SAFETY REPORT <strong>June</strong> <strong>2020</strong><br />

Issued July <strong>2020</strong><br />

<strong>Emmons</strong> Roof <strong>Service</strong><br />

www.roofingcontractorontarioca.com | 890 Ontario Blvd., Ontario, CA


EMMONS<br />

<strong>June</strong> <strong>2020</strong><br />

SAFETY COMMITTEE MEETINGS


www.thepriceofsafety.com<br />

info@thepriceofsafety.com<br />

The Price of Safety Inc - Safety Committee Meeting Minutes<br />

JULY 14, <strong>2020</strong><br />

1485 SPRUCE STREET, SUITE M<br />

RIVERSIDE, CA 92507<br />

MEETING CALLED BY<br />

TYPE OF MEETING<br />

FACILITATOR<br />

NOTE TAKER<br />

NEXT MEETING<br />

ATTENDEES<br />

Mayra Redmond<br />

Safety Committee Meeting<br />

Mayra Martinez<br />

Mayra Martinez<br />

TBD<br />

Miguel Bazan, Bob <strong>Emmons</strong>, Mayra Martinez<br />

Old Business<br />

COMMUNICATION<br />

& COORDINATION<br />

MAYRA MARTINEZ<br />

Due to schedule conflicts with Emmon’s Management team, the Safety Committee Meeting was cancelled.<br />

Please see below New Business Section below.<br />

5.1 Summary of Meetings, Trainings, and Action Items<br />

DISCUSSION<br />

• Mayra Martinez facilitated a Safety Committee Meeting with Emmon’s Management on May 12,<br />

<strong>2020</strong><br />

• Bob <strong>Emmons</strong>, Miguel Bazan, and Mayra Martinez were in attendance as scheduled.<br />

Summary of Topics from last meeting:<br />

• CPR recertification<br />

• Create Mitigation Plan for Damaged Equipment<br />

• On-site Training<br />

• Yard Inspection Mitigation Process<br />

CONCLUSIONS<br />

Dai/ 5.2 SCM Summary:<br />

CPR Recertification<br />

• The CPR Certifications of employees will be expiring August <strong>2020</strong>. Bob Sr. stated he would like to certify all<br />

employees on site.<br />

Create Mitigation Plan for Damaged Equipment<br />

• Challenge: Damaged equipment is not being removed from work trucks or jobsites<br />

Results of Root Cause Analysis: After speaking with Willie Diaz, we discovered that he is no longer<br />

assigned to retrieve damaged equipment from jobsites, and there is no communication between the<br />

foreman and himself regarding damaged equipment.<br />

Solution: I suggest a tagging system be implemented. For example, green and red tags to identify ‘out of<br />

service’ and ‘cleared for service’. Emmon’s has 3 evaluations per month, during these evaluations’ safety<br />

Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />

1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com


On-site Training<br />

will red tag to identify damaged equipment and communicate with the Foreman and Willie to remove from<br />

service and or repair. However, for the other jobsites that safety does not evaluate, <strong>Emmons</strong> will need to<br />

determine how to manage damaged equipment.<br />

Moving forward, when The Price of Safety finds defective equipment, the mitigation place is as follows:<br />

1.) Damaged equipment will be tagged and the Foreman or Leadman will remove it from site, and it will<br />

be taken to Willie at the yard.<br />

2.) The Price of Safety will notify Emmon’s Management of the discovered damaged equipment<br />

3.) Willie will determine if the equipment needs to be repaired or replaced<br />

4.) Safety will follow up with Willie to confirm that the damaged equipment was not returned to the active<br />

job sites and was taken care of accordingly.<br />

• Training will be conducted on-site due to CDC guidelines regarding COVID 19.<br />

Yard Inspection Mitigation Process<br />

• A yard inspection was conducted on March 24, <strong>2020</strong>. Willie Diaz is in progress of mitigating the deficiencies<br />

including inspecting fire extinguishers, removing unlabeled liquids, proper storage, and housekeeping.<br />

ACTION ITEMS PERSON RESPONSIBLE DEADLINE<br />

Implement Green/Red Tagging System Miguel Bazan/Foremen <strong>June</strong> <strong>2020</strong><br />

Yard Inspection Deficiency Mitigation Follow-up Mayra Martinez/Willie Diaz July <strong>2020</strong><br />

On-site Training Mayra Martinez/ Safety Team <strong>June</strong> 8-12<br />

SAFETY EVALUATIONS REVIEW<br />

5.3 The Price of Safety Performed the following Safety Evaluations for the month of May <strong>2020</strong>:<br />

1. 5/15/<strong>2020</strong> Mayra Martinez performed SER @ Target, Redlands/Foreman: Sergio Paez (Please Review<br />

SER) 3 Failed items | 2 Abated Items | Inspection Score: 93.02%<br />

2. 5/19/<strong>2020</strong> Mayra Martinez performed SER @ Target, La Mesa / Foreman: Edgar Bazan<br />

(Please Review SER) 7 Failed Items | 6 Abated Items | Inspection Score: 84.09%<br />

3. 5/20/<strong>2020</strong> Mayra Martinez performed SER @ Long Beach: Sergio Paez<br />

(Please Review SER)1 Failed Item | 1 Abated Item | Inspection Score: 97.5%<br />

DISCUSSION<br />

5.4 The Price of Safety Performed the following Safety Evaluations for the month of <strong>June</strong> <strong>2020</strong>:<br />

1. 6/3/<strong>2020</strong> Sean Carr performed SER @ Target, La Mesa/Foreman: Edgar Bazan (Please Review SER) 5<br />

Failed items | 4 Abated Items | Inspection Score: 88.1%<br />

2. 6/9/<strong>2020</strong> Sean Carr performed SER @ San Diego / Foreman: Martin Bazan<br />

(Please Review SER) 1 Failed Items | 1 Abated Items | Inspection Score: 95.35%<br />

3. 6/30/<strong>2020</strong> Mayra Martinez performed SER @ Target, Eagle Rock/ Foreman: Edgar Bazan<br />

(Please Review SER)2 Failed Item | 2 Abated Item | Inspection Score: 97.37%<br />

CONCLUSIONS<br />

Although an average score of 91.5% for the month of May, and 93.6% for <strong>June</strong>, is great improvement, the following<br />

deficiencies were found on site. Means and methods will be put in place and implemented to reduce these<br />

deficiencies in the future. (See Synopsis)<br />

• Program Administration<br />

Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />

1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com


• Fire Extinguisher<br />

• Damaged Cords/ Tools<br />

• Ladder Fall Hazards<br />

• Improper use of rails on Scissor Lift<br />

• Personal Protective Equipment<br />

• Fall hazards<br />

• Floor Openings<br />

ACTION ITEMS<br />

PERSON<br />

RESPONSIBLE<br />

DEADLINE<br />

Employee Corrective Measures for PPE Deficiencies Mayra Martinez Inspect Monthly<br />

COVID19 Safety Plan<br />

Copy of Safety Program on all jobsites – Follow up inspection<br />

<strong>Emmons</strong> Management Completed<br />

<strong>Emmons</strong> Management/<br />

Mayra Martinez<br />

<strong>June</strong> <strong>2020</strong><br />

TRAINING REVIEW<br />

5.4 Fall Protection<br />

Due to CDC COVID19 Social Distancing requirements, Emmon’s Management has postponed training until further<br />

notice.<br />

Weekly Safety Meetings were sent to Miguel Bazan on 4/24/<strong>2020</strong> for the month of May.<br />

The topics included the following:<br />

DISCUSSION<br />

1. OSHA Focus Four: Struck-By Hazards<br />

2. Tools and Training<br />

3. Prevention and Protection<br />

4. Additional Tips to Remember<br />

Weekly Safety Meetings were sent to Miguel Bazan on 5/29/<strong>2020</strong> for the month of <strong>June</strong>.<br />

