04.02.2022 Views

214010-020-mtn-home-2019-10-31-wfps-report

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DocuSign Envelope ID: 1DD36D19-77D0-4780-B72C-98AC28C4B145

Mountain Home Water Facilities Planning Study Update October 2019

3.3 highlights the modeled nodes in the water system that do not meet maximum day

demand plus fire requirements. Appendix A contains figures depicting the model results

report for this and all other model evaluations discussed in this section. The pink shaded

areas refer to the commercial areas where the higher fire flows are required.

Figure 3.3 – 2018 Available Fire Flow Deficiencies

CITY OF MOUNTAIN HOME | KA 214010-020 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!