ACTIVE AKTIVNA CONSTRUCTION GRADILIŠTA SITES KORIDORA OF CORRIDOR 5C I 5C BRZIH AND MOTORWAYS
CESTA
Vranduk – Ponirak
Total length of the
section:
Value of the
contracted works:
Contractor:
Control over
performing works:
Financing
source:
Objects:
5,3 km
€ 65.4 million
Azvirt L.L.C. i
Hering d.d. Široki Brijeg
DRI
investment management
d.o.o. and DIVEL d.o.o.
Sarajevo
OFID
Two bridges,
three viaducts
and a tunnel
→
→
→
Ponirak – Vraca
Total length of the
section:
Value of the
contracted works:
Contractor:
Control over
performing works:
→
→
→
Financing
source:
Objects:
2,7 km
€ 59.4 million
Euro-Asfalt d.o.o.
Sarajevo
Technital S.p.A. (Italy) i TZI
Inženjering d.o.o. (B&H)
EIB, WBIF
Tunnel
VELIKA
KLADUŠA
AC INFO · 2/20
Donja Gračanica – Klopče
Total length of the
section:
Value of the
contracted works:
Contractor:
Tunnel Zenica - Donja Gračanica
Total length of the
section:
Value of the
contracted works:
Contractor:
Control over
performing works:
→
→
→
20
Financing
source:
Objects:
5,7 km
€ 126.8 million
Control over
performing works:
BIHAĆ Financing
EBRD, OFID
source:
Objects:
JV strabag AG, Euro-Asfalt
d.o.o. Sarajevo
Egis International & IPSA
Institut d.o.o. Sarajevo
Four viaducts,
two tunnels and
bridge
3,9 km
€ 57.5 million
Cengiz insaat Sanyi ve
Ticater A.S.
Egis International & IPSA
Institut d.o.o. Sarajevo
EBRD, WBIF
KLADUŠA
→
→
→
Three viaducts, two tunnels and
Zenica sjever loop with pay toll,
and the so-called roads of
„Northern connection” that they
need to connect highway of
Corridor 5c with the city of Zenica
and the M-17 main road
BIHAĆ
KLJUČ
Ivan Tunnel (LOT 2)
Total length of the
section:
Value of the
contracted works:
Contractor:
Control over
performing works:
Financing
source:
Objects:
2 km
JAJCE
€ 57.6 million
Euro-Asfalt d.o.o. TRAVNIK Sarajevo
Ird Engineering s.r.l. Italy
VITEZ
EBRD, WBIF
Tunnel
KLJUČ
→
→
→
BULLETIN OF JP AUTOCESTE FBIH
DOBOJ SOUTH
ŽEPČE NORTH
KONJIC
JAJCE
ŽEPČE SOUTH
TRAVNIK POPRIKUŠE
VITEZ
DOBOJ SOUTH
ŽEPČE NORTH
JOŠANICA KONJIC
TARČIN
MOSTAR NORTH
MOSTAR SOUTH
MEĐUGORJE
SVILAJ
ODŽAK
JOHOVAC
KARUŠE
OZIMICA
VRANDUK
PONIRAK
LAŠVA
LOT SALAKOVAC
3B (SARAJEVO
BAYPASS)
MEDAKOVO
KLOPČE
POČITELJ
NEMILA
ŽEPČE SOUTH
VRACA (ZENICA TUNNEL)
BILJEŠEVO
IVAN TUNNEL
OVČARI
DONJA GRAČANICA
BUNA
DRIVUŠA
KAKANJ
TARČIN
PRENJ TUNNEL
KVANJ TUNNEL
POPRIKUŠE
SALAKOVAC
BIJAČA
24 19 25
MOSTAR NORTH
JOHOVAC
KARUŠE
OZIMICA
VRANDUK
PONIRAK
MEDAKOVO
KLOPČE
LAŠVA
NEMILA
VRACA (ZENICA TUNNEL)
BILJEŠEVO
IVAN TUNNEL
OVČARI
DONJA GRAČANICA
DRIVUŠA
KAKANJ
BUTILE
PRENJ TUNNEL
VLAKOVO
SARAJEVO
TUZLA
BUTILE
SVILAJ
ODŽAK
ORAŠJE
BRČKO
JOŠANICA
SARAJEVO
VLAKOVO
LOT 3B (SARAJEVO
BAYPASS)
HRANJEN TUNNEL
GORAŽDE
TUZLA
VIŠEGRAD
ORAŠJE
BRČKO
HRANJEN TUNNEL
GORAŽDE
EXPRESSWAYS
UNDER CONSTRUCTION 5,8 km
TENDER IN PROCESS 5,5 km
PLANNED FOR CONSTRUCTION 32,4 km
TOTAL 38,2 km
CORRIDOR 5C
BUILT 104 km
UNDER CONSTRUCTION 38 km
GUARANTEED FINANCING 58,5 km
TENDER IN PREPARATION 45,1 km
TENDER IN PROCESS 22,8 km
PLANNED FOR CONSTRUCTION 12 km
TOTAL280 km