The Topics included the following:<br />

1. Personal Protective Equipment: Eye Safety<br />

2. Impact Hazards<br />

3. Heat Injuries<br />

4. Chemical Injuries<br />

5. Additional Tips to Remember<br />

CONCLUSIONS Training was held at the <strong>Emmons</strong> location.<br />

ACTION ITEMS PERSON RESPONSIBLE DEADLINE<br />

COVID 19 Training Adjustments Mayra Martinez/Miguel Bazan <strong>June</strong> <strong>2020</strong><br />

Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />

1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com


New Business<br />

6.1<br />

• COVID19 Training Adjustments<br />

• Implement Tagging System for Damaged Equipment<br />

• CPR Certification Training<br />

DISCUSSION<br />

CONCLUSIONS<br />

ACTION ITEMS PERSON RESPONSIBLE DEADLINE<br />

Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />

1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com


SAFETY SYNOPSIS


EMMON’S ROOFING SVC SAFETY SYNOPSIS<br />

<strong>June</strong> <strong>2020</strong><br />

Below are our suggestions for mitigation strategies that ATD can implement during the second quarter of <strong>2020</strong>.<br />

To effectively mitigate and control workplace safety risks, we will continue training on the project- risk mitigation plans before<br />

employees are exposed to risks. Construction hazards can potentially increase risks and lead to workplace injuries. A clear<br />

understanding of hazards, risks, and types of potential impacting factors provide the foundation for developing an effective risk<br />

mitigation plan.<br />

Summary of Means<br />

The means that will be used for barrier identification<br />

include:<br />

• Virtual Safety Evaluations<br />

• Foreman Follow up/ Deficiencies and<br />

challenges<br />

These measures will help us ascertain the leading<br />

and lagging indicators to help reduce incidents and<br />

injuries<br />

Summary of Recommendations<br />

Based on data collected and forecasted scope of<br />

work, we recommend Anthony Torres implement<br />

the following mitigation strategies:<br />

• COVID19: Alternative Virtual Meetings<br />

• Continue Foreman Training<br />

• Operator Certifications<br />

Analytic Overview<br />

Prepared by The Price of Safety on behalf of <strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />

1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com


SITE STATISTICS


Site Statistics <strong>June</strong> <strong>2020</strong><br />

QUARTERLY SUMMARY RESULTS<br />

This report is focused on the quarterly progress for <strong>Emmons</strong> Roof <strong>Service</strong> and reflects the safety site statistics per<br />

job-site. The criteria will help identify the leading indicators and will assist in creating proactive and conceptual<br />

safety strategies that will decrease incidents and ascertain training recommendations.<br />

Foreman April May <strong>June</strong><br />

Martin Bazan N/A N/A 97.37%<br />

Edgar Bazan 95.45% 84.09% 88.1%, 95.35<br />

Bob Crawford N/A N/A N/A<br />

Sergio Paez 97.5% 93.02%,97.5% N/A<br />

Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong>s, Inc.<br />

1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com


SAFETY<br />

PERFORMANCE


Monthly Safety Performance <strong>Report</strong><br />

<strong>June</strong> <strong>2020</strong> <strong>Emmons</strong> Roof <strong>Service</strong> 06.01.<strong>2020</strong> - 06.30.<strong>2020</strong><br />

Jobsites Evaluated<br />

Foreman Location Results <strong>Emmons</strong> Notified<br />

Edgar Bazan La Mesa, CA 5 Failed Responses / 4 Abated / 88.1% Miguel Bazan<br />

Martin Bazan San Diego, CA 1 Failed Responses / 1 Abated / 97.37%% Miguel Bazan<br />

Edgar Bazan Eagle Rock, CA 2 Failed Response / 2 Abated / 95.35% Miguel Bazan<br />

Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />

1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com


SAFETY EVALUATION<br />

REPORTS


Safety Evaluation <strong>Report</strong> (SER)<br />

<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong> / 30 Jun <strong>2020</strong> / Mayra<br />

Martinez<br />

Complete<br />

Score 95.35% Failed items 2 Actions<br />

0<br />

Client / Site<br />

<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />

Date of Audit 30th Jun, <strong>2020</strong><br />

Prepared by<br />

Location<br />

Mayra Martinez<br />

2626 Colorado Blvd<br />

Los Angeles CA 90041<br />

United States<br />

(34.14111509655074, -<br />

118.22382297597734)<br />

Private & Confidential 1/24


Failed Items<br />

2 failed<br />

C. Inspection and maintenance of PFAS conducted DEFICIENT<br />

Fall Protection Equipment Hazard: The fall protection harnesses were not up to date on their inspections.<br />

On one harness, the last inspection was conducted in January <strong>2020</strong>. The second harness has not yet been signed.<br />

Per the manufacturers instructions, the harness is to be inspected and signed by a competent person every 6<br />

months.<br />

Corrective action: I showed Foreman Edgar Bazan the inspection tags and advised that they one harness would be<br />

due for a formal inspection and the other had not been signed. He stated the harnesses were not in use today as the<br />

crew was only unloading today and the roof hatch access had been closed by a Target Representative. However, he<br />

will sign them tomorrow and send pictures for a follow-up.<br />

Photo 28 Photo 29<br />

B. Side rails extend 36” above top of landing, tied off and secured. DEFICIENT<br />

Fall hazard: The side rails did not extend 36” above the top of the landing on an extension ladder.<br />

Corrective Action: I advised Foreman Edgar of the ladder hazard and explained to him that the ladder needed to<br />

extend 36” Above the landing to be in compliance. Foreman Edgar lowered and removed the ladder and stated he<br />

needed a ladder extension and would request one from management.<br />

Photo 34<br />

Private & Confidential 2/24


Audit 2 failed, 95.35%<br />

CONTRACTOR AND PROJECT INFORMATION<br />

Contractor <strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />

Safety Manager Mayra Martinez<br />

Project Name Target Eagle Rock<br />

Project Number Eagle Rock<br />

Project Manager Miguel Bazan<br />

Superintendent Edgar Bazan<br />

Inspector of Record (IOR) N/A<br />

Today's Weather Conditions (include 5 day forecast)<br />

Clear<br />

Photo 1<br />

1. PROGRAM ADMINISTRATION 100%<br />

A. Attach photo of Safety Program YES<br />

Photo 2<br />

B. Attach photo of Weekly Safety Meeting YES<br />

Photo 3 Photo 4<br />

C. Were any Safety Orientations performed today NO<br />

D. Safety Violation Notifications issued? NO<br />

Private & Confidential 3/24


E. Are emergency procedures established? Contact list, First Aid Kit in<br />

waterproof container. §1512. Emergency Medical <strong>Service</strong>s.<br />

YES<br />

Photo 5<br />

F. Attach photos to identify contractor's on site first aid and CPR certified<br />

workers.<br />

YES<br />

Photo 6<br />

G. Attach photos of OSHA required posters. YES<br />

Photo 7<br />

H. Did Owner's Safety Representative perform a job walk today? if so, list<br />

all safety concerns along with photos accompanied by your abated photos.<br />

I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />

and along with your abated photos.<br />

NO<br />

NO<br />

2. HEAT ILLNESS PREVENTION 100%<br />

A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />

Photo 8<br />

B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />

canopy)<br />

N/A<br />

Private & Confidential 4/24


Photo 9 Photo 10<br />

C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />

drinking water available per worker with disposable cups, and trash can?<br />

(attach photo) Title 8, 1524, 3363 or 3457<br />

SAFE<br />

Photo 11 Photo 12<br />

D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />

for workers with sign in sheet?<br />

N/A<br />

3. FIRE PREVENTION & PROTECTION 100%<br />

A. Approved gas containers<br />

SAFE<br />

Photo 13<br />

B. Fire extinguishers available and inspected SAFE<br />

The fire protection on site is adequate. I inspected the extinguishers for the following:<br />

