AC INFO · 2/20

ACTIVE AKTIVNA CONSTRUCTION GRADILIŠTA SITES KORIDORA OF CORRIDOR 5C I 5C BRZIH AND MOTORWAYS

CESTA

Vranduk – Ponirak

Total length of the

section:

Value of the

contracted works:

Contractor:

Control over

performing works:

Financing

source:

Objects:

5,3 km

€ 65.4 million

Azvirt L.L.C. i

Hering d.d. Široki Brijeg

DRI

investment management

d.o.o. and DIVEL d.o.o.

Sarajevo

OFID

Two bridges,

three viaducts

and a tunnel

Ponirak – Vraca

Total length of the

section:

Value of the

contracted works:

Contractor:

Control over

performing works:

Financing

source:

Objects:

2,7 km

€ 59.4 million

Euro-Asfalt d.o.o.

Sarajevo

Technital S.p.A. (Italy) i TZI

Inženjering d.o.o. (B&H)

EIB, WBIF

Tunnel

VELIKA

KLADUŠA

AC INFO · 2/20

Donja Gračanica – Klopče

Total length of the

section:

Value of the

contracted works:

Contractor:

Tunnel Zenica - Donja Gračanica

Total length of the

section:

Value of the

contracted works:

Contractor:

Control over

performing works:

20

Financing

source:

Objects:

5,7 km

€ 126.8 million

Control over

performing works:

BIHAĆ Financing

EBRD, OFID

source:

Objects:

JV strabag AG, Euro-Asfalt

d.o.o. Sarajevo

Egis International & IPSA

Institut d.o.o. Sarajevo

Four viaducts,

two tunnels and

bridge

3,9 km

€ 57.5 million

Cengiz insaat Sanyi ve

Ticater A.S.

Egis International & IPSA

Institut d.o.o. Sarajevo

EBRD, WBIF

KLADUŠA

Three viaducts, two tunnels and

Zenica sjever loop with pay toll,

and the so-called roads of

„Northern connection” that they

need to connect highway of

Corridor 5c with the city of Zenica

and the M-17 main road

BIHAĆ

KLJUČ

Ivan Tunnel (LOT 2)

Total length of the

section:

Value of the

contracted works:

Contractor:

Control over

performing works:

Financing

source:

Objects:

2 km

JAJCE

€ 57.6 million

Euro-Asfalt d.o.o. TRAVNIK Sarajevo

Ird Engineering s.r.l. Italy

VITEZ

EBRD, WBIF

Tunnel

KLJUČ

BULLETIN OF JP AUTOCESTE FBIH

DOBOJ SOUTH

ŽEPČE NORTH

KONJIC

JAJCE

ŽEPČE SOUTH

TRAVNIK POPRIKUŠE

VITEZ

DOBOJ SOUTH

ŽEPČE NORTH

JOŠANICA KONJIC

TARČIN

MOSTAR NORTH

MOSTAR SOUTH

MEĐUGORJE

SVILAJ

ODŽAK

JOHOVAC

KARUŠE

OZIMICA

VRANDUK

PONIRAK

LAŠVA

LOT SALAKOVAC

3B (SARAJEVO

BAYPASS)

MEDAKOVO

KLOPČE

POČITELJ

NEMILA

ŽEPČE SOUTH

VRACA (ZENICA TUNNEL)

BILJEŠEVO

IVAN TUNNEL

OVČARI

DONJA GRAČANICA

BUNA

DRIVUŠA

KAKANJ

TARČIN

PRENJ TUNNEL

KVANJ TUNNEL

POPRIKUŠE

SALAKOVAC

BIJAČA

24 19 25

MOSTAR NORTH

JOHOVAC

KARUŠE

OZIMICA

VRANDUK

PONIRAK

MEDAKOVO

KLOPČE

LAŠVA

NEMILA

VRACA (ZENICA TUNNEL)

BILJEŠEVO

IVAN TUNNEL

OVČARI

DONJA GRAČANICA

DRIVUŠA

KAKANJ

BUTILE

PRENJ TUNNEL

VLAKOVO

SARAJEVO

TUZLA

BUTILE

SVILAJ

ODŽAK

ORAŠJE

BRČKO

JOŠANICA

SARAJEVO

VLAKOVO

LOT 3B (SARAJEVO

BAYPASS)

HRANJEN TUNNEL

GORAŽDE

TUZLA

VIŠEGRAD

ORAŠJE

BRČKO

HRANJEN TUNNEL

GORAŽDE

EXPRESSWAYS

UNDER CONSTRUCTION 5,8 km

TENDER IN PROCESS 5,5 km

PLANNED FOR CONSTRUCTION 32,4 km

TOTAL 38,2 km

CORRIDOR 5C

BUILT 104 km

UNDER CONSTRUCTION 38 km

GUARANTEED FINANCING 58,5 km

TENDER IN PREPARATION 45,1 km

TENDER IN PROCESS 22,8 km

PLANNED FOR CONSTRUCTION 12 km

TOTAL280 km