2011 Arizona State Rail Plan - Arizona Department of Transportation
2011 Arizona State Rail Plan - Arizona Department of Transportation
2011 Arizona State Rail Plan - Arizona Department of Transportation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix D. Summary <strong>of</strong><br />
Operating <strong>Rail</strong>roads in<br />
<strong>Arizona</strong><br />
Table D.1 - Summary <strong>of</strong> Operating <strong>Rail</strong>roads in <strong>Arizona</strong><br />
<strong>Rail</strong>road Ownership Trackage Miles Speed Limits<br />
BNSF Berkshire Hathaway Inc.<br />
Union Pacific <strong>Rail</strong>road Union Pacific Corporation<br />
Class I <strong>Rail</strong>roads<br />
Short Line <strong>Rail</strong>roads<br />
690 (main line and branch<br />
lines)<br />
775 (main line and branch<br />
lines)<br />
70 mph (90 mph Amtrak)<br />
70 mph (79 mph Amtrak)<br />
Apache <strong>Rail</strong>way Abitibi Bowater 45 (main line and branch line) 35 mph<br />
<strong>Arizona</strong> & California <strong>Rail</strong>road <strong>Rail</strong>America 190 (106 miles in <strong>Arizona</strong>) 49 mph<br />
<strong>Arizona</strong> Central <strong>Rail</strong>road The Western Group<br />
<strong>Arizona</strong> Eastern <strong>Rail</strong>way Permian Basin <strong>Rail</strong>ways<br />
38.7 main line (+2 miles <strong>of</strong><br />
yard track)<br />
135 main line (+5 miles <strong>of</strong><br />
smelter trackage)<br />
10 mph<br />
20 mph<br />
Black Mesa & Lake Powell<br />
<strong>Rail</strong>road<br />
Navajo Nation/Hopi Tribe 78 40 mph<br />
Camp Navajo <strong>Rail</strong>road <strong>Arizona</strong> National Guard 38 10 mph<br />
Copper Basin <strong>Rail</strong>way ASARCO LLC<br />
(American Smelting And<br />
Refining Company)<br />
Freeport McMoRan Morenci<br />
Mine<br />
54.6 main line (+6 miles<br />
branches)<br />
25 mph<br />
Freeport McMoRan 15 Yard Limits<br />
San Pedro & Southwestern <strong>Arizona</strong> <strong>Rail</strong> Group 7.5 (main line) 20 mph<br />
APS Cholla Power <strong>Plan</strong>t <strong>Arizona</strong> Public Service<br />
7 (loop, yard and spur<br />
trackage)<br />
Yard Limits<br />
Grand Canyon <strong>Rail</strong>way Xanterra Parks & Resorts<br />
64 main line (+1 mile <strong>of</strong> yard<br />
trackage)<br />
40 mph<br />
<strong>Arizona</strong> <strong>State</strong> <strong>Rail</strong> <strong>Plan</strong><br />
March <strong>2011</strong><br />
A-51