1.) good condition without damage<br />

2.) Valid inspection dates including yearly and monthly inspections<br />

3.) pressure gauge reads “charged”<br />

4.) safety pin is secured and in place<br />

Photo 14 Photo 15 Photo 16 Photo 17<br />

3a Protection from Wildfire Smoke<br />

Private & Confidential 5/24


A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />

B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />

considered unhealthy)<br />

N/A<br />

C. Was Wildfire Smoke Training provided for workers? N/A<br />

4. PERSONAL PROTECTIVE EQUIPMENT 100%<br />

A. Approved hard hats SAFE<br />

Photo 18<br />

B. Safety glasses SAFE<br />

Photo 19<br />

D. Are respirators required for any work being performed on site? If so,<br />

were they provided by the employer in conjunction with the required<br />

controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />

Are respirators voluntarily being used? If so, are worker trained on<br />

hazards associated with the environment?<br />

N/A<br />

N/A<br />

E. Proper foot wear SAFE<br />

Photo 20<br />

F. Proper clothing/hand protection/reflective vests SAFE<br />

Photo 21<br />

Private & Confidential 6/24


• Do you have hoists, cranes, derricks & rigging on your site?<br />

• Do you have heavy equipment in your site?<br />

NO<br />

NO<br />

7. ELECTRICAL TOOLS 100%<br />

A. Terminal boxes covered SAFE<br />

B. Ground prong in place SAFE<br />

Photo 22 Photo 23<br />

C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />

removed<br />

N/A<br />

D. Temp / permanent lighting adequate and protected SAFE<br />

E. GFCI’s in place SAFE<br />

Photo 24<br />

F. Mechanical guards in place N/A<br />

G. Proper tools for each job SAFE<br />

H. Powder actuated tools operated by qualified persons N/A<br />

I. Tools inspected. Defected tools removed from service SAFE<br />

Photo 25<br />

8. FALL PROTECTION 1 failed, 66.67%<br />

A. Fall protection policy in effect (6’) SAFE<br />

Private & Confidential 7/24


Photo 26 Photo 27<br />

B. PFAS worn correctly N/A<br />

C. Inspection and maintenance of PFAS conducted DEFICIENT<br />

Fall Protection Equipment Hazard: The fall protection harnesses were not up to date on their inspections.<br />

On one harness, the last inspection was conducted in January <strong>2020</strong>. The second harness has not yet been signed.<br />

Per the manufacturers instructions, the harness is to be inspected and signed by a competent person every 6<br />

months.<br />

Corrective action: I showed Foreman Edgar Bazan the inspection tags and advised that they one harness would be<br />

due for a formal inspection and the other had not been signed. He stated the harnesses were not in use today as the<br />

crew was only unloading today and the roof hatch access had been closed by a Target Representative. However, he<br />

will sign them tomorrow and send pictures for a follow-up.<br />

Photo 28 Photo 29<br />

D. Employees trained in fall protection and fall hazard recognition SAFE<br />

9. BARRICADES / GUARD RAILS / STAIRS 100%<br />

A. Floor / wall openings covered & labeled N/A<br />

B. Roadways, walkways and stairs free of obstacles SAFE<br />

Photo 30 Photo 31<br />

C. Adequate lighting SAFE<br />

Private & Confidential 8/24


Photo 32<br />

D. Trenches and excavations N/A<br />

• Do you have ladders in your site?<br />

YES<br />

10. LADDERS 1 failed, 50%<br />

A. Secured to prevent slipping, sliding or falling SAFE<br />

Photo 33<br />

B. Side rails extend 36” above top of landing, tied off and secured. DEFICIENT<br />

Fall hazard: The side rails did not extend 36” above the top of the landing on an extension ladder.<br />

Corrective Action: I advised Foreman Edgar of the ladder hazard and explained to him that the ladder needed to<br />

extend 36” Above the landing to be in compliance. Foreman Edgar lowered and removed the ladder and stated he<br />

needed a ladder extension and would request one from management.<br />

Photo 34<br />

C. Step ladders fully open when in use. N/A<br />

• Is their scaffolding on site?<br />

• Is welding or cutting being performed on site?<br />

• Are their any excavations or shoring on site?<br />

• Is their any concrete work being performed on site?<br />

• Is any steel erection work being performed on site?<br />

• Is their any mobile equipment on site?<br />

• Do you have any confined space work being performed on site?<br />

NO<br />

NO<br />

NO<br />

NO<br />

NO<br />

NO<br />

NO<br />

Private & Confidential 9/24


CONTRACTORS (List our client first) 100%<br />

Please click "Add Contractor" button.<br />

Contractor 100%<br />

Contractor 1 100%<br />

Name of Contractor/Company<br />

Corona Virus (COVID-19) Procedures In Place<br />

<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />

Yes<br />

Photo 35 Photo 36 Photo 37 Photo 38<br />

JHA Verified<br />

Yes<br />

Photo 39<br />

Toolbox<br />

Yes<br />

Photo 40 Photo 41<br />

Head Count 12<br />

DAILY SAFETY NARRATIVE (DSN)<br />

Private & Confidential 10/24


Please put your Daily Safety Narrative here<br />

I arrived on site at Target Eagle Rock while the crew was taking their lunch break. I accessed the roof by roof hatch<br />

and began my evaluation.<br />

We have a 12-man crew and they are loading onto the site.<br />

Upon their arrival back from lunch, the crew was preparing to depart the site. They gathered all equipment and<br />

ensured the job boxes were locked and secured.<br />

During my evaluation, I observed the following safety concerns:<br />

1.) Fall Protection Equipment Hazard: The fall protection harnesses were not up to date on their inspections.<br />

On one harness, the last inspection was conducted in January <strong>2020</strong>. The second harness has not yet been signed.<br />

Per the manufacturers instructions, the harness is to be inspected and signed by a competent person every 6<br />

months.<br />

Corrective action: I showed Foreman Edgar Bazan the inspection tags and advised that they one harness would be<br />

due for a formal inspection and the other had not been signed. He stated the harnesses were not in use today as the<br />

crew was only unloading today and the roof hatch access had been closed by a Target Representative. However, he<br />

will sign them tomorrow and send pictures for a follow-up.<br />

2.) Fall hazard: The side rails did not extend 36” above the top of the landing on an extension ladder.<br />

Corrective Action: I advised Foreman Edgar of the ladder hazard and explained to him that the ladder needed to<br />

extend 36” Above the landing to be in compliance. Foreman Edgar lowered and removed the ladder and stated he<br />

needed a ladder extension and would request one from management.<br />

The COVID19 procedures were in place with hand sanitizer available as soon as we got back into the target<br />

stockroom and also inside the portable restroom. The restroom was clean and stocked. The last maintenance was<br />

conducted on 6/23. All crew members were wearing masks and gloves.<br />

I also gave Foreman Edgar 5 red-tags to begin implementing a Tagging System for deficient equipment.<br />

No injuries were reported during my evaluation.<br />

This concludes my report.<br />

COMPLETION AND SIGN-OFF<br />

Auditor<br />

Name and Signature<br />

Mayra Martinez<br />

30th Jun, <strong>2020</strong> 2:15 PM PDT<br />

Private & Confidential 11/24


Safety Evaluation <strong>Report</strong> (SER)<br />

<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong>/ La Mesa / 3 Jun <strong>2020</strong> /<br />

Sean Carr<br />

Complete<br />

Score 88.1% Failed items 5 Actions<br />

0<br />

Client / Site<br />

<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong>/ La Mesa<br />

Date of Audit 3rd Jun, <strong>2020</strong><br />

Prepared by<br />

Location<br />

Sean Carr<br />

5500 Grossmont Center Dr<br />

La Mesa CA 91942<br />

United States<br />

(32.779607456208, -<br />

117.0114798379289)<br />

Private & Confidential 1/29


Failed Items<br />

5 failed<br />

A. Approved hard hats DEFICIENT<br />

Hazard: Worker without hard hat on while onsite.<br />

Corrective Action: Worker put hard on when notified.<br />

Photo 17 Photo 18 Photo 19 Photo 20 Photo 21<br />

B. Safety glasses DEFICIENT<br />

Hazard: Worker wearing Oakley sunglasses.<br />

Corrective Action: Foreman supplied worker with proper Z87 safety glasses.<br />

Photo 22 Photo 23<br />

A. Fall protection policy in effect (6’) DEFICIENT<br />

Parapet above 42 inches around working area preventing fall hazard for workers.<br />

