Phases of energy
production
irst Phase:
The 13MW first phase became operational on 22
October 2013, and the project contributed to a major reduction
of carbon emissions in adherence with the Clean
Development Mechanism. The implementation of the
first phase was an important step in achieving Dubai’s
objectives to diversify energy resources. The first phase
is built up of about 153,000 photovoltaic cells, connected
to 13 transformers in inverter buildings. The output is
transformed to 33 kilovolts (kV), and generates 28 million
kWh of electricity annually. The first phase contributes
to an annual reduction of about 15,000 tonnes of carbon
emissions. The surface area of the project covers
280,000 square metres.