Mountain Home Water Facilities Planning Study Update October 2019

will inevitably take place. Maintaining the plan and the planning tools will serve as the most effective

means for the city to proactively manage this crucial component of their existing infrastructure.

4.7 DECLINING BALANCE SUMMARY

4.7.1. Remaining Capacity

Calculations of remaining capacity for the system can be found in Appendix C. The

remaining firm capacity of the water system was estimated to be approximately 1,850

additional equivalent dwelling units (EDUs) before needing additional well supply in service.

This corresponds to a City population of 18,460. With the addition of a new 1,500-gpm well,

the water system would have an estimated remaining capacity of approximately 1,586 EDUs

(population 22,060).

For continued growth in the system, additional wells will be needed every 1,580 EDUs. If

the City supplies newly constructed wells with backup power, it is not anticipated that the

City will need additional storage within the 20-year planning period. Additional details on the

timing of these recommendations are included in Appendix D. Because it sometimes takes

years to permit, fund, design, and construct necessary improvements, Keller Associates

recommends that the City begin implementation of improvements well in advance of when

they are required.

4.7.2. Booster Station Considerations

Keller Associates also reviewed data for the upper and medium pressure zones to assess

available booster station capacities (see Appendix C).

In estimating the remaining capacity of the upper zone, the use of Well 14 (which can be

manually directed to the upper zone) was not considered in approximating the firm pumping

capacity. Additionally, in estimating remaining capacity of the medium pressure zone, the

existing PRV that services the zone was assumed to provide the firm backup supply of the

zone.

Based on this analysis, the medium pressure zone can add a total of approximately 318

EDUs before the booster pumping capacity at the booster station needs to be increased.

The upper pressure zone can add a total of approximately 240 EDUs before the booster

pumping capacity at the booster station needs to be increased. If Well 9 is used to supply

water to the medium pressure zone, listed as a priority 2 improvement in the recommended

CIP, it is anticipated that the zone can accommodate approximately 865 EDUs.

System

Wide

Pressur

e Zones

Table 4.4 – Declining Balance Summary

Improvement

Available

EDUs*

Approx.

Service

Population

Existing Condition 1,850 18,460

New Well 17 (1500 gpm) 3,436 22,060

New Well 18 (1500 gpm) 5,022 25,661

Additional Transmission varies varies

Medium Zone

Additional Pumping Capacity

318 NA

Upper Zone

Additional Pumping Capacity

240 NA

*Available EDUs is based on current number of users and is not adjusted to reflect vacancy rates, buildable lots,

or undeveloped land within the city limits.

CITY OF MOUNTAIN HOME | KA 214010-020 34