Hazard: Worker witnessed working above 6ft without any fall protection or guardrail system in place.<br />

Corrective Action: Forman notified immediately worker was provided with Fall protection Harness to prevent fall<br />

hazard.<br />

Photo 34 Photo 35 Photo 36 Photo 37 Photo 38<br />

Corona Virus (COVID-19) Procedures In Place<br />

No<br />

Workers did not have any Covid-19 sign in sheet onsite.<br />

Private & Confidential 2/29


Photo 47 Photo 48 Photo 49<br />

JHA Verified<br />

No<br />

Workers did not have JHA documentation on site.<br />

Private & Confidential 3/29


Audit 5 failed, 88.1%<br />

CONTRACTOR AND PROJECT INFORMATION<br />

Contractor<br />

Safety Manager<br />

Project Name<br />

Project Number<br />

Project Manager<br />

Superintendent<br />

Inspector of Record (IOR)<br />

Today's Weather Conditions (include 5 day forecast)<br />

<strong>Emmons</strong> <strong>Roofing</strong><br />

Sean Carr<br />

Target San Diego<br />

Target<br />

Miguel Bazan<br />

Edgar Bazan<br />

N/A<br />

Clear<br />

Photo 1<br />

1. PROGRAM ADMINISTRATION 100%<br />

A. Attach photo of Safety Program YES<br />

Photo 2<br />

B. Attach photo of Weekly Safety Meeting YES<br />

Photo 3 Photo 4<br />

C. Were any Safety Orientations performed today NO<br />

D. Safety Violation Notifications issued? NO<br />

Private & Confidential 4/29


E. Are emergency procedures established? Contact list, First Aid Kit in<br />

waterproof container. §1512. Emergency Medical <strong>Service</strong>s.<br />

YES<br />

Photo 5 Photo 6<br />

F. Attach photos to identify contractor's on site first aid and CPR certified<br />

workers.<br />

YES<br />

Photo 7<br />

G. Attach photos of OSHA required posters. YES<br />

Edgar provided a few posters that he had but does not have complete packet of OSHA required posters on site.<br />

Photo 8 Photo 9<br />

H. Did Owner's Safety Representative perform a job walk today? if so, list<br />

all safety concerns along with photos accompanied by your abated photos.<br />

I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />

and along with your abated photos.<br />

NO<br />

NO<br />

2. HEAT ILLNESS PREVENTION 100%<br />

A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />

Photo 10<br />

B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />

canopy)<br />

SAFE<br />

Private & Confidential 5/29


Photo 11<br />

C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />

drinking water available per worker with disposable cups, and trash can?<br />

(attach photo) Title 8, 1524, 3363 or 3457<br />

SAFE<br />

Photo 12<br />

D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />

for workers with sign in sheet?<br />

N/A<br />

3. FIRE PREVENTION & PROTECTION 100%<br />

A. Approved gas containers<br />

SAFE<br />

Photo 13<br />

B. Fire extinguishers available and inspected SAFE<br />

The fire extinguisher was inspected for the following:<br />

1.) Valid monthly and yearly dates<br />

2.) The safety pin is in place<br />

3.) Pressure gauge reads 'charged'<br />

4.) Good condition without damage<br />

Photo 14 Photo 15 Photo 16<br />

3a Protection from Wildfire Smoke<br />

Private & Confidential 6/29


A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />

B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />

considered unhealthy)<br />

N/A<br />

C. Was Wildfire Smoke Training provided for workers? N/A<br />

4. PERSONAL PROTECTIVE EQUIPMENT 2 failed, 60%<br />

A. Approved hard hats DEFICIENT<br />

Hazard: Worker without hard hat on while onsite.<br />

Corrective Action: Worker put hard on when notified.<br />

Photo 17 Photo 18 Photo 19 Photo 20 Photo 21<br />

B. Safety glasses DEFICIENT<br />

Hazard: Worker wearing Oakley sunglasses.<br />

Corrective Action: Foreman supplied worker with proper Z87 safety glasses.<br />

Photo 22 Photo 23<br />

D. Are respirators required for any work being performed on site? If so,<br />

were they provided by the employer in conjunction with the required<br />

controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />

Are respirators voluntarily being used? If so, are worker trained on<br />

hazards associated with the environment?<br />

N/A<br />

SAFE<br />

Photo 24<br />

E. Proper foot wear SAFE<br />

Private & Confidential 7/29


Photo 25<br />

F. Proper clothing/hand protection/reflective vests SAFE<br />

Photo 26<br />

• Do you have hoists, cranes, derricks & rigging on your site?<br />

• Do you have heavy equipment in your site?<br />

NO<br />

NO<br />

7. ELECTRICAL TOOLS 100%<br />

A. Terminal boxes covered N/A<br />

B. Ground prong in place SAFE<br />

Photo 27 Photo 28 Photo 29<br />

C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />

removed<br />

N/A<br />

D. Temp / permanent lighting adequate and protected N/A<br />

E. GFCI’s in place SAFE<br />

Photo 30<br />

F. Mechanical guards in place N/A<br />

G. Proper tools for each job SAFE<br />

Private & Confidential 8/29


Photo 31 Photo 32 Photo 33<br />

H. Powder actuated tools operated by qualified persons N/A<br />

I. Tools inspected. Defected tools removed from service N/A<br />

8. FALL PROTECTION 1 failed, 0%<br />

A. Fall protection policy in effect (6’) DEFICIENT<br />

Parapet above 42 inches around working area preventing fall hazard for workers.<br />

Hazard: Worker witnessed working above 6ft without any fall protection or guardrail system in place.<br />

Corrective Action: Forman notified immediately worker was provided with Fall protection Harness to prevent fall<br />

hazard.<br />

Photo 34 Photo 35 Photo 36 Photo 37 Photo 38<br />

B. PFAS worn correctly N/A<br />

C. Inspection and maintenance of PFAS conducted N/A<br />

D. Employees trained in fall protection and fall hazard recognition N/A<br />

9. BARRICADES / GUARD RAILS / STAIRS 100%<br />

A. Floor / wall openings covered & labeled SAFE<br />

Photo 39<br />

B. Roadways, walkways and stairs free of obstacles SAFE<br />

Private & Confidential 9/29


Photo 40<br />

C. Adequate lighting SAFE<br />

Photo 41<br />

D. Trenches and excavations N/A<br />

• Do you have ladders in your site?<br />

YES<br />

10. LADDERS 100%<br />

A. Secured to prevent slipping, sliding or falling SAFE<br />

Photo 42<br />

B. Side rails extend 36” above top of landing, tied off and secured. SAFE<br />

Photo 43 Photo 44 Photo 45<br />

C. Step ladders fully open when in use. N/A<br />

• Is their scaffolding on site?<br />

YES<br />

11. SCAFFOLDING 100%<br />

A. Erected and dismantled properly. Scaffold tag procedure followed. N/A<br />

B. Competent person N/A<br />

C. Foot pads and mud sills provided N/A<br />

Private & Confidential 10/29


D. Workers protected from falling objects from above N/A<br />

E. Scaffolds plumb and square with full bracing SAFE<br />

Scaffold wheels locked while in use.<br />

Photo 46<br />

F. Top and mid-rails in place, toe boards and complete deck N/A<br />

G. Ladder access available for use N/A<br />

• Is welding or cutting being performed on site?<br />

• Are their any excavations or shoring on site?<br />

• Is their any concrete work being performed on site?<br />

• Is any steel erection work being performed on site?<br />

• Is their any mobile equipment on site?<br />

• Do you have any confined space work being performed on site?<br />

NO<br />

NO<br />

NO<br />

NO<br />

NO<br />

NO<br />

CONTRACTORS (List our client first) 2 failed, 33.33%<br />

Please click "Add Contractor" button.<br />

Contractor 2 failed, 33.33%<br />

Contractor 1 2 failed, 33.33%<br />

Name of Contractor/Company<br />

<strong>Emmons</strong><br />

Corona Virus (COVID-19) Procedures In Place<br />

No<br />

Workers did not have any Covid-19 sign in sheet onsite.<br />

Photo 47 Photo 48 Photo 49<br />

JHA Verified<br />

No<br />

Workers did not have JHA documentation on site.<br />

Toolbox<br />

Yes<br />

Private & Confidential 11/29


Photo 50 Photo 51<br />

Head Count 5<br />

DAILY SAFETY NARRATIVE (DSN)<br />

Please put your Daily Safety Narrative here<br />

Safety Evaluation <strong>Report</strong> at Target San Diego at the Grossmont Shipping Center.<br />

