6SCL’s<br />

steps<br />

to take before starting<br />

a new project<br />

SCL Groundworks share advice for getting a clear idea<br />

of what it will take to get you your dream new-build<br />

or extension, before you start out sclgroundworks.co.uk<br />

To prepare land for a new-build or extension, the<br />

preferred starting point is often to get in touch with<br />

an architect to create the design of the project.<br />

Once the architect has created an initial scope of<br />

specification for what you wish to achieve, you will<br />

be able to go to a structural engineer to organise the<br />

groundworks. Finding the right engineer is just as<br />

important a step as finding a good architect, as the groundworks<br />

will create the base that the building will rely upon. This can<br />

take up to 4 weeks depending on the complexity of the project.<br />

Your engineer may ask for tests such as boreholes, or<br />

soakage tests to be undertaken. It is also advisable to take<br />

soil samples to analyse their waste classification, as this can<br />

have a large impact on the cost of the project. These can<br />

take two or three weeks for results from tests being carried out.<br />

Don’t miss our June issue’s<br />

Kitchen & Bathroom Supplement<br />

full of ideas to remodel and update<br />

Out from 1st June<br />

Obtaining quotes for services and utilities. This is<br />

also important for new-builds as the quotes provide<br />

contractors clear information at the beginning of the<br />

project and help prevent any unknown costs early in<br />

the build. This would usually take four weeks from contractors<br />

receiving information and drawings, to allow for a visit to the<br />

site and a competitive price to be drawn up. When obtaining<br />

quotations from contractors it is important for them to visit<br />

the site to understand access, ground levels and other external<br />

factors. To get an accurate quote you should also give them:<br />

• full but concise information on how long<br />

you wish for the build to take<br />

• clear detailed drawings of the plans<br />

• payment term information<br />

• clarification on whether you expect to hold a retention<br />

(a percentage of the project’s valuation which is held<br />

for a rectification period of the works). This is usually<br />

12 months at 5%, with 2.5% paid on completion and<br />

2.5% paid once the rectification period is complete<br />

Speak with local estate agents about the value the project<br />

could add and compare this against build costs to assess<br />

potential returns and whether the scheme is viable.<br />

Weigh up all of your costs against what you could<br />

gain from the project and make a decision!<br />

13 priceless-magazines.com<br />

<strong>May</strong> <strong>2021</strong> Kitchen and bathroom ad.indd 1 20/04/<strong>2021</strong> 16:38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!