such as<br />
pouring concrete.<br />
thepriceofsafety.com<br />
4
PERSONAL PROTECTION || Eye Safety<br />
Week 5<br />
‣ Remember these important tips to avoid eye injuries:<br />
• Always use safety glasses or goggles designed for the task.<br />
• Protect your eyes from debris and particles getting into your eyes<br />
by using goggles.<br />
• Use eye protection designed specifically for welding or cutting<br />
activities.<br />
• In addition to safety glasses or goggles wear a face shield if there<br />
is any potential for chemicals or particles causing injury to your<br />
face.<br />
• Safety glasses must be rated ANSI Z87.1.<br />
• Prescription lenses must also be rated ANSI Z87.1 or safety<br />
glasses will be required over your prescription glasses.<br />
Safety glasses must be rated American National Standards Institute, (ANSI) Z87.1.<br />
thepriceofsafety.com<br />
5
ADDITIONAL SERVICES
Additional <strong>Service</strong>s: <strong>June</strong> <strong>2020</strong><br />
BELOW IS A RECORD OF THE ADDITIONAL SUPPORT PROVIDED FOR YOUR SAFETY SERVICES.<br />
Virtual Evaluation:<br />
Edgar Bazan<br />
TITLE DATE DESCRIPTION NOTES<br />
6/30/<strong>2020</strong> A Safety Evaluation<br />
<strong>Report</strong> was conducted<br />
on Foreman Edgar<br />
Bazan’s Site in Eagle<br />
Rock. Two IDHL<br />
deficiencies were<br />
discovered.<br />
Mayra Martinez<br />
followed-up the<br />
following day to ensure<br />
the deficiencies were<br />
mitigated on site prior<br />
to work resuming on<br />
that project.<br />
Edgar sent a picture of<br />
a ladder extension and<br />
signed fall harness<br />
inspection tags.