Met with Foreman Edgar Bazan. The crew is finishing final touch ups of membrane installation and removing trash<br />

and debris.<br />

During the evaluation, I noted the following safety concerns:<br />

1.)Foreman Edgar Bazan did not have The completed mobile OSHA posters inside the Foreman's binder. Edgar did<br />

not have copies of Covid-19 awareness or JHA forms.<br />

Note: All proper documentation should be located on the job site at all times.<br />

2.) Hazard: Worker wearing Oakley sunglasses.<br />

Corrective Action: Foreman supplied worker with proper Z87 safety glasses.<br />

3.) Hazard: Worker without hard hat on while onsite.<br />

Corrective Action: Worker put hard on when notified.<br />

4.) Hazard: Worker witnessed working above 6ft without any fall protection or guardrail system in place.<br />

Corrective Action: Forman notified immediately worker was provided with Fall protection Harness to prevent fall<br />

hazard.<br />

No injures were reported during my evaluation. This concludes my report.<br />

COMPLETION AND SIGN-OFF<br />

Private & Confidential 12/29


Auditor<br />

Name and Signature<br />

Sean Carr<br />

3rd Jun, <strong>2020</strong> 10:29 AM PDT<br />

Private & Confidential 13/29


Safety Evaluation <strong>Report</strong> (SER)<br />

<strong>Emmons</strong> <strong>Roofing</strong> /San Diego Costco / 9 Jun <strong>2020</strong> /<br />

Sean Carr<br />

Complete<br />

Score 97.37% Failed items 1 Actions<br />

0<br />

Client / Site<br />

<strong>Emmons</strong> <strong>Roofing</strong> /San Diego Costco<br />

Date of Audit 9th Jun, <strong>2020</strong><br />

Prepared by<br />

Location<br />

Sean Carr<br />

4601–4617 Morena Blvd<br />

San Diego CA 92117<br />

United States<br />

(32.82115001234489, -<br />

117.22460498112926)<br />

Private & Confidential 1/26


Failed Items<br />

1 failed<br />

A. Fall protection policy in effect (6’) DEFICIENT<br />

Hazard: Worker was not wearing any Fall protection while on roof. Parapet around roof is about 20 inches high.<br />

Corrective Action: Informed Martin that Workers should have a 6ft warning line around the roof and or workers need<br />

to be tied off %100 while on the roof.<br />

Foreman has all the equipment on roof but was not using it. Lanyards, Roof anchors and safety harness. Martin<br />

ensures me that workers will be tied off %100 while on roof throughout the day.<br />

Per Title 8 1730 (1) Employees shall be protected from falls from roofs of a height of more than 20 feet by use of<br />

one or a combination of the methods in this section.<br />

Hazard: Access and Egress fall hazard, workers climbing on side of scissor lift to access work area.<br />

Corrective Action: Informed Foreman to turn the lift adjacent to ensure workers can access roof without climbing on<br />

side of lift. At no time should a worker stand or climb on side of a scissor lift creating a fall hazard.<br />

Recommended that workers need to use a extension ladder with extended guard rail handles to ensure proper and<br />

safe access and egress moving forward.<br />

Photo 25 Photo 26 Photo 27 Photo 28 Photo 29 Photo 30<br />

Private & Confidential 2/26


Audit 1 failed, 97.37%<br />

CONTRACTOR AND PROJECT INFORMATION<br />

Contractor<br />

Safety Manager<br />

Project Name<br />

Project Number<br />

Project Manager<br />

Superintendent<br />

Inspector of Record (IOR)<br />

Today's Weather Conditions (include 5 day forecast)<br />

<strong>Emmons</strong> <strong>Roofing</strong><br />

Sean Carr<br />

Costco San Diego<br />

Costco<br />

Miguel Bazan<br />

Martin Bazan<br />

N/A<br />

Clear<br />

Photo 1<br />

1. PROGRAM ADMINISTRATION 100%<br />

A. Attach photo of Safety Program YES<br />

Photo 2<br />

B. Attach photo of Weekly Safety Meeting YES<br />

Photo 3<br />

C. Were any Safety Orientations performed today NO<br />

D. Safety Violation Notifications issued? NO<br />

Private & Confidential 3/26


E. Are emergency procedures established? Contact list, First Aid Kit in<br />

waterproof container. §1512. Emergency Medical <strong>Service</strong>s.<br />

YES<br />

Photo 4 Photo 5 Photo 6<br />

F. Attach photos to identify contractor's on site first aid and CPR certified<br />

workers.<br />

YES<br />

Photo 7<br />

G. Attach photos of OSHA required posters. YES<br />

Photo 8 Photo 9<br />

H. Did Owner's Safety Representative perform a job walk today? if so, list<br />

all safety concerns along with photos accompanied by your abated photos.<br />

I. Did the Inspector (IOR) have any safety concerns today? If so, list them<br />

and along with your abated photos.<br />

NO<br />

NO<br />

2. HEAT ILLNESS PREVENTION 100%<br />

A. Attach photo of Heat Illness Plan (English & Spanish) SAFE<br />

Photo 10<br />

B. Is ample shade provided for workers? (80 degrees = 6 workers per<br />

canopy)<br />

SAFE<br />

Private & Confidential 4/26


Photo 11<br />

C. Are drinking fountains or at least 2 Gallons of fresh cool labeled<br />

drinking water available per worker with disposable cups, and trash can?<br />

(attach photo) Title 8, 1524, 3363 or 3457<br />

SAFE<br />

Photo 12<br />

D. Attach the documented Pre-Shift 95 degree High Heat Training provided<br />

for workers with sign in sheet?<br />

N/A<br />

3. FIRE PREVENTION & PROTECTION 100%<br />

A. Approved gas containers<br />

SAFE<br />

Photo 13<br />

B. Fire extinguishers available and inspected SAFE<br />

Photo 14 Photo 15<br />

3a Protection from Wildfire Smoke<br />

A. Is a written Wildfire smoke plan on site per 5141.1? (attach photo) N/A<br />

B. What is the current Air Quality Index (AQI) for PM2.5. (above 151 is<br />

considered unhealthy)<br />

N/A<br />

C. Was Wildfire Smoke Training provided for workers? N/A<br />

Private & Confidential 5/26


4. PERSONAL PROTECTIVE EQUIPMENT 100%<br />

A. Approved hard hats SAFE<br />

Photo 16<br />

B. Safety glasses SAFE<br />

Photo 17<br />

D. Are respirators required for any work being performed on site? If so,<br />

were they provided by the employer in conjunction with the required<br />

controls listed on the Table 1 in Cal/OSHA Title 8 5144?<br />

Are respirators voluntarily being used? If so, are worker trained on<br />

hazards associated with the environment?<br />

N/A<br />

SAFE<br />

Photo 18<br />

E. Proper foot wear SAFE<br />

Photo 19 Photo 20<br />

F. Proper clothing/hand protection/reflective vests SAFE<br />

Photo 21<br />

Private & Confidential 6/26


• Do you have hoists, cranes, derricks & rigging on your site?<br />

• Do you have heavy equipment in your site?<br />

NO<br />

NO<br />

7. ELECTRICAL TOOLS 100%<br />

A. Terminal boxes covered N/A<br />

B. Ground prong in place N/A<br />

C. 12-gauge cords placed along wall line or elevated 7 feet. Damage cords<br />

removed<br />

N/A<br />

D. Temp / permanent lighting adequate and protected N/A<br />

E. GFCI’s in place SAFE<br />

Photo 22<br />

F. Mechanical guards in place SAFE<br />

Photo 23<br />

G. Proper tools for each job SAFE<br />

Photo 24<br />

H. Powder actuated tools operated by qualified persons N/A<br />

I. Tools inspected. Defected tools removed from service N/A<br />

8. FALL PROTECTION 1 failed, 50%<br />

A. Fall protection policy in effect (6’) DEFICIENT<br />

Private & Confidential 7/26


Hazard: Worker was not wearing any Fall protection while on roof. Parapet around roof is about 20 inches high.<br />

Corrective Action: Informed Martin that Workers should have a 6ft warning line around the roof and or workers need<br />

to be tied off %100 while on the roof.<br />

Foreman has all the equipment on roof but was not using it. Lanyards, Roof anchors and safety harness. Martin<br />

ensures me that workers will be tied off %100 while on roof throughout the day.<br />

Per Title 8 1730 (1) Employees shall be protected from falls from roofs of a height of more than 20 feet by use of<br />

one or a combination of the methods in this section.<br />

Hazard: Access and Egress fall hazard, workers climbing on side of scissor lift to access work area.<br />

Corrective Action: Informed Foreman to turn the lift adjacent to ensure workers can access roof without climbing on<br />

side of lift. At no time should a worker stand or climb on side of a scissor lift creating a fall hazard.<br />

Recommended that workers need to use a extension ladder with extended guard rail handles to ensure proper and<br />

safe access and egress moving forward.<br />

Photo 25 Photo 26 Photo 27 Photo 28 Photo 29 Photo 30<br />

B. PFAS worn correctly SAFE<br />

Photo 31 Photo 32 Photo 33<br />

C. Inspection and maintenance of PFAS conducted N/A<br />

D. Employees trained in fall protection and fall hazard recognition N/A<br />

9. BARRICADES / GUARD RAILS / STAIRS 100%<br />

A. Floor / wall openings covered & labeled N/A<br />

B. Roadways, walkways and stairs free of obstacles N/A<br />

C. Adequate lighting SAFE<br />

Private & Confidential 8/26


Photo 34<br />

D. Trenches and excavations N/A<br />

• Do you have ladders in your site?<br />

• Is their scaffolding on site?<br />

• Is welding or cutting being performed on site?<br />

• Are their any excavations or shoring on site?<br />

• Is their any concrete work being performed on site?<br />

• Is any steel erection work being performed on site?<br />

• Is their any mobile equipment on site?<br />

NO<br />

NO<br />

NO<br />

NO<br />

NO<br />

NO<br />

YES<br />

16. MOBILE EQUIPMENT<br />

A. Are imposed loads exerted on the life basket. N/A<br />

B. Are lifts operated within load capacities N/A<br />

C. Are lift occupants tied off to the designated anchorage points. N/A<br />

• Do you have any confined space work being performed on site?<br />

NO<br />

CONTRACTORS (List our client first) 100%<br />

Please click "Add Contractor" button.<br />

Contractor 100%<br />

Contractor 1 100%<br />

Name of Contractor/Company<br />

Corona Virus (COVID-19) Procedures In Place<br />

Yes<br />

<strong>Emmons</strong> <strong>Roofing</strong><br />

Photo 35 Photo 36 Photo 37 Photo 38<br />

Private & Confidential 9/26


JHA Verified<br />

Yes<br />

Photo 39<br />

Toolbox<br />

Yes<br />

Photo 40<br />

Head Count 3<br />

DAILY SAFETY NARRATIVE (DSN)<br />

Please put your Daily Safety Narrative here<br />

Private & Confidential 10/26


Sean Carr conducted a Safety Evaluation <strong>Report</strong> at Costco San Diego.<br />

I met with Foreman Martin Bazan. The crew is installing roof membrane.<br />

Weather will reach 80° today workers were reminded to get plenty of rest water and shade if need be throughout the<br />

day. Also conduct a buddy system to help prevent any heat stroke or heat exhaustion.<br />

During the evaluation, I noted the following safety concerns:<br />

1)Foreman Martin Bazan did not have a Pre-Task planner nor was it completed prior to the start of work.<br />

Note: I supplied a Pre-Task for Martin and documents completed immediately once notified.<br />

2)Hazard: Worker was not wearing any Fall protection while on roof. Parapet around roof is about 20 inches high.<br />

Corrective Action: Informed Martin that Workers should have a 6ft warning line around the roof and or workers need<br />

to be tied off %100 while on the roof.<br />

Foreman has all the equipment on roof but was not using it. Lanyards, Roof anchors and safety harness. Martin<br />

ensures me that workers will be tied off %100 while on roof throughout the day.<br />

Per Title 8 1730 (1) Employees shall be protected from falls from roofs of a height of more than 20 feet by use of<br />

one or a combination of the methods in this section.<br />

3)Hazard: Access and Egress tip over and fall hazard, workers climbing on side of scissor lift to access work area.<br />

Corrective Action: Informed Foreman to turn the lift adjacent to ensure workers can access roof without climbing on<br />

side of lift. At no time should a worker stand or climb on side of a scissor lift creating a fall and tip over hazard.<br />

Workers will wear harness and tie off prior to exiting lift to ensure %100 secure Fall protection.<br />

Recommended that workers need to use a extension ladder with extended guard rail handles to ensure proper and<br />

safe access and egress moving forward.<br />

No injures were reported during my evaluation. This concludes my report.<br />

COMPLETION AND SIGN-OFF<br />

Auditor<br />

Name and Signature<br />

Sean Carr<br />

9th Jun, <strong>2020</strong> 11:10 AM PDT<br />

Private & Confidential 11/26


EMPLOYEE<br />

CORRECTIVE<br />

MEASURES


Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />

1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com<br />

Corrective Measures Summary<br />

<strong>June</strong> <strong>2020</strong><br />

EMPLOYEE CORRECTIVE MEASURES<br />

Infractions will receive an Employee Corrective Measures form. When an infraction is committed, a verbal warning will be<br />

issued, and the form will serve as a record. The 5 Keys implemented to assist and help with understanding are the<br />

following: 1.) Establish 2.) Enforce 3.) Monitor 4.) Train 5.) Assist.<br />

DATE & JOBSITE EMPLOYEE/WORKER VIOLATION<br />

6/3/<strong>2020</strong><br />

La Mesa<br />

6/9/<strong>2020</strong><br />

San Diego<br />

Edgar Bazan<br />

Martin Bazan<br />

Foreman Edgar Bazan had multiple hazards<br />

on site, including an IDLH deficiency:<br />

• Personal Protective Equipment<br />

• Fall Hazards without Harness<br />

• Job Hazard Analysis<br />

Foreman Martin Bazan was witnessed not<br />

having a harness by a parapet wall of 20”,<br />

also a scissor lift was utilized as a means of<br />

access by climbing over its rails.


Employee Corrective Measures (ECM) <strong>Report</strong><br />

The ECM <strong>Report</strong> must be filled out by Management upon the notification of the infraction. Once it is completed please Email a copy<br />

to The Price of Safety to the following individuals: Safety Dept: info@thepriceofsafety.co; as well as a copy to the client contact<br />

WITHIN 24 HOURS.<br />

For assistance call (424) 744-1002<br />

Name of Worker/Employee<br />

Edgar Bazan<br />

Trade: Commercial Roofer<br />

Job Title:<br />

Foreman<br />

Employer/Contractor:<br />

Emmon’s <strong>Roofing</strong> <strong>Service</strong><br />

Date and Time of Incident:<br />

11:00 AM 6/3/<strong>2020</strong><br />

Location of Incident (Address):<br />

Grossmont Center, La Mesa<br />

Name of Supervisor:<br />

Miguel Bazan<br />

Supervisor's Number:<br />

Date Supervisor<br />

Notified: 6/3/<strong>2020</strong><br />

Form Completed By:<br />

Mayra Martinez<br />

Number<br />

(951)441-9230<br />

Date THE PRICE OF SAFETY notified:<br />

6/3/<strong>2020</strong><br />

Project Name and #:<br />

Was this incident in violation of a ❑ YES ❑ NO<br />

Target La Mesa<br />

company policy?<br />

Were there any witnesses? Name of Witness: Name of Witness:<br />

Yes<br />

Martin Bazan<br />

Type of Violation:<br />

No PPE<br />

Improper use of fall arrest (PFAS)<br />

Improper use of equipment<br />

Lack of Documentation<br />

Missing Required Certification<br />

Improper use of a vehicle/heavy equipment<br />

<br />

<br />

<br />

<br />

<br />

Improper guards<br />

Improper PPE<br />

Unsafe Act/Condition<br />

Failure to Secure/Warn<br />

Other:<br />

Fall Hazard<br />

Potential for<br />

Reoccurrence:<br />

Never<br />

Rare<br />

Occasional Frequent<br />

Has Employee been trained<br />

in the area violated?<br />

❑ YES ❑ NO<br />

❑ WARNED ❑ SUSPEND ❑ REMOVED FROM JOB SITE ❑ DISCHARGED<br />

Date of Previous Warning: Days Suspended: Date Removed:<br />

Dates of Suspension<br />

Full description of incident: (Please describe the occurrence- remember, this section is for facts, not<br />

opinions)<br />

Mr. Bazan had multiple deficiencies on his site. The hazards included an IDLH deficiency:<br />

• Fall Hazard without harness<br />

• No PPE (Safety Glasses)<br />

• No Job Hazard Analysis<br />

Worker's Statement:<br />

Mr. Bazan stated "I'll make sure going forward we are doing things correctly,just let me know what I need to fix."<br />

guar<br />

What Corrective Measures were taken/or suggested:<br />

• A harness was worn on the scaffold<br />

• Safety Glasses were given to employee<br />

• A job Hazard Analysis was completed<br />

What the situation defused or mitigated?<br />

Yes, all deficiencies were mitigated.<br />

Why or Why Not?<br />

Signature:<br />

Date:<br />

6//<strong>2020</strong>


Employee Corrective Measures (ECM) <strong>Report</strong><br />

The ECM <strong>Report</strong> must be filled out by Management upon the notification of the infraction. Once it is completed please Email a copy<br />

to The Price of Safety to the following individuals: Safety Dept: info@thepriceofsafety.co; as well as a copy to the client contact<br />

WITHIN 24 HOURS.<br />

For assistance call (424) 744-1002<br />

Name of Worker/Employee<br />

Martin Bazan<br />

Job Title:<br />

Roofer<br />

Employer/Contractor:<br />

<strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />

Trade:<br />

Commercial <strong>Roofing</strong><br />

Date and Time of Incident:<br />

Location of Incident (Address):<br />

6/9/<strong>2020</strong><br />

Grossmont Center, La Mesa 4617 Morena BLVD, San Diego<br />

Name of Supervisor:<br />

Miguel Bazan<br />

Supervisor's Number:<br />

(909)721-2438<br />

Date Supervisor Notified:<br />

6/9/<strong>2020</strong><br />

Form Completed By:<br />

Mayra Martinez<br />

Number<br />

(951)441-9230<br />

Date THE PRICE OF SAFETY notified:<br />

6/9/<strong>2020</strong><br />

Project Name and #:<br />

Was this incident in violation of a ❑ YES ❑ NO<br />

La Mesa<br />

company policy?<br />

Were there any witnesses? Name of Witness: Name of Witness:<br />

Type of Violation:<br />

No PPE<br />

Improper use of fall arrest (PFAS)<br />

Improper use of equipment<br />

Lack of Documentation<br />

Missing Required Certification<br />

Improper use of a vehicle/heavy equipment<br />

<br />

<br />

<br />

<br />

<br />

Improper guards<br />

Improper PPE<br />

Unsafe Act/Condition<br />

Failure to Secure/Warn<br />

Other:<br />

Potential for<br />

Reoccurrence:<br />

Never<br />

Rare<br />

Occasional Frequent<br />

Has Employee been trained<br />

in the area violated?<br />

❑ YES ❑ NO<br />

❑ WARNED ❑ SUSPEND ❑ REMOVED FROM JOB SITE ❑ DISCHARGED<br />

Date of Previous Warning: Days Suspended: Date Removed:<br />

Dates of Suspension<br />

Full description of incident: (Please describe the occurrence- remember, this section is for facts, not<br />

opinions)<br />

Edgar Bazan was climbing on the rails of a scissor lift to access a roof.<br />

Worker's Statement:<br />

Mr. Bazan stated that he would wear a harness and relocate the scissor lift so it would be adjacent to the roof<br />

What Corrective Measures were taken/or suggested:<br />

Sean Carr advised that the scissor lift rails are not designed to be climbed on and hold additional weight. Mr. Bazan<br />

wore a harness and relocated the scissor lift to be adjacent to the roof to prevent climbing on the rails.<br />

What the situation defused or mitigated? Why or Why Not?<br />

Yes, the fall hazards were mitigated with proper fall protection<br />

Signature: Date: 6/9/<strong>2020</strong>


INCIDENT LOGS


Incident Log <strong>June</strong> <strong>2020</strong><br />

SUMMARY:<br />

There were no injuries or incidents observed or reported during the month of February.<br />

Note:<br />

Please continue to encourage all of our employees to report minor incidents including cuts, scratches, and<br />

bruises. As well as major incidents such as slips, falls, sprains, and broken bones as soon as possible; ensure<br />

that all foreman have incident response packets available on hand at all times.<br />

Minor Incident example: scraped knee, puncture finger with staple gun.<br />

Major Incidents include: Fall from ladder, eye puncture, circular saw cut, property damage.<br />

OPEN INCIDENTS<br />

NAME OF EMPLOYEE DATE/TIME DESCRIPTION SEVERITY OF<br />

INJURIES/ILLNESS<br />

NO INCIDENTS REPORTED FOR JUNE <strong>2020</strong><br />

CLOSED INCIDENT<br />

NAME OF EMPLOYEE BRIEF DESCRIPTION SEVERITY OF INJURY/ILLNESS CLOSING<br />

DATE<br />

Prepared by The Price of Safety on behalf of <strong>Emmons</strong> <strong>Roofing</strong> <strong>Service</strong><br />

1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com


TRAINING SUMMARY


Strategic Training Calendar<br />

<strong>2020</strong><br />

January February March<br />

OSHA FOCUS FOUR: CAUGHT<br />

IN/BETWEEN<br />

1.) OSHA Focus Four Caught<br />

in/Caught in-between<br />

2.) Hazards<br />

3.) Prevention<br />

4.) Additional Tips<br />

OSHA FOCUS FOUR:<br />

ELECTROCUTION<br />

5.) OSHA Focus Four Electrocution<br />

6.) Hazards<br />

7.) Prevention<br />

8.) Additional Tips<br />

OSHA FOCUS FOUR: FALLS<br />

9.) OSHA Focus Four Fall<br />

Prevention<br />

10.) Hazards<br />

11.) Prevention<br />

12.) Additional Tips<br />

April May <strong>June</strong><br />

OSHA FOCUS FOUR: STRUCK BY HEAT ILLNESS PREVENTION PERSONAL PROTECTIVE<br />

EQUIPMENT<br />

13.) OSHA Focus Four Struck-By<br />

Hazards<br />

14.) Training and tools<br />

15.) Fire Extinguishers and Labels<br />

16.) Additional Tips<br />

16.) Heat Stress<br />

17.) Preventative Actions<br />

18.) Signs and Symptoms<br />

19.) Additional Tips<br />

20.) Eye Safety<br />

21.) Impact Hazards<br />

22.) Heat Injuries<br />

23.) Chemical Injuries<br />

24.) Important Tips<br />

July August September<br />

FIRE SAFETY HEAVY EQUIPMENT FALL PROTECTION<br />

25.) Fire Prevention<br />

26.) Alertness and Signs<br />

27.) Heat Injuries<br />

28.) Chemical Injuries<br />

October November December<br />

HOUSEKEEPING/SIGNS AND<br />

BARRICADES<br />

SEASONAL FLU/COLD STRESS<br />

OSHA VISITS


Strategic Training Schedule: JUNE <strong>2020</strong><br />

SUMMARY:<br />

Based upon the required yearly training calendar, as well as the failed items for the previous month, this is the<br />

suggested training schedule for the month of May.<br />

Note: please continue to encourage all of our employees to report incidents and near misses as soon as<br />

possible; ensure that all foreman have incident response packets available on hand at all times.<br />

REQUIRED TRAINING CONDUCTED<br />

TITLE COURSE DATE/TIME DESCRIPTION NOTES<br />

Weekly Safety Topics:<br />

Heat Illness Prevention<br />

Foremen to conduct<br />

Weekly Safety<br />

Meetings to be<br />

conducted every<br />

Monday, by 7:30am<br />

1.) PPE: Eye Safety<br />

2.) Impact Hazards<br />

3.) Heat Injuries<br />

4.) Chemical Injures<br />

5.) Additional Tips<br />

Weekly Safety Topics sent<br />

to<br />

miguel@emmonsroof.com<br />

Received 5/29/<strong>2020</strong><br />

Awareness Level<br />

Training:<br />

Heat Illness Prevention<br />

5/19 8:00 AM<br />

La Mesa with<br />

Foreman Edgar<br />

Bazan<br />

5/20 11:00 AM<br />

Long Beach with<br />

Foreman Sergio<br />

Paez<br />

Mayra Martinez<br />

conducted on-site training<br />

and covered the following:<br />

Heat Illness Prevention<br />

measures, signs,<br />

symptoms, accumulation,<br />

and what to do in the<br />

event of heat stress and<br />

heat stroke.<br />

Please see rosters.<br />

AWARENESS LEVEL NEEDED<br />

TRAINING COURSE BRIEF DESCRIPTION DATE/TIME CLOSING<br />

DATE<br />

Fall Protection<br />

Heat Illness ( continued)<br />

Fall protection requirements,<br />

hazard identification, systems,<br />

and donning of fall protection.<br />

Educate employers and<br />

workers on the dangers of<br />

working in the heat.<br />

Note: Foreman Martin<br />

Bazan’s Crew has not had<br />

Heat Illness Training.<br />

TBD <strong>Emmons</strong> Office<br />

August <strong>2020</strong><br />

*Postponed due to recent<br />

COVID19 outbreak and<br />

challenges<br />

TBD On-Site Training July <strong>2020</strong><br />

Prepared by The Price of Safety on behalf of <strong>Emmons</strong> Roof <strong>Service</strong><br />

1485 Spruce St., Suite M, Riverside, CA 92507 | www.thepriceofsafety.com


WEEKLY SAFETY TOPIC<br />

RECORDS/ROSTERS


PERSONAL PROTECTION || Eye Safety<br />

Week 1<br />

According to the Centers for Disease Control and Prevention (CDC),<br />

each day about 2000 U.S. workers have a job-related eye injury that<br />

requires medical treatment. About one third of the injuries are treated in<br />

hospital emergency departments and more than 100 of these injuries result<br />

in one or more days of lost work.<br />

Workers can get particles of<br />

• dust<br />

• metal<br />

• wood<br />

• glass<br />

• concrete<br />

• plastic or other hard substances in their eyes. In addition, chemicals,<br />

acids, sparks, hot oil, fire and steam are also eye hazards.<br />

OSHA Standard 1926.28(a) The employer is<br />

responsible for requiring the wearing of<br />

appropriate personal protective equipment in<br />

all operations where there is an exposure to<br />

hazardous conditions or where this part<br />

indicates the need for using such equipment to<br />

reduce the hazards to the employees.<br />

thepriceofsafety.com<br />

1


PERSONAL PROTECTION || Eye Safety<br />

Week 2<br />

‣ Impact hazards are those that result from flying or falling objects,<br />

or sparks striking the eye. Eye protection for these hazards are safety<br />

spectacles with side shields or goggles.<br />

OSHA Standard 1926.102(a)(1) Employees shall be provided with eye and face<br />

protection equipment when machines or operations present potential eye or face<br />

injury from physical, chemical, or radiation agents.<br />

Impact hazards can be created by grinding or cutting tools such as the bench grinder above.<br />

thepriceofsafety.com<br />

2


PERSONAL PROTECTION || Eye Safety<br />

Week 3<br />

‣ Heat injuries may occur to the eye and face when workers<br />

are exposed to high temperatures, splashes of molten<br />

metal, or hot sparks. Eye protection for these hazards are<br />

safety spectacles with special-purpose lenses and side shields<br />

or goggles.<br />

Worker properly welding with<br />

protective eye/face equipment.<br />

Prevent injuries: wear safety glasses, goggles, or other approved<br />

eye/face protection.<br />

Workers need to protect their eyes from a variety of dangers such as:<br />

• flying dust, dirt, or sand particles<br />

• slivers of metal, wood, or glass<br />

• fragments of concrete or rock<br />

• chemicals, sparks, UV light and lasers<br />

thepriceofsafety.com<br />

3


PERSONAL PROTECTION || Eye Safety<br />

Week 4<br />

‣ Chemical injuries often result from an inappropriate choice of<br />

PPE, that allows a chemical substance to enter from around or<br />

under protective eye equipment. Eye protection for these<br />

hazards are goggles, face shields and eyewash stations.<br />

Worker using proper eye and face protection.<br />

Chemical exposure could occur in everyday tasks such as<br />

pouring concrete.<br />

thepriceofsafety.com<br />

4


PERSONAL PROTECTION || Eye Safety<br />

Week 5<br />

‣ Remember these important tips to avoid eye injuries:<br />

• Always use safety glasses or goggles designed for the task.<br />

• Protect your eyes from debris and particles getting into your eyes<br />

by using goggles.<br />

• Use eye protection designed specifically for welding or cutting<br />

activities.<br />

• In addition to safety glasses or goggles wear a face shield if there<br />

is any potential for chemicals or particles causing injury to your<br />

face.<br />

• Safety glasses must be rated ANSI Z87.1.<br />

• Prescription lenses must also be rated ANSI Z87.1 or safety<br />

glasses will be required over your prescription glasses.<br />

Safety glasses must be rated American National Standards Institute, (ANSI) Z87.1.<br />

thepriceofsafety.com<br />

5


ADDITIONAL SERVICES


Additional <strong>Service</strong>s: <strong>June</strong> <strong>2020</strong><br />

BELOW IS A RECORD OF THE ADDITIONAL SUPPORT PROVIDED FOR YOUR SAFETY SERVICES.<br />

Virtual Evaluation:<br />

Edgar Bazan<br />

TITLE DATE DESCRIPTION NOTES<br />

6/30/<strong>2020</strong> A Safety Evaluation<br />

<strong>Report</strong> was conducted<br />

on Foreman Edgar<br />

Bazan’s Site in Eagle<br />

Rock. Two IDHL<br />

deficiencies were<br />

discovered.<br />

Mayra Martinez<br />

followed-up the<br />

following day to ensure<br />

the deficiencies were<br />

mitigated on site prior<br />

to work resuming on<br />

that project.<br />

Edgar sent a picture of<br />

a ladder extension and<br />

signed fall harness<br />

inspection tags.